Terryland Water Treatment Plant, Dyke Road, Terryland
Planning application 2460324
DecisionConditional grant
Decided28 November 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway City Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Terryland Water Treatment Plant, Dyke Road, Terryland?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1960Permission to retain and complete alterations to existing entrance gate and on site parking layout / 0.1 km away / 30 April 2019Granted
- 17138Permission for development to carry out alterations and convert existing single family dwelling to a community dwelling, construction of private sewage treatment plant and percolation area including all associated site works / 0.1 km away / 01 September 2017Granted
- 2396Permission for development which consists of a change of use from dwelling to short term let for a period not exceeding 90 days per calendar year / 0.2 km away / 12 June 2023Granted
- 2397Permission for development which consists of a change of use from dwelling to short term let for a period not exceeding 90 days per calendar year / 0.2 km away / 12 June 2023Granted
- 22342Permission for development which consists of a change of use from student accommodation to short term let for a period not exceeding 90 days per calendar year / 0.3 km away / 23 March 2023Granted
- 2560357Permission for development which consists of: construction of a first floor side elevation (roof) extension and all ancillary works / 0.3 km away / 30 January 2026Granted
- 2460321Permission for development which consist of a change of use from student accommodation to short term let for a period not exceeding 90 days per calendar year / 0.3 km away / 27 November 2024Granted
- 19107Permission for development which comprises of a new raw water intake works located on the east bank of the River Corrib, 100m downstream of Quincentenary Bridge; associated pipework to transfer raw water from the new intake works to the existing intakes works, which in turn supplies Terryland Water Treatment Plant (WTP); and a new treated water rising main extending between Terryland WTP and existing rising main on the east bank of the River Corrib. The works comprises: New Intake Works. a) Underground inlet works chamber and associated equipment; b) Control building; c) Compound security fencing and gates, safety fencing, drainage, lighting, hard - standing areas and landscaping, ducting and water supply connection; d) Access road from Dyke Road with new entrance and gates; e) Floating boom system offset 5m inti the river from proposed headwall of the intake works. Slipway. f) A new slipway, including a new public access road from Dyke Road. The slipway will be located on the east bank of the River Corrib, circa. 140m downstream of the Quincentenary Bridge. Transfer Mains. g) 215m of 1200mm diameter underground transfer gravity main passing under Terryland parkland, the Quincentenary Bridge eastern approach road (N6) and Terryland River. This will connect the new intake works to the existing raw water mains, which supply Terryland WTP. Works will include 2 no. chambers along the transfer main ( north and south of the N6 Road) and 1 no. chamber for connection to the existing raw water mains at the existing intake site; h) Modifications to the existing intake works in Terryland (decommissioning and civil works). Rising Main. I) 535m of 600mm diameter ductile iron underground rising main from Terryland WTP of the eastern bank to the River Corrib, including a pipe - bridge over the Terryland River, to connect to the existing 450mm diameter ductile iron rising main upstream of the River Corrib crossing. Surge Vessel. j) 1 no. 35m3 surge vessel tank at Terryland WTP for the proposed rising main. A Natura Impact Statement has been submitted. / 0.3 km away / 24 January 2020Granted