GrantedDecided 24 October 2022Fingal County Council

FW22A/0193: Development and retention permission for development at this c. 3.23 Ha. site at Newtown, Kilshane Cross, Co. Dublin. The development amends a permitted warehouse development (as granted under FCC Reg. Ref. FW20A/0126 and amended by FCC Reg. Ref. FW22A/0108). This application pertains to lands relating to Unit No. 3. The proposed amendments will principally consist of the following modifications to permitted Warehouse Unit No. 3: Modifications to the HGV entrance to the west comprising the addition of a traffic island and provision of sliding gates in lieu of permitted swing gatesi the addition of a sprin kier tank and pump room; the addition of bike shelters; the repositioning of the heat pump enclosure; and all associated development works above and below ground. Retention permission is sought for the following modifications to permitted Warehouse Unit No. 3: Revised ground floor layout including the replacement of 4 No. WC's with a first aid room and multi faith room, replacement of the staff facility and office with 'grey box' area (space that is subjectto future tenant fit-out) with associated removal of internal doors to the warehouse, and minor reduction of the length of the marshalling office (by 120mm) (no change to permitted gross floor area); modification of the roof design including minor increase of the office parapet height from 11.9 metres to 12 metres (100mm increase), minor increase ofthe warehouse parapet height from 17 metres to 17.070 metres (70mm increase), repositioned skylights and addition of access hatches and automatic open ventsi repositioned and revised elevational signage (1 No. elevational sign to be provided on the north and west elevation, each measuring 7.28 metres x 1.815 metres)j revised parking layout including the reduction of the total number of car parking spaces from 146 No. to 139 No.; modifications to boundary treatments including the addition of a gate and fencing tothe fire tender access tothe east; addition of a security barrier to the staff/visitor car parking entrance/exit to the west; addition of a cycling path; reorientation of the ESB substation and increase in size from c. 37.5 sq m to c. 63.4 sq m; elevational changes including reduction of precast concrete wall cladding, the repositionlng of fire escape doors, the repositioning of green walls and the repositioning of an external window to the west of the marshalling office; addition of fire corridors; reduction of granite paving and replacement with landscaping adjacent to the entrance to the ancillary office; and all associated development works above and below ground.

Newtown, Kilshane Cross, Co Dublin
DecisionGrant permission & grant retention
Decided24 October 2022
Application typePermission and Retention
Source documents9

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Fingal is in progress.

Conditions

No conditions

No conditions are on record for this application yet.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.