FW25A/0500E: Retention Permission is sought for the following modifications to Unit No. 3: a new staff entrance with a new external canopy provided over the entrance (north elevation); ground level external plant within a new acoustic louvered enclosure; new paladin security fencing (2.4 meters high) along the eastern and southern boundaries; 2 no. external acoustic louvres on the west elevation; and all associated development works.
A c. 3.23 Ha Site at Maersk, Unit No. 3, FW25A/0501E, Newtown, Kilshan
DecisionGrant permission for retention
Decided27 January 2026
Application typeRetention
Source documents8
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / FW25A.0500E_D.pdf / Document 1159810Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW25A.0500E_CE.pdf / Document 1159809Source PDF
- Final GrantSource: planningapi.agileapplications.ie / FW25A-0500E.pdf / Document 1165830Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW25A_0500E.docx / Document 1150132Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW25A0500E.docx / Document 1156136Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW25A-0500E.docx / Document 1156354Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW25A.0500E_Air_and_Noise_Report.pdf / Document 1158198Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW22A/0193Development and retention permission for development at this c. 3.23 Ha. site at Newtown, Kilshane Cross, Co. Dublin. The development amends a permitted warehouse development (as granted under FCC Reg. Ref. FW20A/0126 and amended by FCC Reg. Ref. FW22A/0108). This application pertains to lands relating to Unit No. 3. The proposed amendments will principally consist of the following modifications to permitted Warehouse Unit No. 3: Modifications to the HGV entrance to the west comprising the addition of a traffic island and provision of sliding gates in lieu of permitted swing gatesi the addition of a sprin kier tank and pump room; the addition of bike shelters; the repositioning of the heat pump enclosure; and all associated development works above and below ground. Retention permission is sought for the following modifications to permitted Warehouse Unit No. 3: Revised ground floor layout including the replacement of 4 No. WC's with a first aid room and multi faith room, replacement of the staff facility and office with 'grey box' area (space that is subjectto future tenant fit-out) with associated removal of internal doors to the warehouse, and minor reduction of the length of the marshalling office (by 120mm) (no change to permitted gross floor area); modification of the roof design including minor increase of the office parapet height from 11.9 metres to 12 metres (100mm increase), minor increase ofthe warehouse parapet height from 17 metres to 17.070 metres (70mm increase), repositioned skylights and addition of access hatches and automatic open ventsi repositioned and revised elevational signage (1 No. elevational sign to be provided on the north and west elevation, each measuring 7.28 metres x 1.815 metres)j revised parking layout including the reduction of the total number of car parking spaces from 146 No. to 139 No.; modifications to boundary treatments including the addition of a gate and fencing tothe fire tender access tothe east; addition of a security barrier to the staff/visitor car parking entrance/exit to the west; addition of a cycling path; reorientation of the ESB substation and increase in size from c. 37.5 sq m to c. 63.4 sq m; elevational changes including reduction of precast concrete wall cladding, the repositionlng of fire escape doors, the repositioning of green walls and the repositioning of an external window to the west of the marshalling office; addition of fire corridors; reduction of granite paving and replacement with landscaping adjacent to the entrance to the ancillary office; and all associated development works above and below ground. / 0.0 km away / 24 October 2022Granted
- FW20A/0126The development will comprise the provision of 4 No. warehouses with marshalling offices, ancillary office space, staff facilities and associated development. The buildings will have a maximum principal height of 17.070 No. metres to the top of the parapet above ground floor level and will comprise the following areas: Unit 1 will have a gross floor area of 21,578 sq.m. including a warehouse (20,252 sq.m.), marshalling office (66 sq.m.), ancillary office space (1,216 sq.m.) and plant (44 sq.m.); Unit 2 will have a gross floor area of 9,206 sq.m. including a warehouse (8,347 sq.m.), marshalling office (66 sq.m.), ancillary office space (757 sq.m.) and pant (36 sq.m.); Unit 3 will have a gross floor area of 16,525 sq.m. including a warehouse (15,478 sq.m.), ancillary office space (944 sq.m.) and plant (37 sq.m.); and Unit 4 will have a gross floor area of 7,342 sq.m. including a warehouse (6,648 sq.m.), marshalling office (66 sq.m.), ancillary office space (589 sq.m.) and plant (39 sq.m.). A gate house with a gross floor area of 14 sq.m. will be positioned to the south-west corner of the site. The development will also include the repositioning of the access from the L3125 Road to the north of the site to provide a new entrance and a second vehicular access will be provided from the R135/Elm Road to the south-west. Road upgrade works are proposed along the L3125 to the north of the site which include the partial upgrade of Kilshane Cross signalised junction to incorporate a left turning lane and upgraded signals on the L3125 Local Road eastern approach arm and the provision of cycle paths and pedestrian footpaths. There will also be internal roadways; pedestrian access; 502 No. ancillary car parking spaces; bicycle parking; HGV parking and yards; level access goods doors; hard and soft landscaping; boundary treatments; ESB substations; signage; PV panels; lighting and associated site development works above and below ground. The total gross floor area of the development is 5,763 sq.m. (including warehouse structures, gate house and ESB substations). Add Info received 24th November 2020. / 0.1 km away / 08 March 2021Granted
- F18A/0146A storage and distribution centre for new imported vehicles with a tot / 0.2 km away / 06 March 2019Granted
- FW25A/0501EPermission is sought for the omission of an existing temporary canopy and the erection of a new level access canopy (6.8 meters) adjacent to the existing building. Retention permission is sought for the following modifications to Unit No. 4: the removal of permitted signage panel on the north elevation; repositioning of signage panels and replacement signage on the east, south and west elevations (replacement signage: 7.28m x 1.81m); the provision of an additional sprinkler tank (c. 103 sq m); extension of the existing pump house (additional c. 20 sq m); revised boundary treatment surrounding the sprinkler tank and pump house area including replacement fencing and entrance gates; repositioned turning circle area; realignment of the running track and associated landscaping works; ground level external plant within a new acoustic louvered enclosure; 2 No. external acoustic louvres on the east elevation; and all associated development works. / 0.2 km away / 27 January 2026Granted
- FW22A/0199IPUT plc intend to apply for permission for development at this c. 1.405 Ha.site at Newtown, Kilshane Cross, C0. Dublin. The development amends a permitted warehouse development (as granted Under Ref FW20A/0126, subsequently part amended by FCC Reg. Ref. FW22A/0108 (Unit No. 2) and proposed to be part amended by a live application (FCC Reg. Ref. FW22A/0193 - Unit No. 3). The subject application pertains to lands relating to Unit No. 4. The proposed amendments will principally consist of the following modifications to permitted Warehouse Unit No. 4: Revised ground floor and first floor layout including the reduction in size of the marshaling OTice from c. 65.9 sq m to C. 50.7 Sq m and corresponding increase to the warehouse area from c. 6,036.2 Sq m toC. 6,051.4 Sq m (no change to total permitted gross floor area); modification of the roof design Including a minor increase of the warehouse parapet height from 17.05o metres to 17.070 metres (2omm increase), a minor decrease of the ancillary office parapet height from 8.3 metres to 8.25 metres (5omm decrease), revised PV panel layout, revised roof light, revised AOV (Automatic Opening Vent) layout, and omission of roof hips; revisions to staff/visitor car parking entrance"ëexit to the east comprising the addition of a traffic island with security barriers; revisions to HGV entrance/exit layout to the east comprising the addition of a traffic island with security barrier and sliding gate; provision of yard extension to the south (c. 60.8 sq m) including additional security gates for maintenance access point; increase in electric charging spaces from 2 No. to 6 No. (no change in overall total quantum of car parking spaces permitted); addition of a cycle path and amendments to pathways and landscaping; the addition of covered bike spaces in lieu of previously uncovered stands and increase from 10 No. spaces to 11 No. spaces; revised fire tender layout; addition of a sprinkler tank (c. 88.3 sq m) and pump house (c. 30 sq m); revised Variable Refrigerant Flow Heat Pump compound location and layout; repositioning of the ESB substation and addition of a maintenance room, increasing the size from c. 24.4 sq m to c.36 sq m; revised graded access door locations; elevational changes including reduction of concrete façade on the eastern elevation, amended glazing arrangement, the repositioning of green walls, the repositioning of fire escape doors and the addition of fire escape routes; and all associated development works above and below ground. / 0.2 km away / 24 October 2022Granted
- FW22A/0108The development amends a permitted warehouse development (as granted under FCC FCC Reg. Ref. FW20A/0126), specifically lands relating to Unit No. 2. The proposed amendments will principally consist of the following modifications to permitted Warehouse Unit No. 2: The change of use of ancillary office space at first floor level (c. 264 sq m) to storage space; the addition of an internal loading platform; revised ground floor layout including the addition of an assembly room, alteration of the office layout and replacement of the marshalling office with truckers toilet (no change to permitted gross floor area at ground floor level); revised Photovoltaic Panels (PV) arrangement (reduced from 392 to 138 No. and reduced area from c. 638 sq m to c. 247 sq m); provision of 3 No. elevational signs (each measuring 5 metres x 2 metres) on the north, south and west elevations; revised parking layout including the reduction of the total number of car parking spaces from 81 No. to 80 No.; modifications to HGV yard layout including the addition of 18 No. van parking spaces in the permitted yard area; addition of a traffic island to the HGV entrance to the west; modifications to boundary treatments including addition of a gate and fencing to the fire tender access to the east; addition of a security barrier to the staff/visitor car parking entrance/exit to the west; extension of permitted cycle path and provision of a bike shelter; addition of a WEEE store; provision of a canopy over a proposed bailer and compactor zone; reorientation of the heat pump enclosure; elevational changes including reduction of precast concrete wall cladding to loading docks and the addition and repositioning of fire escape doors; and all associated development works above and below ground. Retention permission is sought for the modification of the roof design of permitted Unit No. 2 including a minor increase to parapet height from 17.02 metres to 17.07 metres. / 0.2 km away / 19 July 2022Granted
- FW23A/0052The development part amends a permitted warehouse development (as granted under FCC Reg. Ref. FW20A/0126, subsequently part amended by FCC Reg. Ref. FW22A/0108 (Unit No. 2), FCC Reg. Ref. FW22A/0193 (Unit No. 3), FCC Reg. Ref. FW22A/0199 (Unit No. 4) and FCC Reg. Ref. FW22A/0206 (Unit 1), and proposed to be part amended by a live application (FCC Reg. Ref. FW22A/0318 – Unit No. 1). The proposed development amendments will principally consist of: the provision of new entrance and wayfinding signage as follows: 1 No. totem sign at the southern entrance of the development (7 metres high), 1 No. totem sign at the northern entrance of the development (7 metres high), 1 No. totem sign at the gatehouse entrance towards the south of the site (3.5 metres high), 1 No. totem sign to the south-east of Unit No. 1 (2 metres high), 1 No. totem sign to the south-west of Unit No. 2 (2 metres high), 1 No. totem sign to the north-west of Unit No. 3 (2 metres high), 1 No. totem sign to the north-east of Unit No. 4 (2 metres high), 1 No. ‘park and amenities’ information sign to the north-east of Unit No. 4 (2 metres high), and 1 No. ‘parks and amenities’ directional sign located at the southern entrance to the running track (0.89 metres high); and all associated development works above and below ground. Retention permission is sought for the following modifications: a multi-use games area (MUGA) (c. 295 sq m) to the west of Unit No. 4 with an outdoor gym area (c. 135 sq m) and a perimeter gravel walkway; a running track along the western/north-western boundary of the site; alterations to the permitted gatehouse at the southern site entrance including the reorganisation of the internal layout, minor decrease in overall width from 3.4 metres to 3.33 metres (c. 67 mm reduction), minor decrease in overall length from 5.599 metres to 5.532 metres (c. 67 mm reduction), minor increase in overall height from 3.35 metres to 3.385 metres (c. 35 mm increase), elevational changes including the addition of 4 No. aluminium feature fins to the east elevation and relocation of the pedestrian entrance door on the east elevation to accommodate the internal layout changes, and modifications to the roof design to include the provision of an aluminium brise soleil surround to the perimeter of the gatehouse; and all associated development works above and below ground. / 0.2 km away / 03 May 2023Granted
- FW24A/0373EConstruction of a central warehouse & logistics distribution centre, with an overall GFA of c. 26,865 sq.m, including an ancillary office and welfare area of c. 1,352 sq.m. and associated standalone services buildings of c.121 sq.m on a site area of c. 5.238 Ha. The warehouse building is orientated east-west across the subject site, with a primarily rectilinear form complete with stepped ground floor office / staff entry level, located to the west. The proposed warehouse building has an overall length of c. 225 metres, with a depth of c. 126 metres and a parapet height of c. 21 meters above ground level to the North, South and East and c. 24.75 meters to the West. The proposed office has a parapet height of c. 15 meters above ground level. A sprinkler tank with associated pumphouse complete with provision for a generator compound, switch room and transformer room are located along the northern boundary of the site. A substation is proposed centrally on the southern boundary. Parking and office space are orientated towards the front / west of the site, facing the estate entrance. The proposal provides for 161 no. car parking spaces (including 8 no. accessible parking spaces and 35 EV charging spaces), 8 motorcycle spaces, accessed from the southwest of the site. A separate pedestrian and bicycle access to 50 bicycle parking spaces is located centrally on the southern boundary adjacent to the office. A service yard and loading bays are proposed to the south of the building, with a single HGV access point provided in the southeastern corner. There are 24 no. loading docks proposed along with 3 no. grade access doors. Solar panels are proposed for c. 10% of the roof area. Landscaping and screening is proposed throughout the site and along the southern boundary complete with upgrading of pedestrian and bicycle access routes complete with all associated works and services. / 0.2 km away / 06 November 2024Granted