Gortnagan Beg, Glencar, Co. Kerry
Planning application 2360054
DecisionConditional grant
Decided15 September 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Gortnagan Beg, Glencar, Co. Kerry?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2319(A) RETAIN THE DWELLING HOUSE AS CONSTRUCTED FOR SHORT TERM LETTING, (B) RETAIN THE CHANGE OF USE OF THE STUDIO APARTMENT FROM A DOMESTIC SHED TO A SHORT TERM RENTAL, (C) RETAIN LANDSCAPING AS CONSTRUCTED, (D) RETAIN MINOR RESURFACING WORKS TO THE EXISTING ACCESS ROAD ALL WITHIN REVISED SITE BOUNDARIES / 0.0 km away / 01 June 2023Granted
- 19703(A) DEMOLISH REAR WALL AND LEAN TO OUTHOUSE TO EXISTING DWELLING, (B) REFURBISH AND CONSTRUCT EXTENSION TO EXISTING DWELLING HOUSE, (C) REFURBISH EXISTING DERELICT SHED ON SITE, (D) INSTALL MECHANICAL TREATMENT UNIT, INTERMITTENT FILTER AND POLISHING FILTER AND (E) ALL ASSOCIATED WORKS / 0.0 km away / 18 October 2019Granted
- 19909(A) CONSTRUCT AN EXTENSION TO THE REAR OF THE EXISTING DWELLING HOUSE, (B) PLANNING PERMISSION TO DECOMMISSION EXISTING SEPTIC TANK AND CONSTRUCTION AND INSTALLATION OF A MECHANICAL TREATMENT UNIT, INTERMITTENT FILTER AND POLISHING FILTER, (C) RETENTION PERMISSION TO RETAIN EXISTING EXTENSION TO THE SIDE AND REAR OF THE DWELLING HOUSE, (D) RETENTION PERMISSION TO RETAIN 2 NO. SHEDS ON PROPERTY AND (E) ALL ASSOCIATED SITE SERVICES INCLUDING ENTRANCE AND ACCESS ROAD / 0.5 km away / 22 October 2019Granted
- 21921CONSTRUCT A DWELLING HOUSE SERVED BY AN EFFLUENT TREATMENT TANK AND SANDCELL POLISHING FILTER AND ALL ASSOCAITED SITE WORKS / 1.1 km away / 03 December 2021Granted
- 21635DEVELOPMENT ALONG A 4.6KM LONG SECTION OF AN EXISTING 20KV OVERHEAD ELECTRICITY LINE (REFERRED TO AS "THE GLENCAR LINE") LOCATED BETWEEN STRUCTURES 143 TO 196 INCLUSINVE. THE DEVELOPMENT CONSISTS OF REFURBISHMENT AND UPGRADING WORKS INCLUDING (WHERE NECESSARY) REPLACEMENT OF EXISTING POLES, AND THE PROVISION OF 2 NO. NEW POLES, ALONG THE EXISTING OVERHEAD ELECTRICITY LINE. REPLACEMENT POLES WILL BE CONSTRUCTED AT, OR IMMEDIATELY ADJACENT TO THE EXISTING STRUCTURES THAT THEY WILL REPLACE. REPLACEMENT AND NEW POLES WILL HAVE A MAXIMUM HEIGHT OF 12M ABOVE GROUND; AND BE SIMILAR IN APPEARANCE TO EXISTING POLES. ADDITIONAL UPGRADE WORKS WILL INCLUDE: INSTALLATION OF STAYS; REPLACEMENT OF EXISTING EQUIPMENT E.G. HEADGEAR, INSTALLATION OF ADDITIONAL EQUIPMENT; INSTALLATION OF A NEW 3 PHASE CONDUCTOR ALONG THE FULL LENGTH OF THE LINE; AND ALL ASSOCIATED ANCILLARY WORKS INCLUDING THE PROVISION OF TEMPORARY ACCESSWAYS. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED WITH THIS APPLICATION / 2.0 km away / 05 August 2021Granted
- 20410REMOVAL OF EXISTING PREFABRICATED BOAT STORE BUILDING AND CONSTRUCTION OF A TIMBER-CLAD BOAT STORE BUILDING (ON WATERS EDGE) VARYING BETWEEN SINGLE STOREY AND STOREY AND A HALF IN HEIGHT, AND CONTAINING BOAT STORAGE, DEMONSTRATION ROOM, WC's, OPEN AND ROOFED TERRACED AREAS AT FIRST FLOOR LEVEL, CANTILEVERED BOAT LAUNCHING PLATFORM WITH RAINWATER HARVESTING SYSTEM, ALL WASTE WATER BEING LINKED BACK IN TO THE CENTRES EXISTING WASTE WATER TREATMENT SYSTEM, ALL INCLUDING ASSOCIATED AND ANCILLARY WORKS AND UTILISING EXISTING ACCESS. AN NIS HAS BEEN SUBMITTED WITH THIS APPLICATION / 2.0 km away / 12 February 2021Granted
- 191019CONSTRUCT A REPLACEMENT DWELLING HOUSE. FURTHER PERMISSION IS SOUGHT TO RENOVATE, ALTER AND CONVERT THE EXISTING DWELLING HOUSE TO A DOMESTIC GARAGE AND STORAGE UNIT; PERMISSION TO DECOMMISSION THE EXISTING WASTE WATER TREATMENT SYSTEM CONSISTING OF A SEPTIC TANK; PERMISSION TO CONSTRUCT A NEW WASTE WATER TREATMENT SYSTEM TO SERIVCE THE NEW REPLACEMENT DWELLING HOUSE; AND PERMISSION TO CARRY OUT ALL ANCILLARY SITE DEVELOPMENTS INCLUDING A SITE ENTRANCE WITH GATES AND PILLARS / 2.0 km away / 16 June 2020Granted
- 2561066To replace existing concrete tile roof finishes with a slate grey insulated uPVC roofing system with decorative standing seams, new metal rainwater goods, uPVC coated fascia linings,associated repairs and external masonry decoration to detached workshop building and detached accommodation building with minor elevational changes to the accommodation building / 2.1 km away / 20 January 2026Granted