FW22A/0142: Planning permission for the retention and completion of amendments to the development permitted under Reg. Ref.: FW21A/0146 on a site to the north of Northwest Logistics Park, Ballycoolin, Dublin 15 (formerly known as Northwest Business Park). The application site is located to the west of Kilshane Avenue, to the south of Bay Lane and is bound by greenfield lands to the west. The proposed amendments relating to permitted warehouse / logistics development (Unit 900) comprise the following: • Amendments to the permitted northern security fence boundary, relocating it southwards to accommodate future development to the north of the site (under Reg. Ref.: FW22A/0066). • Provision of an access control barrier at the entrance to the development; • Amendments and rearrangement of permitted bicycle & smoking shelters due to proposed alteration to northern fence line. • Amendments to the permitted ESB substation including relocation and provision of an ESB vehicle set down area. • Amendments to the permitted plant areas: the permitted external yard plant enclosure is increased to accommodate mechanical plant requirements, and an additional electrical plant room with a gross floor area of c.115 sq.m is proposed to the southern façade of the main warehouse / logistics building. • Amendments to the permitted sprinkler tank and pump house, which are repositioned, and the sprinkler valve house area which is reduced in scale. • Amendments to perimeter footpaths along the northern and western building frontages. • Amendments to the permitted grade doors, including the omission of 1 no. grade door and repositioning of 1 no. grade door along the northern facade. • Amendments to and reconfiguration of the internal layout of the permitted warehouse / logistics unit including provision of an additional storeroom, relocation of a server room and the reconfiguration of a driver access room & pallet truck charging points. • Associated amendments to building facades, including alterations to the location of permitted green walls, and provision of an external fire escape stair to the southern façade. • Provision of a communications antenna c. 2 metres in height at roof level. • Alteration to the route of permitted underground foul sewer connection to the southwest of the site, including associated alteration to the development boundary to facilitate the alteration. • All associated and ancillary works.
Site to the north of Northwest Logisticstic Park, (Formerly known as
DecisionGrant permission & grant retention
Decided05 September 2022
Application typePermission and Retention
Source documents10
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / 88142ABC2D2511EDB7149C7BEFBB54FD.tif / Document 759049Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / 88142ABF2D2511EDB7149C7BEFBB54FD.tif / Document 758598Source PDF
- Final GrantSource: planningapi.agileapplications.ie / F7A49E794AF111EDB6C7DC2148FE7E72.pdf / Document 823325Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / CC38DCA45EA511ED9FFAD81265958418.pdf / Document 821647Source PDF
- ReportsSource: planningapi.agileapplications.ie / 2160C79D131411ED86740050569212E6.pdf / Document 746366Source PDF
- ReportsSource: planningapi.agileapplications.ie / 2ABFBF1514AB11ED867400505692DF5E.pdf / Document 747977Source PDF
- ReportsSource: planningapi.agileapplications.ie / 3FA44703133111ED86740050569212E6.docx / Document 750017Source PDF
- ReportsSource: planningapi.agileapplications.ie / 5C879A1D0F1F11ED86740050569232A4.pdf / Document 752825Source PDF
- ReportsSource: planningapi.agileapplications.ie / 639E0EBA21F811ED8674005056926BDB.docx / Document 817439Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW21A/0146The proposed development consists of the following: / 0.0 km away / 06 January 2022Granted
- FW23A/0100Retention permission is sought for the following: -Provision of solar panels (with an area of c.335 sq.m in total) at roof level of the warehouse/logistics unit. -Amendments to the permitted northern boundary treatment, to comprise 1.8m high fencing atop a plinth wall, pending the delivery of future development to the north of site (under Reg. Ref.: FW22A/0066). The application site is located to the west of Kilshane Avenue, to the south of Bay Lane and is bound by greenfield lands to the west. / 0.0 km away / 01 June 2023Granted
- FW13A/0133Planning permission and Retention planning permission is sought by GTO / 0.1 km away / 05 February 2014Granted
- FW22A/0066The proposed development consists of the following: Construction of a high technology manufacturing unit (for the manufacturing of high technology electrical components), with a total gross floor area (GFA) of 23,6000 sq.m (including ancillary office space of 2,318 sq.m. at ground and first floor levels), and with a main parapet height of c. 12 metres and maximum height of 14.5 metres. The proposed unit will be known as Unit 901; Provision of a link corridor between the proposed high technology manufacturing unit and Unit 900 to the south (logistics/warehouse unit permitted under Reg. Ref. FW21A/0146); The provision of 562 no. car parking spaces, dedicated bus drop off and 275 no. bicycle parking spaces along with HGV loading bays and a service yard to the west of the proposed unit. The vehicular access to the unit will be provided via two entrances from the roundabout proposed under Reg. Ref. FW21A/0146, which provides access to Kilshane Avenue to the east. The development also includes rooftop plant for the proposed unit, an ESB substation with switchroom, 2 no. emergency generators, 2 no. sprinkler/water tanks and 2 no. pumphouses, 2 no. smoking shelters, bicycle shelters, landscaping, boundary treatments, entrance gates, site lighting, all associated site development works, underground foul and storm water drainage services and attenuation areas including connections to existing/permitted services infrastructure and all ancillary works. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application and the EIAR will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. The application site (with an area of c. 5.9 hectares) is located to the north of the warehouse/logistics development (Unit 900) permitted under Reg. Ref. FW21A/0146, to the northeast of Kilshane Avenue, to the south of Bay Lane and is bound by greenfield lands to the west. / 0.1 km away / 01 June 2022Granted
- FW25A/0166EWe, Earlsland Corporation Unlimited Company, intend to apply for planning permission for development on lands adjacent to Unit 900, Northwest Logistics Park, Ballycoolin, Dublin 15. The application site is located to the west of Unit 900, which is accessed from Kilshane Avenue, is situated to the south of Bay Lane, and is bound to the west by the lands where Ellipse Logistics Park is under construction. The proposed development is for an extension of the existing warehouse / logistics unit to provide an additional 9,080 sq.m of warehouse / logistics floor space, comprising one level with a maximum height of c. 17.09m. The proposal includes an extended service yard and dock levellers, plant rooms, PV panels at roof level, foul and surface water drainage, landscaping, boundary treatment, lighting and all associated works. Additional Information Received 18/07/2025 Clarification of AI received 16/10/25 / 0.2 km away / 11 November 2025Granted
- FW20A/0176The development will consist of the construction of an internal first and second floor mezzanine floor of 830 square metres, within the existing Industrial Building of measuring 2,920 square metres, for storage purposes only. Two new internal access stairs and all associated works. The removal of the existing signage measuring 22m2 located to the front (South) elevation and replacement with new 11.1m2 non illuminated corporate signage, provision of new signage above all twelve loading bay doors measuring 9.7m2 each. New signage positioned as: one to south elevation, one to west elevation, eight to north elevation, two to east elevation. / 0.2 km away / 03 December 2020Granted
- FW22A/0005The proposed development comprises the fitting out as a canteen, with accompanying sanitary accommodation and office areas of the second floor level of an existing extension to the north of Unit 624, Northwest Business Park, Ballycoolin, Dublin 15, D15 ND71. All of the proposed works are to be carried out within an area of 380 sq.m. on the existing second floor level. No changes are proposed to the existing elevations other than the addition of 4 No. 1800 mm wide x 600 mm high ventilation louvres above the existing second floor glazing. Otherwise the appearance of the extension will be retained as permitted under Reg. Ref. FW18A/0181 and as subsequently amended by Planning Permission Reg. Ref: FW20A/0082. / 0.2 km away / 07 March 2022Granted
- FW20A/0082For changes to planning granted under reference no. FW19A/0086, for the reposition of a generator to avoid underground drainage and omission of enclosure screen for generator & associated flue along with changes to planning granted under reference no. FW18A/0181, for the relocation & redesign of the bike shelter, additional 9 no. bicycle spaces, relocation & redesign of the temporary modular building unit, installation of a smoking shelter. Minor revisions to the carpark layout & revision of the site layout, additional 15 no. car park space, addition of a pedestrian entrance gate, omission of small grassed area & security hut, reduced landscaping plan, addition of external air conditioning plant & revised design for the sprinkler pump house, addition of an external caged access ladder & edge protection railing to the rear of the original building. Changes to the fenestration of the north elevation to include louvers replaced with windows in the office block, additional louvres & larger double doors installed in the plantroom & a louvred lantern roof section constructed above the plantroom. / 0.2 km away / 27 July 2020Granted