19107: Permission for development which comprises of a new raw water intake works located on the east bank of the River Corrib, 100m downstream of Quincentenary Bridge; associated pipework to transfer raw water from the new intake works to the existing intakes works, which in turn supplies Terryland Water Treatment Plant (WTP); and a new treated water rising main extending between Terryland WTP and existing rising main on the east bank of the River Corrib. The works comprises: New Intake Works. a) Underground inlet works chamber and associated equipment; b) Control building; c) Compound security fencing and gates, safety fencing, drainage, lighting, hard - standing areas and landscaping, ducting and water supply connection; d) Access road from Dyke Road with new entrance and gates; e) Floating boom system offset 5m inti the river from proposed headwall of the intake works. Slipway. f) A new slipway, including a new public access road from Dyke Road. The slipway will be located on the east bank of the River Corrib, circa. 140m downstream of the Quincentenary Bridge. Transfer Mains. g) 215m of 1200mm diameter underground transfer gravity main passing under Terryland parkland, the Quincentenary Bridge eastern approach road (N6) and Terryland River. This will connect the new intake works to the existing raw water mains, which supply Terryland WTP. Works will include 2 no. chambers along the transfer main ( north and south of the N6 Road) and 1 no. chamber for connection to the existing raw water mains at the existing intake site; h) Modifications to the existing intake works in Terryland (decommissioning and civil works). Rising Main. I) 535m of 600mm diameter ductile iron underground rising main from Terryland WTP of the eastern bank to the River Corrib, including a pipe - bridge over the Terryland River, to connect to the existing 450mm diameter ductile iron rising main upstream of the River Corrib crossing. Surge Vessel. j) 1 no. 35m3 surge vessel tank at Terryland WTP for the proposed rising main. A Natura Impact Statement has been submitted.
Dyke Road, Terryland, Galway
DecisionConditional grant
Decided24 January 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Dyke Road, Terryland, Galway?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360187Permission for development which consists of the change of use from student accommodation to short term let for a period not exceeding 90 days per calendar year / 0.1 km away / 21 February 2024Granted
- 2560303Permission for development which consists of: permission is being sought by Noel & Margaret Buggy from Galway City Council for a change of use from student accommodation to short term let for a period not exceeding 90 days per calendar year at the above address. / 0.1 km away / 20 November 2025Granted
- 22342Permission for development which consists of a change of use from student accommodation to short term let for a period not exceeding 90 days per calendar year / 0.1 km away / 23 March 2023Granted
- 2397Permission for development which consists of a change of use from dwelling to short term let for a period not exceeding 90 days per calendar year / 0.1 km away / 12 June 2023Granted
- 2396Permission for development which consists of a change of use from dwelling to short term let for a period not exceeding 90 days per calendar year / 0.1 km away / 12 June 2023Granted
- 2460321Permission for development which consist of a change of use from student accommodation to short term let for a period not exceeding 90 days per calendar year / 0.1 km away / 27 November 2024Granted
- 2398Permission for development which consists of a change of use from dwelling to short term let for a period not exceeding 90 days per calendar year / 0.2 km away / 12 June 2023Granted
- 2460324Permission for development which will consist of ground-mounted photovoltaic solar panels with a maximum actual square metreage of 2,830 m2 distributed over grass areas in combination with associated ancillary works. To accommodate solar PV 3 no. trees will be removed, and the fence of length 50 m will be realigned along the south-eastern boundary. Works will be completed at Terryland WTP in Terryland Waterworks, Dyke Road, Terryland, Galway, H91 V097. A Natura Impact Statement will be submitted to the planning authority along with the application. The proposed development consists of work in the curtilage of protected structure; conservation architect’s comment will be submitted along with the application / 0.3 km away / 28 November 2024Granted