OOLAGH WEST, KILLORGLIN, CO. KERRY
Planning application 20410
DecisionConditional grant
Decided12 February 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near OOLAGH WEST, KILLORGLIN, CO. KERRY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2561066To replace existing concrete tile roof finishes with a slate grey insulated uPVC roofing system with decorative standing seams, new metal rainwater goods, uPVC coated fascia linings,associated repairs and external masonry decoration to detached workshop building and detached accommodation building with minor elevational changes to the accommodation building / 0.1 km away / 20 January 2026Granted
- 2460357The construction of a new single storey boat storage shed and all ancillary siteworks, adjacent to the existing parking area on the campus, at Kerry College Killorglin Campus, Oolagh West, Caragh Lake, Killorglin, Co Kerry, V93 EY00. A Natura Impact Statement will be submitted to the Planning Authority with the application. / 0.1 km away / 31 July 2024Granted
- 23100(A) CONSTRUCT EXTENSION ONTO REAR OF THE EXISTING DWELLING HOUSE, (B) CONSTRUCT A NEW STAIRCASE TO THE FRONT AND SIDE OF THE EXISTING DWELLING HOUSE AND MODIFY AND ALTER THE EXISTING LAYOUT INTERNALLY, (C) CONSTRUCT A NEW DORMER WINDOW WITH VELUX ON THE EXISTING ROOF, (D) DECOMMISSION THE EXISTING SEPTIC TANK SYSTEM AND THE INSTALLATION OF NEW PROPOSED WASTEWATER TREATMENT UNIT AND ALL ASSOCIATED SITE WORKS / 1.5 km away / 09 August 2023Granted
- 19555(A) CONSTRUCT A SINGLE STOREY TRADITIONAL COTTAGE STYLE DWELLING ON THE SITE OF AND REPLACING EXISTING SINGLE STOREY COTTAGE DWELLING HOUSE, (B) CONSTRUCT A SINGLE STOREY OUTHOUSE/STORE ON THE SITE OF AND REPLACING EXISTING SINGLE STOREY OUTHOUSE AND (C) INSTALL A MECHANICAL AERATION UNIT WITH SAND POLISHING FILTER AND DECOMMISSION EXISTING SEPTIC TANK SYSTEM, TOGETHER WITH ALL ASSOCIATED SITE WORKS / 1.6 km away / 10 September 2019Granted
- 17701(1)RETAIN EXISTING DWELLINGHOUSE,SEPTIC TANK & PERCOLATION AREA ON REVISED SITE BOUNDARIES & DEMOLISH EXISTING SHED, EXTEND EXISTING DWELLING HOUSE AND CONSTRUCT A NEW GARDEN SHED / 1.8 km away / 05 February 2018Granted
- 2360054(1) Retention Permission for a building as constructed (and previously granted as a shed in planning reference PL 19-703) to be used as part of the main dwelling house. (2) Planning permission to extend the existing dwelling house, and to modify the effluent treatment system all within revised site boundaries, / 2.0 km away / 15 September 2023Granted
- 2319(A) RETAIN THE DWELLING HOUSE AS CONSTRUCTED FOR SHORT TERM LETTING, (B) RETAIN THE CHANGE OF USE OF THE STUDIO APARTMENT FROM A DOMESTIC SHED TO A SHORT TERM RENTAL, (C) RETAIN LANDSCAPING AS CONSTRUCTED, (D) RETAIN MINOR RESURFACING WORKS TO THE EXISTING ACCESS ROAD ALL WITHIN REVISED SITE BOUNDARIES / 2.0 km away / 01 June 2023Granted
- 19703(A) DEMOLISH REAR WALL AND LEAN TO OUTHOUSE TO EXISTING DWELLING, (B) REFURBISH AND CONSTRUCT EXTENSION TO EXISTING DWELLING HOUSE, (C) REFURBISH EXISTING DERELICT SHED ON SITE, (D) INSTALL MECHANICAL TREATMENT UNIT, INTERMITTENT FILTER AND POLISHING FILTER AND (E) ALL ASSOCIATED WORKS / 2.0 km away / 18 October 2019Granted