FW22A/0060: The development will consist of: A temporary single storey office development (753m2) for a period not greater than 7 years. The works will comprise a number of individually accessible office units with common toilet and welfare facilities around a central landscaped space; The provision of a permanent extension to the existing car park to provide 25no. additional spaces, 14 No. bicycle parking spaces; set down areas; and all associated site development, har/soft landscaping, site lighting and excavation works above and below ground.
Lands to the east of the Special Olympics Ireland HQ Building, Sport I
DecisionGrant permission
Decided26 May 2022
Application typePermission
Source documents9
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Lands to the east of the Special Olympics Ireland HQ Building, Sport I?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / DA5E334BDD0311ECB6C59C7BEFBB54FD.tif / Document 768317Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / DA5E334EDD0311ECB6C59C7BEFBB54FD.tif / Document 768320Source PDF
- Final GrantSource: planningapi.agileapplications.ie / DE470C33FEC711EC931684C5A68ABD3E.pdf / Document 822321Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / F4DD842D028811ED9FA5D81265958418.pdf / Document 770816Source PDF
- ReportsSource: planningapi.agileapplications.ie / 050A1BE3CBA611EC866800505692BE53.pdf / Document 742849Source PDF
- ReportsSource: planningapi.agileapplications.ie / 865A06EECAD111EC86680050569212E6.docx / Document 757725Source PDF
- ReportsSource: planningapi.agileapplications.ie / 58602856CBB211EC866800505692BE53.docx / Document 816971Source PDF
- ReportsSource: planningapi.agileapplications.ie / C48BB30BD50911EC8668005056929533.docx / Document 821369Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW23A/0051For permission/retention permission / 0.0 km away / 27 April 2023Granted
- FW14A/0135Permission for development at this site. The development will consist / 0.1 km away / 11 March 2015Granted
- FW14A/0125Permission for development that will consist of the demolition ofthe O / 0.1 km away / 18 November 2014Granted
- FW21A/0008The development is in the curtilage of the protected structure Abbotstown House. The development will consist of: a part two storey and part single storey office development (718m2) within the Lower Yard complex of Abbotstown House which incorporates the existing agricultural structures known as the Long Barn. The works will comprise;- The adaption and refurbishment of the existing single storey structures to provide office meeting and ancillary spaces (194m2); The construction of a two storey extension to provide office space, meeting spaces, reception and ancillary areas (524m2); illuminated external signage (20m2); The demolition of 2no modern stable buildings within the lower yard (130m2); The provision of an extension to the existing car park to provide 24no. additional spaces, bicycle parking; set down areas; and all associated site development, hard landscaping, site lighting and excavation works above and below ground. No works are proposed to the protected structure Abbotstown House as part of this development. / 0.2 km away / 22 March 2021Granted
- FW20A/0186Retention of a single storey portacabin for the purpose of accommodating sports support functions and erection of a concrete access ramp and associated and associated works. AI received 16/06/21 / 0.3 km away / 12 July 2021Granted
- FW15A/0063Permission for works to existing buildings known as the upper courtyar / 0.3 km away / 29 June 2015Granted
- FW25A/0173EPermission and Retention Permission for proposed development consisting of: 1. Cricket oval (156 m diameter field of play), permanent fixed seating for 4,240 spectators with access from the northeast and southwest, and perimeter fencing. 2. Two storey (12 m high) main pavilion building (4,477 sqm) comprising High Performance Centre (HPC) including 4 lane indoor cricket hall with viewing gallery, hall storage, fitness suite, medical and consulting rooms and HPC offices; Player and Match Official Area (PMOA) comprising 4 no. team changing suites, internal and external viewing areas over the oval, team analysis area, physio room, players and coaches changing facilities and utility room, changing and support accommodation for officials, team and official dining room, and anti-doping suite; and foyer, admin staff area, staff room, toilets, and venue control room. 3. Cricket oval floodlighting via 6 no. columns of maximum height 60 m approximately. 4. The provision of spectator concourse and service zone/route immediately around the cricket oval seating; 2 no. moveable sightscreen frames; maintenance facility; and 2 no. toilet blocks. 5. Arrivals plaza including the provision of 31 no. car parking spaces (including 2 no. EV spaces and 7 no. accessible spaces and 1 no. shared EV/accessible space) and 15 no. bicycle parking spaces for day-to-day and non-event/match day use. 6. Provision to the north of the proposed access road of a permanent cricket facility energy centre, provision of a media/outside broadcasting zone for all event/match days; and (a) provision of 150 no. car parking spaces (of which 15 no. are for permanent use and 135 no. for event/match use up to 4,240 attendance, of which there are 18 no. EV spaces and 2 no. accessible spaces and 1 no. shared EV/accessible space) and 184 no. bicycle parking spaces; (b) provision of an event/match overlay area to accommodate a further 170 no. car parking spaces and further bicycle parking spaces for attendances in excess of 4,240 spectators. 7. Provision of serviced overlay areas to accommodate up to a further approximately 7,760 non-permanent seats required on an occasional basis (to bring the total occasional capacity to 12,000 seats) and for concessions, food and beverage, corporate activities, spectators’ activation zones for use only on match/event days, and provision of permanent utilities and services in the form of water, electricity and waste water. 8. Provision of new outdoor grass surface practice nets providing 16 strips, and retention permission of existing access, landscaping and 26 no. car parking spaces at the existing nets for use on a permanent basis. 9. New access road with new entrance incorporating totem signage, pedestrian crossing, carriageway, cycle lanes, footpaths, bus turning area, bus/taxi drop off area, bus lane reservation, upgrade to 2 no. existing pedestrian and bicycle crossings and junction improvements on Ballycoolin Road. 10. 8 no. bus/coach stops, bus and coach turning area/terminus, 30 no. bicycle parking spaces, upgrade and modification to existing vehicular roads, and widening and resurfacing of existing footpaths/cycleways, new gated pedestrian/cycle entrance to the south of the campus, provision of new cycle routes and footpaths promoting active travel into and within the campus. 11. Provision of temporary haul road to facilitate the construction of strategic drainage infrastructure. 12. Temporary provision of a construction compound for the proposed scheme north of the proposed access road prior to completion of the proposed development. 13. Reprofiling of land, extensive landscaping, necessary services and infrastructure, diversion and undergrounding of existing overhead power lines, 2 no. substation kiosks and transformers, and all associated site works above and below ground including temporary works required to facilitate the efficient and safe ongoing operation of the campus. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS). The proposed development is located within the historic estate and attendant grounds of Abbotstown House which is a protected structure (RPS No. 0683), and adjacent to protected structures Abbotstown Gate Lodge (RPS No. 939), Irish Institute of Sport (RPS No. 0940) and St. Coemhin’s Church (in ruins) and Graveyard (RPS No: 0684). Additional information received 01/08/25 Significant Additional Information received 08/08/2025 / 0.3 km away / 02 October 2025Granted
- FW21A/0076Permission for the adaption and refurbishment of the existing single storey lean-to structure known as 'Cross Block Wrest' to provide office and meeting spaces (123m2),; internal interlinking with the abutting upper courtyard office development; and all associated site development, hard landscaping and excavation works above and below ground. No works are proposed to the protected structure Abbotstown House as part of the development. / 0.3 km away / 21 June 2021Granted