FW24A/0366E: Retention of a single storey garage and playroom (c. 50.7m.sq.) along with covered seating area and all other ancillary site development works to the rear of the existing dwelling.
88 Hollystown Park, Hollystown, Dublin 15
DecisionGrant permission for retention
Decided21 October 2024
Application typeRetention
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / FW24A_0366E_D.pdf / Document 1062522Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW24A_0366E_CE.pdf / Document 1062572Source PDF
- Final GrantSource: planningapi.agileapplications.ie / Fw24a0366_Final_Grant.pdf / Document 1070487Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW12B/0095Planning permission for the construction of a new two storey dormer st / 0.0 km away / 05 February 2013Granted
- FW13B/0037Permission for the construction of a new single storey extension / 0.0 km away / 29 July 2013Granted
- FW18A/0023A single storey extension to rear to provide additional accessible gro / 0.3 km away / 03 April 2018Granted
- FW23A/0107Planning Permission for a) single storey extension to front porch b) single storey extension to the side and rear c) modifications to fenestration d) external wall insulation to all external walls with external render finish e) 2no. rooflights to flat roof of new extension f) and all associated site works / 0.3 km away / 01 June 2023Granted
- FW14A/0005Permission is sought for the retention of existing domestic garage / 0.3 km away / 02 May 2014Granted
- LRD0024/S31. The construction of 580 no. residential units consisting of 468 no. houses and 112 no. apartment and duplex units, ranging from 1 to 3 no. storeys set out as follows: * 468 no. houses consisting of 232 no. 2-bed units, 186 no. 3-bed units and 50 no. 4-bed units * 112 no. apartments and duplexes consisting of 104 no. 1-bed units and 8 no. 3-bed units 2. A total of 892. car parking spaces will be provided for this scheme comprising 824 no. resident parking spaces and 68. visitor parking spaces and 2,234 no. cycle parking spaces will be provided for this scheme comprising 2,174 no. resident cycle parking spaces and 60 no. visitor cycle parking spaces 3. A total c.2.25ha Class 2 Open Space comprising 15% of the total developed area including pocket parks (including both formal and informal play area), fitness areas, sitting areas, kick-about and ecological regeneration areas. In addition, c. 1.86ha of linear park to the north located under existing ESB powerlines provides a linear open space connection to Sites 2&3 (as permitted under ABP Reg. Ref. 312271), Site 1 (as permitted under FCC Reg. Ref. FW21A/0042 and under construction) and to permitted Dublin GAA facility (FCC Reg. Ref. FW22A/00198). A further 2.41ha of open space is provided within the scheme comprising open space areas, drainage and hedgerow corridors that can not be considered Class 2 Open Space but provide ample open space areas 4. A total c. 2.55 ha of Open space is provided in c. 3.5HA park permitted under Hollystown Site 1 (FCC Reg. Ref. FW21a/0042) 5. A new pedestrian and cyclist facilities, future potential connections to lands to the west and proposed connections to Tyrrelstown Park as agreed with Fingal County Council. Principal vehicular access to the application site provided by the new road extension to 'The Avenue', and internal road network of Sites 2&3 to the east (as permitted under ABP Reg. Ref. 312271. The Application also provides vehicular access to the future potential school site to the south if required as indicated in Fingal Development Plan 2023-2029. 6. The proposed scheme is designed to integrate with recently constructed development at Bellingsmore (FCC Reg. Ref. FW13A/0088/E1), under construction development on Site 1 (FCC Reg. Ref. FW21a/0042) and permitted Strategic Housing Development on Sites 2&3 (permitted under ABP Reg. Ref. 312271) and completes the last phase of the Hollystown-Kilmartin lands in accordance with the Kilmartin Local Area Plan 2023 (now expired). An Environmental Impact Assessment Report has been prepared in respect of the proposed development. / 0.3 km away / 24 October 2023Granted
- FW11B/0081Planning permission for the construction of a new two storey extension / 0.3 km away / 01 March 2012Granted
- FW17B/0039Permission is sought for the construction of a single storey side and / 0.3 km away / 04 July 2017Granted