Killeenpatrick,
Planning application 201590
DecisionConditional grant
Decided30 June 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Killeenpatrick,?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20682For the erection and operation of a semi-mobile asphalt/macadam mixing plant on C.0.3 hectares at Kilchreest Quarry. Previous application 15/359. / 0.5 km away / 27 July 2020Granted
- 2560440To further develop the existing quarry and all associated site works. The Proposed Development being applied for under this planning application includes for the continuance of quarrying operations within the permitted extraction area to a finished floor level of 40 metres above ordnance datum (mAOD). The Proposed Development also includes for the continuance of operation of a concrete batching plant permitted under ABP PL 07.117549 (Pl. Ref: 99/1449). The extraction will take place within the existing quarry site boundary and permitted area. The proposed development comprises: • The continued extraction of limestone rock from an area measuring approximately 31 hectares to a finished floor level of 40 mAOD • Aggregate product stockpiles • The continued operation of the on-site concrete batching plant (permitted under planning permission Pl. Ref: 99/1449 and ABP PPL07.117549) • Earthen berm construction along the extraction boundary • Phased restoration of the site • The proposed development will utilise the existing quarry infrastructure including internal roads, site office, weighbridge, wheelwash, refuelling area, welfare facilities and other ancillaries. The development will include the use of conventional drilling and blasting techniques and the use of mobile crushing and screening plant. Permission is sought for a period of 27 years. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared and will accompany the planning application / 0.5 km away / 28 January 2026Granted
- 2561341For the construction of a new modular dwelling house, domestic garage, sewage treatment system and all associated site development works / 0.8 km away / 06 January 2026Granted
- 19435For construction of dwelling house, domestic garage, sewage treatment system and all associated site development works. Gross floor space of proposed works: 303.5 sqm / 0.8 km away / 20 May 2019Granted
- 2560316For a period of 25 years for the continued operation and expansion of an existing quarry at this site (site area 12.66 Hectares) for extraction of limestone rock. The proposed development will increase the extraction area to a total of 10.565 hectares (additional volume to be extracted = 1.33 million m³ approximately) and will include the crushing, screening/processing of rock from the site using mobile plant. The development will include the removal of all existing temporary buildings from the site and replacement with permanent structures including the following: site office 104 m², weigh bridge office 16 m², maintenance shed 483 m². Other works will include the installation of a fuel tank including refueling pad and petrol interceptor, construction of carpark/ lorry parking, installation of signage, street lighting and fencing. The site perimeter will include landscaped soil berms to screen the site. On completion of extraction the site will be restored to a natural habitat. An Environmental Impact Assessment Report (EIAR) and screening for an Appropriate Assessment has been prepared in respect of this planning application & will be submitted to the planning authority with the planning application. Gross floor space of proposed works: 603.00 sqm / 1.0 km away / 04 September 2025Granted
- 171244For a one and a half storey dwellinghouse including a sewage treatment plant, percolation area and all ancillary site works (gross floor space 236sqm) / 1.0 km away / 10 May 2018Granted
- 2560421For the construction of a new dwelling house, domestic garage, sewage treatment system, and all associated site development works. Gross floor space of proposed works: 162.00 sqm(H), 60.00 sqm(G) / 1.1 km away / 06 June 2025Granted
- 23180To construct an extension to the rear of a dwellinghouse including all associated works & services, & construct a new septic tank with percolation / 1.2 km away / 27 September 2023Granted