LRD0024/S3: 1. The construction of 580 no. residential units consisting of 468 no. houses and 112 no. apartment and duplex units, ranging from 1 to 3 no. storeys set out as follows: * 468 no. houses consisting of 232 no. 2-bed units, 186 no. 3-bed units and 50 no. 4-bed units * 112 no. apartments and duplexes consisting of 104 no. 1-bed units and 8 no. 3-bed units 2. A total of 892. car parking spaces will be provided for this scheme comprising 824 no. resident parking spaces and 68. visitor parking spaces and 2,234 no. cycle parking spaces will be provided for this scheme comprising 2,174 no. resident cycle parking spaces and 60 no. visitor cycle parking spaces 3. A total c.2.25ha Class 2 Open Space comprising 15% of the total developed area including pocket parks (including both formal and informal play area), fitness areas, sitting areas, kick-about and ecological regeneration areas. In addition, c. 1.86ha of linear park to the north located under existing ESB powerlines provides a linear open space connection to Sites 2&3 (as permitted under ABP Reg. Ref. 312271), Site 1 (as permitted under FCC Reg. Ref. FW21A/0042 and under construction) and to permitted Dublin GAA facility (FCC Reg. Ref. FW22A/00198). A further 2.41ha of open space is provided within the scheme comprising open space areas, drainage and hedgerow corridors that can not be considered Class 2 Open Space but provide ample open space areas 4. A total c. 2.55 ha of Open space is provided in c. 3.5HA park permitted under Hollystown Site 1 (FCC Reg. Ref. FW21a/0042) 5. A new pedestrian and cyclist facilities, future potential connections to lands to the west and proposed connections to Tyrrelstown Park as agreed with Fingal County Council. Principal vehicular access to the application site provided by the new road extension to 'The Avenue', and internal road network of Sites 2&3 to the east (as permitted under ABP Reg. Ref. 312271. The Application also provides vehicular access to the future potential school site to the south if required as indicated in Fingal Development Plan 2023-2029. 6. The proposed scheme is designed to integrate with recently constructed development at Bellingsmore (FCC Reg. Ref. FW13A/0088/E1), under construction development on Site 1 (FCC Reg. Ref. FW21a/0042) and permitted Strategic Housing Development on Sites 2&3 (permitted under ABP Reg. Ref. 312271) and completes the last phase of the Hollystown-Kilmartin lands in accordance with the Kilmartin Local Area Plan 2023 (now expired). An Environmental Impact Assessment Report has been prepared in respect of the proposed development.
Lands at Hollystown-Kilmartin, Dublin15
DecisionGrant permission
Decided24 October 2023
Application typeLRD Application
Source documents20
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Chief Executives OrderSource: planningapi.agileapplications.ie / LRD0024_S3_CE.pdf / Document 892635Source PDF
- Final GrantSource: planningapi.agileapplications.ie / LRD0024_S3_Final_Grant.pdf / Document 897282Source PDF
- ReportsSource: planningapi.agileapplications.ie / 01B0E9744BC711EE8623005056926A5C.pdf / Document 825721Source PDF
- ReportsSource: planningapi.agileapplications.ie / 083D4ACE4BC711EE8623005056926A5C.pdf / Document 826481Source PDF
- ReportsSource: planningapi.agileapplications.ie / 4C93731A53A111EE868800505692F3B2.pdf / Document 867089Source PDF
- ReportsSource: planningapi.agileapplications.ie / 4C93732153A111EE868800505692F3B2.docx / Document 867096Source PDF
- ReportsSource: planningapi.agileapplications.ie / A58D7D174BC611EE8623005056926A5C.pdf / Document 877645Source PDF
- ReportsSource: planningapi.agileapplications.ie / C263FD6150A411EEB74F4EEBBDB391AD.pdf / Document 881045Source PDF
- ReportsSource: planningapi.agileapplications.ie / C2C16AF34CA711EEB76964C901B43DAE.pdf / Document 881075Source PDF
- ReportsSource: planningapi.agileapplications.ie / E3B49C3F4BC611EE8623005056926A5C.pdf / Document 884747Source PDF
- ReportsSource: planningapi.agileapplications.ie / LRD0024_-_S3_NTA.pdf / Document 890069Source PDF
- ReportsSource: planningapi.agileapplications.ie / LRD0024_-_S3_Dept_housing,Local_Gov._&_Heritage.pdf / Document 890071Source PDF
- ReportsSource: planningapi.agileapplications.ie / Hollystown_EIAR_Review_draft_for_issue_051023.pdf / Document 890073Source PDF
- ReportsSource: planningapi.agileapplications.ie / LRD0024_S3_MCC.pdf / Document 890079Source PDF
- ReportsSource: planningapi.agileapplications.ie / LRD0024S3_IW.pdf / Document 890094Source PDF
- ReportsSource: planningapi.agileapplications.ie / LRDS0024_-_S3_W.pdf / Document 890157Source PDF
- ReportsSource: planningapi.agileapplications.ie / LRD0024_-_S3_Archaeology.pdf / Document 890852Source PDF
- ReportsSource: planningapi.agileapplications.ie / LRD0024_S3_P.pdf / Document 891337Source PDF
- ReportsSource: planningapi.agileapplications.ie / LRD0024_-_S3_Ecologist.pdf / Document 892437Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW13B/0037Permission for the construction of a new single storey extension / 0.3 km away / 29 July 2013Granted
- FW24A/0366ERetention of a single storey garage and playroom (c. 50.7m.sq.) along with covered seating area and all other ancillary site development works to the rear of the existing dwelling. / 0.3 km away / 21 October 2024Granted
- FW12B/0095Planning permission for the construction of a new two storey dormer st / 0.3 km away / 05 February 2013Granted
- SHDW/003/21To view details of this application please visit www.hollystown2shd.ie Submissions/observations to An Bord Pleanala, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie ABP 312271 A 10 year planning permission for a strategic housing development at a site of c. 25.3 ha at the townlands of Hollystown, Kilmartin, Hollywoodrath, Cruiserath, Yellow Walls, Powerstown, and Tyrrelstown, Dublin 15, which includes lands in the former Hollystown Golf Course and lands identified under the Kilmartin Local Area Plan 2013 (as extended). The lands are bound by the R121 and Hollywoodrath residential development to the east, the under construction Bellingsmore residential development to the south and north, the former Hollystown Golf Course to the north, Tyrrelstown Educate Together National School, St.Luke's National School and Tyrrelstown Community Centre to the west and south and the existing Tyrrelstown Local Centre to the south. The proposed development will consist of the development of 548 no. residential units, consisting of 147 apartments/duplexes and 401 houses, ranging in height from 2 to 5 storeys and including retail/café unit, 2 no. crèches, 1 no. Montessori, 1 no. community hub, car and bicycle parking, open space and public realm, over a site area of c. 25.3 ha, as follows: 1. On lands to the north of the application site (referred to as Sites 2 & 3) the proposed development includes for 428 no. houses and apartments comprising 27 No. 1-bed apartments, 97 No. 2-bed houses, 267 No. 3-bed houses and 37 No. 4-bed houses set out in 401 no. houses (373 no. 2-storey and 28 no. 3-storey) and 9 no. 3-storey apartment buildings (27 no.). A total of 792 no. car parking spaces will be provided for this part of the scheme, of these, 761 no. spaces will be provided for residents with 30 no. spaces provided as visitor parking and 1 no. space for disabled parking. In terms of bicycle parking, a total of 225 no. cycle parking spaces are provided, comprising 180 no. spaces for terraced units (located in 9 no. bike stores with 20 no. bikes in each) plus 45 no. spaces for the apartments. 2. On lands to the south of the application site and north of the Tyrrelstown Local Centre (referred to as Local Centre) the proposed development includes 120 no. apartment/duplex units in 4 no. blocks ranging in height from 3 to 5 storeys (32 no. 1 bedroom, 68 no. 2 bedroom and 20 no. 3 bedroom) all of which have balconies or terraces set out as follows: • Block A, is a 4 storey building, providing 12 no. units with proposed balconies, with a café/retail unit of 154sq.m and community hub of 144.5 sq.m proposed at ground floor. • Block B, is a 3-5 storey building, providing 34 no. units with proposed balconies and ground floor terraces. • Block C, is a 3-5 storey building, providing 44 no. units with proposed balconies and ground floor terraces. • Block D, is a 4 storey building, providing 30 no. units with proposed balconies and ground floor terraces, with a crèche of 500 sq.m with an external play space of 200 sq.m and a Montessori of 280.3 sq.m with an external play space of 185 sq.m proposed at ground floor. • External communal amenity space is provided at ground podiumterrace levels throughout the scheme. • A standalone 2-storey crèche unit is also provided of 529.6 sq.m with an external play space of 243 sq.m, to the south of the site. • Car Parking is provided in a mix of undercroft in Blocks B & C and at surface level with 108 spaces for residential use and 5 no. creche/Montessori staff spaces, 10 no. creche/Montessori set down spaces, 6 no. visitor spaces and 9 no. public spaces on the Link Street. A total of 300 no. bicycle parking spaces are proposed as part of the development comprising 230 no. long stay spaces for residents and 70 no. short stay spaces for both visitors and the non-residential activity. 3. Vehicular access to Sites 2 & 3 to the north of the application site is through the construction of a new vehicular entrance off Hollywoodrath Road (R121), a new footpath and cycle path along the northern and western side of the R121 along the site frontage extending south to the existing Toucan crossing facility over the R121, and provision of 2 no. new Toucan crossings on the R121 (c.0.53 ha) as well as via an extension to Hollystown Avenue link road south of the permitted Bellingsmore development. Vehicular access to the Local Centre to the south of the application site is via the existing access point along Hollystown Avenue and the north-south link route from the existing Tyrrelstown Local Centre which is partially completed and partially under construction. Pedestrian and cycle access is also provided along the R121, through existing roads within the application site and through the creation of a new pedestrian/cycle route to the north at the existing entrance to the clubhouse of the former Hollystown Golf Course. 4. The development of proposed Class 1 public open space of 2.77ha and Class 2 public open space of 1.69ha including pedestrian/cycle routes, seating areas, kick about area, playgrounds, dog park, associated landscaping works including planting, changes in level and boundary treatments. In addition 3.21 ha of linear park under the existing power lines and 2.11ha of ancillary linear open space which includes for SUDS and hedgerow features is provided in the scheme. The proposed Class 1 open space is provided as a north south pedestrian and cycle connection to the north an connecting the site to the Ratoath Road and the future Dublin GAA facilitites at this location. 5. The construction of a new foul outfall sewer, approx. 3km in length to connect to the existing 600mm diameter foul sewer to the south of Powerstown Road which will include decommissioning of the existing Pump House south of Hollystown Park. 6. The development will also provide for all associated ancillary site development infrastructure including landscaped areas and sustainable urban drainage systems under the existing ESB powerlines, and all associated ancillary site development infrastructure including: demolition of an existing shed, ESB sub-stations, public lighting, and foul and surface water drainage; internal roads & footpaths; landscaping; and all associated engineering and site works necessary to facilitate the development. The proposed scheme is designed to integrate with the previously permitted development at Bellinsgmore (Ref FW13A/0088/E1) which is currently under construction and recently permitted residential development on lands to the north east known as Site 1 (FCC Reg. Ref.: FW21A/0042). The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal County Development Plan 2017-2023 and the Kilmartin Local Area Plan 2013 (as extended). The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes the Fingal County Development Plan 2017-2023 and the Kilmartin Local Area Plan 2013 (as extended), other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application, together with an Environmental Impact Assessment Report, may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Fingal County Council. The application may also be inspected online at the following website set up by the applicant: www.hollystown2shd.ie / 0.5 km away / 23 March 2023Granted
- FW21B/0060New single storey home office/utility area/storage area to rear garden with associated site works. / 0.6 km away / 17 June 2021Granted
- FW23A/0203The development will consist of: Attic conversion for storage with dormer window to the rear. Single - story extension to the front and rear, garage conversion for extended living. First-floor extension to the rear. Two New side bathroom windows. / 0.6 km away / 28 August 2023Granted
- FW15B/0047Permission for a single storey pitched roof extension to the rear/sout / 0.6 km away / 21 August 2015Granted
- FW13A/0013The construction of a new post primary school with 27 general classroo / 0.6 km away / 09 April 2013Granted