FW24A/0344: Planning permission for the installation of photovoltaic (PV) solar panels comprising an array of 498.82msq on the roofs of three buildings at The National Orthopaedic Hospital Cappagh - St. Michael's Hall, the Recovery unit and the Operating Theatres and all associated works.
National Orthopaedic Hospital Cappagh, Cappagh Road, Dublin 11, D11 EV
DecisionGrant permission
Decided15 October 2024
Application typePermission
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near National Orthopaedic Hospital Cappagh, Cappagh Road, Dublin 11, D11 EV?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / FW24A_0344_D.pdf / Document 1061426Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW24A_0344_CE.pdf / Document 1061425Source PDF
- Final GrantSource: planningapi.agileapplications.ie / Fw24a0344_Final_Grant.pdf / Document 1068289Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A-0344.docx / Document 1057211Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A-0344_-_DAA.pdf / Document 1058321Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW14A/0089Permission for development at this site. The development will consist / 0.0 km away / 17 September 2014Granted
- FW21A/0055Single storey extension, 156 sq.m at ground floor providing staff changing facilities, public waiting area and new link corridor from the radiology department to the physiotherapy department, and new plant access route at roof level. / 0.0 km away / 11 May 2021Granted
- FW26A/0082EPermission for two number above ground static Firefighting water storage tanks and associated site works all on the campus of the hospital. / 0.0 km away / 23 April 2026Granted
- FW26A/0125EPermission for the demolition of the existing entrance conservatory and the construction of a main entrance lobby incorporating a waiting area and external portico and all associated works at ground floor level. / 0.1 km away / 19 May 2026Granted
- FW18A/0172Single storey extension to the front, the single storey in-fill of two / 0.1 km away / 22 January 2019Granted
- FW21A/0098The development will consist of the retention of existing one-storey modular construction building with 118sqm floor space which currently accommodates open-plan offices with 1 no. enclosed office, 2 nos WC services and an external protected access to the existing main building (retention permission); and permission for the provision of an additional first floor in modular construction with 118sqm floor space to accommodate changing rooms and lockers and 2 nos. WC services and 2 nos. external metal stairs to the first floor. AI received 16/08/21 / 0.1 km away / 02 September 2021Granted
- FW12A/0059The development consists of the change of use of St Michaels Hall as a / 0.1 km away / 16 August 2012Granted
- FW16A/0063Permission for retention and permission for development in the Convent / 0.1 km away / 20 June 2016Granted