FW26A/0050E/R3: Planning Permission for the installation of Solar PV Panels to be mounted on the rooftop of an existing warehouse building and all associated ancillary infrastructure. PV Panels will not extend above parapet line. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to Section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with Section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 and 2025 shall apply.
Unit 8, Cedar Drive, Coldwinters & Newtown, Dublin Airport Logistics P
DecisionGrant permission
Decided31 March 2026
Application typePermission
Source documents7
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit 8, Cedar Drive, Coldwinters & Newtown, Dublin Airport Logistics P?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / FW26A.0050E.R3_D.pdf / Document 1171238Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW26A.0050E.R3_CE.pdf / Document 1171237Source PDF
- Final GrantSource: planningapi.agileapplications.ie / FW26A-0050E-R3.pdf / Document 1177862Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW26A-0050E-R3.pdf / Document 1164165Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW26A-0050E-R3-DAA.pdf / Document 1165648Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW26A0050ER3.docx / Document 1167947Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW19A/0185The construction of an open mezzanine floor, 596 m2 in area for storage use, with access from the existing ground floor level of the warehouse, and associated works. / 0.0 km away / 14 January 2020Granted
- F07A/1605/E1The development will consist of the construction of three single store / 0.1 km away / 04 March 2013Granted
- FW25A/0449EPermission is sought to construct a two-story static simulator building with ancillary briefing rooms and store to the rear of the existing building. Additional Information Received 17/12/2025 / 0.1 km away / 20 January 2026Granted
- F17A/0728The construction of a single storey unit for industrial and/or warehou / 0.1 km away / 26 January 2018Granted
- F17A/0436Revisions to existing Hawk House (Unit 4) granted under F07A/0389. Th / 0.1 km away / 14 September 2017Granted
- FW25A/0306EThe development consists of the material change of use from warehouse space to (a) a single storey climate controlled room (2,493m2), clean room (60m2) and office (42m2) to the warehouse area, cold store rooms to the mezzanine undercroft (187m2) comprising total gross floor area of 2,782m2, (b) two large tanks, one containing water servicing the sprinkler system (8.462m high/9.3m diameter) and one containing liquid nitrogen (8.15m high/3.57m diameter) and associated sprinkler pump room (35m2) to the rear service yard area and (c) all associated site works. AI Received 24th September 2025 Significant Additional information Received 14/10/2025 / 0.1 km away / 04 November 2025Granted
- F17A/0705The construction of a standard two room electrical substation to the r / 0.1 km away / 16 January 2018Granted
- FW24A/0018For planning permission for the following development at Unit 5/6 Cedar Drive, St Margarets, Coldwinters Dublin Airport Logistics Park, Co. Dublin, K67 E0C5. a) Construction of an open mezzanine floor at first floor level (587m2), b) Change of use from warehouse to office with the construction of 3no. internal office structrues with a total floor area of 121m2 to be located within the existing warehouse, c) New external single door to the north and south elevations, d) Illuminated high level external signage to the north and south elevations, and all associated siteworks. / 0.1 km away / 05 March 2024Granted