FW21A/0190: Permission for the construction of 4 n o. industrial units consisting of offices, workshops and accessories, a training unit and storage, welfare facilities, parking for cars and HGV, stormwater retention pond, signage, site fencing, gates lights and all associated works. AI received 31/3/2022
Site 11, Stadium Business Park, Ballycoolin Road, Dublin 11
DecisionGrant permission
Decided25 April 2022
Application typePermission
Source documents19
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Site 11, Stadium Business Park, Ballycoolin Road, Dublin 11?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / CA655ABF59CC11EC8DEF3464A927EB6F.tif / Document 725957Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / B2EE077CC57711ECA6AAB00CD1424F6C.pdf / Document 762900Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / FD60B2FBC57011ECA6AAB00CD1424F6C.pdf / Document 823547Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / CA655AC259CC11EC8DEF3464A927EB6F.tif / Document 727345Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FD60B2FDC57011ECA6AAB00CD1424F6C.pdf / Document 771880Source PDF
- Final GrantSource: planningapi.agileapplications.ie / A436FB66E32A11EC92FA84C5A68ABD3E.pdf / Document 761062Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / 77FF802DF09E11EC9F85D81265958418.pdf / Document 757347Source PDF
- ReportsSource: planningapi.agileapplications.ie / 25E16DC94EA811EC8643005056926BDB.doc / Document 705474Source PDF
- ReportsSource: planningapi.agileapplications.ie / 25E16DD64EA811EC8643005056926BDB.docx / Document 705477Source PDF
- ReportsSource: planningapi.agileapplications.ie / 83C057C6485E11EC8643005056929A5A.docx / Document 716198Source PDF
- ReportsSource: planningapi.agileapplications.ie / E32128514B8B11EC864300505692A522.pdf / Document 730557Source PDF
- ReportsSource: planningapi.agileapplications.ie / 3D1C494451E211EC86430050569232A4.docx / Document 734192Source PDF
- ReportsSource: planningapi.agileapplications.ie / B830504D47CF11EC8643005056924457.pdf / Document 739058Source PDF
- ReportsSource: planningapi.agileapplications.ie / E321285C4B8B11EC864300505692A522.docx / Document 740857Source PDF
- ReportsSource: planningapi.agileapplications.ie / C211CD41BA4011EC866500505692966A.doc / Document 765398Source PDF
- ReportsSource: planningapi.agileapplications.ie / FEB6F8F8BFC011EC866500505692966A.docx / Document 772171Source PDF
- ReportsSource: planningapi.agileapplications.ie / EBCE0DBABB0011EC866500505692A522.docx / Document 822834Source PDF
- ReportsSource: planningapi.agileapplications.ie / FEB6F90ABFC011EC866500505692966A.pdf / Document 823607Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW22A/0134Construction of a warehouse building (ground floor 540m2 and first floor 172 m2) comprising offices, welfare facilities, workshop, storage areas, parking, storm water retention pond, facility lighting, building signage and all other associated site ancillary and infrastructure works required to make the building operational. AI received 06Oct 2022 / 0.1 km away / 26 October 2022Granted
- FW22A/0151Install 10KW of roof mounted solar panels on our unit (area of solar panels 47.7 sq.m. roof area 104.9 sq.m.) and all associate site works, / 0.1 km away / 01 September 2022Granted
- FW15A/0021Permission for development consisting of a canopy to existing yard spa / 0.2 km away / 08 July 2015Granted
- FW22A/0061For a development comprising: (i) construction of 5 no. industrial / warehouse / logistics units contained within 3 no. blocks consisting of: (a) Block A, containing Unit 1 and Unit 2, warehousing / distribution / logistics units comprising 2,011.m each; (b) Block B, containing Unit 3 and 4, industrial / warehousing units comprising 1,381sq.m each; and Block C, containing Unit 5, a warehousing / distribution / logistics unit comprising 1,635sq.m. Each unit will be provided with ancillary office space and staff facilities; (ii) Creation of vehicular access point to the west of the site to provide for public access, repositioning of 2no. existing vehicular access points & the provision of 1 no. new vehicular access point, all 3no. access points to the north for servicing and deliveries; (iii) 135 no. car parking spaces (including 6 no. EV spaces and 5 no. reduced mobility spaces) and 80 no. bicycle parking spaces will serve the development; and (iv) The development will also include all associated SuDS drainage, landscaping, boundary treatments, lighting, CCTV, signage and site development works necessary to facilitate the development. / 0.2 km away / 26 May 2022Granted
- FW24A/0481EStadium Business Park Investment Limited intends to apply for permission for development comprising amendments to a previously permitted development (FCC Reg. Ref. FW22A/0061) at this site, Site Nos. 12 and 13 (containing Unit Nos. 1, 2, 3, 4, and 5), Stadium Business Park, Ballycoolin Road, Dublin 11. The proposed development will consist of: minor internal amendments, alterations to elevations, and provision of PV solar panels at roof level of all 5 no. units; the removal of Automatic Opening Vents (AOVs) at Unit No. 5; provision of new pedestrian and cycle access from Ballycoolin Road; the provision of an ESB substation and switch room to the west of Unit No. 1; minor site layout changes including the part relocation of permitted car and cycle parking, and provision of new motorcycle parking, all within the southern portion of the site; hard and soft landscaping; boundary treatments; cabling and ducting; and all associated site development works above and below ground. / 0.2 km away / 16 January 2025Granted
- FW15A/0078Permission for the change of use of Unit 31 (412 sq.m.) from dog train / 0.2 km away / 16 July 2015Granted
- FW20A/00743 No. 8.0m tall flagpoles in the front grass verge and all associated site works / 0.2 km away / 16 July 2020Granted
- FW23A/0399Proposed development that amends the warehouse development permitted under Fingal County Council Reg ref FW21A/0149 at this site. The proposed amendments are for design alterations to the Unit D warehouse and ancillary office building and to the associated site works within the Unit D curtilage to facilitate its use as a logistics enterprise/land terminal. The proposed amendments include: Reduction in height and volume of the warehouse building (c 4,195 sqm GFA), which also accommodates the ancillary office and driver welfare facilities (c. 725sqm GFA), inclusion of protective external canopies on northwest and southeast elevations, alteration of facade design and finishes and solar PV panels on the roof of the warehouse building; Associated signage on the northeast, southeast and northwest elevations. Also reconfiguration and alteration of associated site development works including: New HGV and vehicular site entrances along northern site boundary to Ballycoolin Road with separate access points for pedestrians, cars and HGVs; Relocation of the ancillary surface car park area (64 no. car parking spaces) to the east of the warehouse, 34 no. bicycle parking spaces (total), HGV parking bays, dock levellers, wash bay, trailer yard, fuel tank, fuel pump island, ESB substation; bin stores; landscaping and boundary treatment works, plant at roof level with associated screening. Site (c.2.42 ha) at Premier Business Park, Ballycoolin Road, Dublin 11. / 0.2 km away / 13 February 2024Granted