FW20B/0029: Retention Planning Permission for a single storey side extension with alterations to existing building.
1 Church View, Hollystown, Dublin 15
DecisionGrant permission & grant retention
Decided09 June 2020
Application typePermission and Retention
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 1 Church View, Hollystown, Dublin 15?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Chief Executives OrderSource: planningapi.agileapplications.ie / 95E9B95DC80E11EA9C54E03F49120A75.pdf / Document 679709Source PDF
- Final GrantSource: planningapi.agileapplications.ie / 1BA4B65DC84011EAA7B53464A927E5D1.pdf / Document 667560Source PDF
- ReportsSource: planningapi.agileapplications.ie / F1AAC9F9A4CB11EA860E00505692A522.pdf / Document 699441Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW24A/0474Permission for retention of an attic conversion including two dormer windows to the front elevation and roof extension with windows to the rear elevation of the original bungalow and two single storey extensions to the rear, with a total additional area of 143 sq.m to the Dormer Bungalow. / 0.1 km away / 06 January 2025Granted
- FW12B/0084Retention permission for 2 no. slit windows to the south west side of / 0.1 km away / 17 December 2012Granted
- FW12B/0017Relocation of boundary between existing dwelling at No. 44 Alderwood & / 0.2 km away / 03 May 2012Granted
- FW19B/0119The development will consist of a new single storey flat roof extensio / 0.2 km away / 26 November 2019Granted
- FW25A/0338Retention development will consist of vehicular entrance to the side/front of the site. A partial flat roof single storey extension connecting the existing dwelling to the game's room/art studio. Retention for single storey extension to the side connecting with partial flat roof single storey to existing house. Moving the existing entrance door into the retention works. Retention for single storey detached office to the side of the existing house. Planning permission will consist of a proposed new dormer roof to the front of the existing dwelling roof to bring more natural light into the kitchen/living area. A new stone cladding finish to the side elevations of the dwelling matching in with neighbouring stone finishes and all ancillary works. / 0.2 km away / 06 October 2025Granted
- FW12B/0046Retention Permission for 3 no. slit windows to the east side of existi / 0.2 km away / 25 July 2012Granted
- FW22A/0098A 10 Year PERMISSION for development of a site of c 9.3ha in the townlands of Hollystown and Yellow Walls on part of the former Hollystown Golf Course lands, Ratoath Road, Hollystown, Dublin 15, D15 C6258. The development will consist of a GAA Cluster Facility including: a) 4 no. floodlit GAA pitches (Pitches No’s 1 to 4) comprising; 1 x synthetic all weather pitch (Pitch No. 2) (145m x 90m with floodlights with a lux level of 350 mounted on 8 no. 20 metre high columns); 2 x sand-based grass pitches (Pitch No’s 3 and 4) (145m x 90m with floodlights with a lux level of 350 mounted on 8 no. 20 metre high columns per pitch);1 x sand-based grass pitch (Pitch No. 1) (145m x 90m with floodlights with a lux level of 500 mounted on 8 no. 30 metre high columns). All pitches will have GAA goal posts and ball stop netting (12m in height and 30m in length) to rear of same, scoreboards and 2 dugouts each, a railing around the perimeter of each of the sand-based pitches and 2.5m sports fencing around the perimeter of the all-weather pitch. The development will also consist of b) the renovation and alteration of the former 2 storey clubhouse (existing area: 678m2) with the alteration of the existing bar area to 2 no. team changing rooms and alteration of existing changing room layouts with new external door access, officials changing room, showers and toilets on the ground floor, retention of existing kitchen facilities, re-purposing of first floor to offices, storage space and team meeting space/multi-purpose room, including removal of external stairs. c) Development of new two-storey extension (area:1,276m2, height: 10.06m) to provide 6 no. team changing rooms, showers and toilets, baths and physio rooms, plant room and toilets for spectators, all on ground floor. Gymnasium, storerooms, office and physio space and team meeting space/multi-purpose room on first floor. New access stairs and lift as well as terrace and green roof and pv solar roof panels. d) the provision of a separate Indoor Training Facility (area: 820m2, height: 7.25m) including a 30m x 20m pitch, team tactics space, toilets, plant room and store for equipment. e) the construction of a Spectator Stand to the east of Pitch No.1 (area: 296m2, height: 7m) to accommodate 500 spectators with partial roof/cover and undercroft equipment store. f) Hurling wall (9m x 9.5m and 5m in height) with fenced in floodlit astro-turf hurling practice area. g) Maintenance and storage building (area: 128m2, height: 4.3m). h) Demolition of existing driving range and pro-shop shed (area: 72m2). In addition the development will include i) a walking/jogging trail with outdoor exercise equipment around perimeter of site, an outdoor training area (30m x 20m) and 100m long speed training area, a new access roadway and pedestrian entrance onto Ratoath Road, 3 no. pedestrian/cycle access gates to adjacent lands to south-east. Car Parking for 54 no. standard car parking spaces, 9 no. universal access spaces and 100 no. overflow spaces for intermittent use with a grasscrete finish, 2 no. coach spaces and bicycle stands for the parking of 100 no. bicycles. j) Earthworks drainage infrastructure and attenuation, an ESB substation (area: 42m2) and switch room, retaining structures, signage, landscaping and all other associated site development works above and below ground level. AI Received 24/10/2022 / 0.2 km away / 17 November 2022Granted
- FW12B/0041Planning permission for a single storey extension to side and all asso / 0.2 km away / 20 July 2012Granted