Site 11, Stadium Business Park, Ballycoolin Road, Dublin 11
Planning application FW21A/0190
DecisionGrant permission
Decided25 April 2022
Application typePermission
Source documents19
Site
What is on file
0refusal reasons13conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be carried out in accordance with lodged plans, particulars, specifications, and information as amended by Additional Information received 31/03/2022.Compliance
- 2Permitted use strictly as indicated on submitted plans (offices, workshops, accessories, training unit, storage, welfare facilities). Offices remain ancillary. No change of use, subdivision or amalgamation without prior permission.Occupancy
- 3Hours of operation: Mon-Fri 7:30-17:00, Sat 08:00-12:00. No operation on Sundays or Bank/Public Holidays.Occupancy
- 4Signage zones to be agreed in writing prior to commencement. No advertising or signage other than that shown on submitted drawings without prior permission.Design Materials
- 5No additional development above roof parapet level (air handling, storage tanks, ducts, external plant, aerials, antennas) without further planning permission.Design Materials
- 6Comply with iAcoustics Noise Impact Assessment recommendations. Updated noise assessment within 6 months of operation. Diesel HGVs not 'plugged in' overnight. Noise limits: Daytime 55dB LAeq, Evening 50dB LAeq, Night-time 45dB LAeq. No clearly audible/impulsive tones.Other
- 7Construction noise/dust management. No heavy machinery before 8am or after 7pm Mon-Fri, before 8am or after 1pm Sat. No work Sundays/Bank Holidays. No activity 7pm-8am. BS 5228:2009+A1:2014 compliance. Dust monitoring limit 350mg/m2/day. Air emissions/odours not to cause significant impairment.Construction Management
- 8No surface water/rainwater into foul sewer. Surface water drainage compliant with Greater Dublin Regional Code of Practice for Drainage Works Version 6.0. Proposal in accordance with Planning System and Flood Risk Management Guidelines.Wastewater Drainage
- 9Sign connection agreement with Irish Water prior to commencement of development.Water Services
- 10Tree felling/pruning by qualified contractor per BS 3998 (2010). Meeting with Site Foremen, Arborist, Parks Officer prior to works. Arboricultural Method Statement/Tree Protection Strategy by ARBECO Ltd adhered to. Tree & hedgerow bond of €20,000 lodged. Post-construction report and Certificate of Effective Completion required for bond release.Environment Ecology
- 11All service cables (electrical, TV, telephone, public lighting) run underground within the site.Compliance
- 12Prevent spillage/deposit of materials on adjoining roads. Developer responsible for full cost of repair for any damage to adjoining public road.Compliance
Planning a project near Site 11, Stadium Business Park, Ballycoolin Road, Dublin 11?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 75 pages of searchable text on file.Included in site brief
19 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 10 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
19 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- FW22A/0134Construction of a warehouse building (ground floor 540m2 and first flo / 0.1 km away / 26 October 2022Granted
- FW22A/0151Install 10KW of roof mounted solar panels on our unit (area of solar p / 0.1 km away / 01 September 2022Granted
- FW15A/0021Permission for development consisting of a canopy to existing yard spa / 0.2 km away / 08 July 2015Granted
- FW22A/0061For a development comprising: (i) construction of 5 no. industrial / w / 0.2 km away / 26 May 2022Granted
- FW24A/0481EStadium Business Park Investment Limited intends to apply for permissi / 0.2 km away / 16 January 2025Granted
- FW15A/0078Permission for the change of use of Unit 31 (412 sq.m.) from dog train / 0.2 km away / 16 July 2015Granted
- FW20A/00743 No. 8.0m tall flagpoles in the front grass verge and all associated / 0.2 km away / 16 July 2020Granted
- FW23A/0399Proposed development that amends the warehouse development permitted / 0.2 km away / 13 February 2024Granted