Marshalstown, Castledermot, Co. Kildare.
Planning application 171154
DecisionRefused
Decided09 May 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Marshalstown, Castledermot, Co. Kildare.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 181029To Erect a dwelling house, garage, well, Oakstown Effluent Treatment System, raised percolation area, splayed entrance and all associated site works / 0.0 km away / 17 October 2018Refused
- 22613Sought for the construction of a proposed part 2 storey part single storey dwelling, detached domestic garage, new vehicular entrance, wastewater treatment system, polishing filter, bored well, stormwater soakaways and all associated site works / 1.1 km away / 14 July 2022Refused
- 2360463The construction of a single storey dwelling, domestic garage, associated landscaping, bored well, secondary treatment system & soil polishing filter, new entrance, and all associated site works / 1.5 km away / 07 February 2024Refused
- 2360535For the construction of Workshop, floor area 1125sqm., with staff facilities, offices, waste water treatment system, parking for 13 no cars, cycle rack for 10 no bicycles, hard standing area and all associated site works / 1.8 km away / 20 February 2024Refused
- 20809To erect a dwelling house, well, Oakstown effluent treatment system, raised percolation area, splayed entrance and all associated site works / 2.1 km away / 10 September 2020Refused
- 19491A two storey dwelling, detached double domestic garage, septic tank and percolation area, and all associated site works / 2.1 km away / 22 November 2019Refused
- 2560920For the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total gross floor area of the proposed development (including internal plant areas and ancillary structures) will be c. 6,007 sq.m. The development will consist of the following: Construction of 2 no. primary digesters (with an overall height of c. 9.1m), a digestate storage tank (with a height of c. 11.3m), a pump house (with a gross floor area (GFA) of c. 362 sq.m), 2 no. post digester tanks (with an overall height of c. 9.1m), and a safety flare (c. 11.3m in height), located in the southeastern section of the site. Construction of 2 no. prepits (c. 4.3m in height), a pasteurisation buffer tank (c. 4.3m in height), and a pasteurisation unit (with a maximum height of c. 4.2m), located to the west of the primary digesters, within the southern section of the site. Construction of digestate treatment and feedstock reception building and odour abatement system (with a GFA of c. 2,797 sq.m and a height of c. 12.1m and c. 16.2m to top of odour abatement stack) located within the southwestern section of the site. Construction of roofed silage clamps (with a GFA of 2,424 sq.m and a height of c. 8.7m) and a fuel storage tank (c. 2m in height), located within the western section of the site. Construction of a combined heat and power (CHP) unit (with a GFA of c. 39 sq.m and a height of c. 2.6m and c. 5.6m to top of flue), a biogas boiler (c. 2.6m in height and c. 5.6m in height to top of flue), a backup boiler (c. 2.6m in height), located within the northern section of the site. Construction of a gas treatment unit (c. 4.2m in height), a grid injection unit (with a GFA of c. 22 sq.m and a height of c. 2.8m), and a CO2 liquefactor (with an overall height of c. 10.7m to top of storage vessels) a propane tank compound accommodating 2 no. propane tanks (c. 1.6m in height), and an ESB substation (with a GFA of c. 24 sq.m and a height of c. 3.4m), located within the northern section of the site. Construction of a two storey ancillary administration building (with a GFA of c. 327 sq.m and a height of c. 11m) within the northern section of the site, adjacent to the site entrance. Alterations to the adjacent local road and site access road, including junction improvement and widening and site entrance and access arrangements. Associated and ancillary works including parking (9 no. standard, 2 no. EV and / 2.7 km away / 02 October 2025Refused
- 20674For an infill section between existing industrial units of circa 61sq.m, attached single storey 'lean to' toilet block & store of circa 20sq.m and detached office 'Portacabin' of circa 42sq.m, foul water to existing septic tank, surface water to soakaways and all associated site works. Planning Permission is sought for an infill industrial unit between existing industrial units of circa 225sq.m, surface water to soakaways and all associated site works / 3.0 km away / 18 June 2021Refused