GrantedDecided 24 January 2020Galway City Council

19107: Permission for development which comprises of a new raw water intake works located on the east bank of the River Corrib, 100m downstream of Quincentenary Bridge; associated pipework to transfer raw water from the new intake works to the existing intakes works, which in turn supplies Terryland Water Treatment Plant (WTP); and a new treated water rising main extending between Terryland WTP and existing rising main on the east bank of the River Corrib. The works comprises: New Intake Works. a) Underground inlet works chamber and associated equipment; b) Control building; c) Compound security fencing and gates, safety fencing, drainage, lighting, hard - standing areas and landscaping, ducting and water supply connection; d) Access road from Dyke Road with new entrance and gates; e) Floating boom system offset 5m inti the river from proposed headwall of the intake works. Slipway. f) A new slipway, including a new public access road from Dyke Road. The slipway will be located on the east bank of the River Corrib, circa. 140m downstream of the Quincentenary Bridge. Transfer Mains. g) 215m of 1200mm diameter underground transfer gravity main passing under Terryland parkland, the Quincentenary Bridge eastern approach road (N6) and Terryland River. This will connect the new intake works to the existing raw water mains, which supply Terryland WTP. Works will include 2 no. chambers along the transfer main ( north and south of the N6 Road) and 1 no. chamber for connection to the existing raw water mains at the existing intake site; h) Modifications to the existing intake works in Terryland (decommissioning and civil works). Rising Main. I) 535m of 600mm diameter ductile iron underground rising main from Terryland WTP of the eastern bank to the River Corrib, including a pipe - bridge over the Terryland River, to connect to the existing 450mm diameter ductile iron rising main upstream of the River Corrib crossing. Surge Vessel. j) 1 no. 35m3 surge vessel tank at Terryland WTP for the proposed rising main. A Natura Impact Statement has been submitted.

Dyke Road, Terryland, Galway
DecisionConditional grant
Decided24 January 2020
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Galway City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Dyke Road, Terryland, Galway?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →