Ballyshea, Craughwell, Co. Galway
Planning application 2561341
DecisionConditional grant
Decided06 January 2026
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballyshea, Craughwell, Co. Galway?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19435For construction of dwelling house, domestic garage, sewage treatment system and all associated site development works. Gross floor space of proposed works: 303.5 sqm / 0.2 km away / 20 May 2019Granted
- 2560421For the construction of a new dwelling house, domestic garage, sewage treatment system, and all associated site development works. Gross floor space of proposed works: 162.00 sqm(H), 60.00 sqm(G) / 0.3 km away / 06 June 2025Granted
- 171244For a one and a half storey dwellinghouse including a sewage treatment plant, percolation area and all ancillary site works (gross floor space 236sqm) / 0.6 km away / 10 May 2018Granted
- 201590For construction of a new Dwelling House, Domestic Garage, Sewage Treatment System and all Associated Site Development Works. Gross floor space of proposed works: 158.4 sqm (house), 58.7 sqm (garage) / 0.8 km away / 30 June 2021Granted
- 18880For construction of dwelling house, domestic garage, sewage treatment system and all associated site development works. Gross floor space of proposed works (house) 160.8 sqm. (garage) 56.8 sqm. / 1.1 km away / 20 August 2018Granted
- 171811For a new detached single dwelling house, garage, septic tank/treatment unit with percolation area and all associated site works. Gross floor space of proposed works Dwelling 175sqm, Garage 43sqm. / 1.1 km away / 22 March 2018Granted
- 20682For the erection and operation of a semi-mobile asphalt/macadam mixing plant on C.0.3 hectares at Kilchreest Quarry. Previous application 15/359. / 1.2 km away / 27 July 2020Granted
- 2560440To further develop the existing quarry and all associated site works. The Proposed Development being applied for under this planning application includes for the continuance of quarrying operations within the permitted extraction area to a finished floor level of 40 metres above ordnance datum (mAOD). The Proposed Development also includes for the continuance of operation of a concrete batching plant permitted under ABP PL 07.117549 (Pl. Ref: 99/1449). The extraction will take place within the existing quarry site boundary and permitted area. The proposed development comprises: • The continued extraction of limestone rock from an area measuring approximately 31 hectares to a finished floor level of 40 mAOD • Aggregate product stockpiles • The continued operation of the on-site concrete batching plant (permitted under planning permission Pl. Ref: 99/1449 and ABP PPL07.117549) • Earthen berm construction along the extraction boundary • Phased restoration of the site • The proposed development will utilise the existing quarry infrastructure including internal roads, site office, weighbridge, wheelwash, refuelling area, welfare facilities and other ancillaries. The development will include the use of conventional drilling and blasting techniques and the use of mobile crushing and screening plant. Permission is sought for a period of 27 years. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared and will accompany the planning application / 1.2 km away / 28 January 2026Granted