FW24A/0103: Permission to erect a new 5.2m v 1.85m x 2.8m stainless steel and glass bus shelter with 1 No. double sided internally illuminated advertising panels of 2 sq. m area per side (4 sq. m total) located on the public footpath at Bus Stop No. 324 Harristown Road, Horizon Logistics Park, Swords, Co. Dublin, along with all associated site works.
Bus Stop No. 324 Harristown Road, Horizon Logistics Park, Swords, Co.
DecisionGrant permission
Decided02 May 2024
Application typePermission
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bus Stop No. 324 Harristown Road, Horizon Logistics Park, Swords, Co.?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / FW24A_0103_D.pdf / Document 1031815Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW24A_0103_CE.pdf / Document 1031814Source PDF
- Final GrantSource: planningapi.agileapplications.ie / FW24A_0103_FG.pdf / Document 1039036Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW23A/0278A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the NIS will be available for inspection or purchase for a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority We, HPREF Dublin Office DevCo 1 Limited, intend to apply for planning permission for development at Horizon Logistics Park (known as Site G1), off the R108, at the townlands of Silloge and Harristown, St. Margaret's, Swords, Co. Dublin. The proposed development is located to the east of the development permitted under Reg. Ref.: FW20A/0187 (known as the Site N development), and to the southwest of the Harristown Bus Depot. The proposed development consists of the following: o The construction of 1 no. light industrial / warehouse (including wholesale use) / logistics building (Unit G1) with a gross floor area (GFA) of c. 4,203 sq.m (including 656 sq.m of ancillary welfare and office space over two levels). The proposed building will have a main parapet height of c. 14.8 metres. o Provision of 44 no. car parking spaces (including 3 no. disabled parking spaces and 5 no. electrical vehicle parking spaces), 44 no. bicycle parking spaces within bicycle shelter structures, and 5 no. motorcycle spaces; o Provision of an ESB substation (with a GA of c. 35.75 sq.m) to the southeast of the main building. • Provision of a service yard and loading bays to the east of the main building, bound by a 2.4m high fence. Provision of a recycling and bin store to the south of the service yard. Provision of access arrangements to the proposed development including an access from the estate road to the west of the site and provision of new cycle and pedestrian path alongside the estate road. Provision of landscaping and amenity space to the north and east of the site, planting, and boundary treatments. The proposal includes signage zones, PV panel zones at roof level, building plant, site lighting, security fencing, and all associated site services and development works, including underground foul and storm water drainage network and sustainable urban drainage systems / 0.2 km away / 10 November 2023Granted
- FW22A/0079The proposed development consists of the following at Site C: The construction of 1 no. light industrial/warehouse (including wholesale use) / logistics building (Unit C) with a gross floor area (GFA) of c. 6,627 sq.m (including welfare and reception areas over two levels and c. 216 sq.m of ancillary office space). The proposed building will have a maximum height of c. 15.2 metres. Provision of 58 no. car parking spaces and 14 no. bicycle parking spaces. Provision of an ESB substation and switchroom. Provision of a service yard and HGV loading/unloading areas, with associated loading bays to the west of the proposed light industrial/warehouse/logistics building. Provision of access arrangements to the proposed development including an access from the permitted roundabout to the southwest of the site, and from the main estate access road to the east of the site. The proposed development consists of the following at site E: The construction of 2 no. light industrial/warehouse (including wholesale use) / logistics buildings (Units E1 and E2) with a gross floor area of 12,578 sq.m and 11,457 sq.m. respectively (including welfare and reception areas over two levels for each building and ancillary office space of c. 565 sq.m. and c. 497 sq.m respectively). The proposed buildings will have a maximum height of c. 15.6 metres. Provision of 239 no. car parking spaces (125 no. for Unit E1 and 114 no. for Unit E2) and 76 no. bicycle parking spaces (38 no. for each unit). Provision of an ESB substation and switchroom, 2 no. sprinkler tanks and 2 no. pumprooms. Provision of service yards and HGV loading/unloading areas, with associated loading bays to the south of the proposed light industrial/warehouse/logistics buildings. Provision of access arrangements to the proposed development including accesses from the main estate access road to the north, and the provision of a new estate road along the eastern side of Unit E2, proceeding to the rear of both buildings and providing access to the service yards. The proposal includes landscaping and planting, 3 no. bin stores/recycling structures, PV panel zones at roof level, boundary treatments, signage zones, site lighting, security fencing and gates and all associated site services and development works, including underground foul and storm water drainage network and sustainable urban drainage systems (including the provision of an integrated construted wetland to the south of Site E). An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application. AI received 19/8/2022 / 0.3 km away / 10 October 2022Granted
- FW23A/0259The development will consist of the following: / 0.4 km away / 23 October 2023Granted
- FW22A/0260A) Provision of an internal ESB substation and switch room within the previously granted Unit(N8), Reg Ref: FW20A/0187, (b) 1no. 10.075 metres diameter, 9.67 metres high sprinkler tank and single storey 30m2 pump room, (c) 1 no. metal clad plant enclosure over 3 storeys 27x8x13.5m high, situated to rear if the unit, (d) 2 no ancillary metal clad plant enclosures, 3m high each, situated to side and rear of the unit, (e) Minor elevational changes to allow for ESB & exit doors, (f) Minor alterations to existing car park area - no change to existing numbers, all of the above to include associated site services works on an application area of 4.680 acres. / 0.4 km away / 20 December 2022Granted
- FW25A/0055EPermission is sought for the following proposed development: The construction of 5 no. light industrial / warehouse (including wholesale use) / logistics units, including entrance / reception areas and ancillary office space, and 1 no. café / retail unit with associated seating. The proposed units will have an overall combined total gross floor area (GFA) of c. 38,156 sq.m (along with ancillary ESB substations and pumphouses with a combined GFA of 582.4 sq.m.), on a site of c. 14.2 Ha. The proposed development consists of the following at Site F: • The construction of 1 no. light industrial/warehouse (including wholesale use) / logistics building (Unit F2) with a GFA of c. 7,795 sq.m (including welfare and reception areas and ancillary office space of c. 669 sq.m over two levels). The proposed building will have a maximum height of c. 15.7 metres. • Provision of 53 no. car parking spaces, 6 no. motorbike parking spaces and 85 no. cycle parking spaces. • Provision of an ESB substation and switchroom, sprinkler tank and pumphouse, bin store and recycle store. • Provision of a service yard and HGV loading/unloading areas, with associated loading bays to the southeast of the building. • Provision of signage and access arrangements including an access road to the north. The proposed development consists of the following at Site G: • The construction of 1 no. light industrial/warehouse (including wholesale use) / logistics building (Unit G2) with a GFA of c. 8,133 sq.m (including welfare and reception areas over two levels and c. 546 sq.m of ancillary office space). The proposed building will have a maximum height of c. 15.3 metres. • Provision of 50 no. car parking spaces, 5 no. motorbike parking spaces and 80 no. cycle parking spaces. • Provision of a sprinkler tank and pumphouse, bin store, and recycle store. • Provision of a service yard and HGV loading/unloading areas, with associated loading bays to the east of the building. • Provision of signage, access arrangements to the proposed development including an access from the existing estate road to the west. The proposed development consists of the following at Site H: • The construction of 2 no. light industrial/warehouse (including wholesale use) / logistics buildings (Units H1 and H2) with a GFA of 8,622 sq.m and 9,070 sq.m. respectively (including welfare and reception areas over two levels for each building and ancillary office space of c. 479 sq.m. and c. 485 sq.m respectively). The proposed buildings will have a maximum height of c. 14.8 metres. • Provision of 100 no. car parking spaces (50 no. for each unit) 10 no. motorbike parking spaces (5 no. for each unit) and 32 no. bicycle parking spaces (16 no. for each unit). • Provision of an ESB substation and switch room, 2 no. sprinkler tanks, 2 no. pumprooms, bin stores, and recycle stores. • Provision of service yards and HGV loading/unloading areas, with associated loading bays to the east of the proposed light industrial/warehouse/logistics buildings. • Provision of signage, access arrangements to the proposed development including accesses from the existing estate road to the west. The proposed development consists of the following at Site P: • The construction of 1 no. light industrial/warehouse (including wholesale use) / logistics building and 1 no. café/retail building accommodating one retail unit and one café unit (Units P3 and P4) with a gross internal area (GIA) of 4,031 sq.m and 505 sq.m. respectively (including welfare and reception areas over two levels and ancillary office space of c. 481 sq.m. within Unit P3). Unit P3 will have a maximum height of c. 14.7 metres and Unit P4 will have a maximum height of c. 4.8 metres. • Provision of 60 no. car parking spaces (40 no. for Unit P3 and 20 no. for Unit P4), 6 no. motorbike parking spaces (4 no. for Unit P3 and 2 no. for Unit P4) and 66 no. bicycle parking spaces. • Provision of an ESB substation and switchroom, a sprinkler tank, pumproom, bin stores and recycle stores. • Provision of a service yard and HGV loading/unloading area, with associated loading bays to the west of the proposed light industrial/warehouse/logistics building. • Provision of signage, access arrangements to the proposed development including accesses from adjacent estate roads to the north and east. The proposal includes provision of a new roundabout at the west of the existing logistics park (northwest of Unit P1), landscaping and planting, PV panel zones at roof level, public art, boundary treatments, signage zones, site lighting, boundary treatments, and all associated site services and development works, including underground foul and storm water drainage network and sustainable urban drainage systems. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase for a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. Additional Information Received 04/07/2025 / 0.4 km away / 26 August 2025Granted
- FW23A/0067The proposed development consists of the following: / 0.4 km away / 28 August 2023Granted
- FW20A/0160Permission for temporary (12 months up to the end of 2021) change of use of 9.22 ha of existing Holiday Blue Car park for the development of a facility to provide for parking of Heavy Good Vehicles (HGV). The development comprises the reconfiguration of the existing car-parking area to provide 250 no. HGV parking spaces, as well as resurfacing of parking areas and internal roads. The development includes 10 no. prefabricated buildings comprising 2 no. 2.7m x 8.0m office units, 2 no. 2.7m x 8.0m canteen units, 4 no. 2.7 m x 5.0m bathroom units, 2 no. 2.7m x 6.0m shower units, proprietary waste-water treatment unit with percolation area, water connection to existing Irish Water service and ancillary works. / 0.4 km away / 18 November 2020Granted
- F18A/0457Permission for the construction of 1 no. warehouse/logistics building / 0.5 km away / 25 September 2018Granted