Carton House Hotel & Golf Resort, Carton Demesne, Maynooth
Planning application 2068
DecisionConditional grant
Decided16 March 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Carton House Hotel & Golf Resort, Carton Demesne, Maynooth?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19895(a) Internal restoration and redecoration to floors, walls, ceiling and joinery (including repair and renewal works) as required, within existing ground floor rooms of Carton House; (b) Removal of single storey modern non-original partitions and rendered walls relating to the internal lobby (as per Planning Reg. Ref. 91/441; An Bord Pleanála Ref. PL 9/5/88418) and its replacement with free standing columns and glazed walling system to create a new (single storey) lobby and bar area as part of existing Hotel [with associated new entrance through the Kitchen Courtyard into the reconfigured lobby (existing entrance to be retained)], to include extension of the lobby area (c. 90sqm) into part of former kitchen yard area; Removal of existing bonded gravel surface/gravel strip in courtyard and replacement with new surface; Removal of modern bar and associated services from former “Stewards Hall” and its relocation to the reconfigured lobby/bar area; Installation of a screen wall in existing opening in north (internal) elevation of east pavilion (separating current barista bar and lobby area); (c) Provision (reinstatement ) of door within existing previously infilled opening to the external courtyard; Remodelling (including reconfiguration of fittings and fixtures) of modern commercial kitchen to extend into present barista bar area (former scullery); Replace existing sash window (in room No. 5) relating to the loggia on southern elevation of Carton House with hardwood double doors; Reconfiguration of previously modified (rooms Nos. 23 and 24) to include new partition walls, creation of openings within non-original partition wall; Mechanical and electrical upgrade works in existing plant space (within roof space) and provision of 1 No. new vent (in line with roof profile) at roof level; Provision of removable (demountable) servery units within the “Ante Room/Lobby” (room No. 4); New and replacement light fittings to ground floor rooms where required; and all associated site development works at a site within Carton House Hotel and Golf Resort (relating to main house and bar/lobby areas on a site of c. 0.41 hectares). Carton House is a protected structure / 0.0 km away / 25 September 2019Granted
- 19390For development at a site (c. 0.085 hectares) at Carton House Hotel and Golf Resort. Carton House is a protected structure. (There are no works proposed to the historic fabric of the protected structure and the application relates to an extension to an existing modern building). The development will consist of: construction of additional floorspace of c. 124sqm (located over existing basement area) of the existing single storey "Linden Tree" building of c. 621sqm (permitted under Planning Reg. Ref. 91/441; An Bord Pleanála Ref. PL 9/5/88418) as part of existing Hotel; the refurbishment and internal reconfiguration of expanded building; associated revisions to elevations including replacement of existing (eastern) façade with glazing; all site development works / 0.0 km away / 30 May 2019Granted
- 20510Refurbishment of the existing 2-storey administration office building to accommodate a flexible event space at ground floor and 4 No. of guest bedrooms and ensuites at first floor level including: (a) Reconfiguration of internal spaces, to include the removal of modern partition walls and the subsequent installation of new partition walls at ground and first floor levels; (b) widening of existing openings in historic fabric; (c) Reinstatement of original door opening in the former Pantry: (d) Works to existing timber floors to include the part replacement of existing suspended timber floor at ground floor level within the existing office space and adjoining corridor and its subsequent replacement with a new floor slab (at a lower level to facilitate level access), works to the existing floor at 1st floor level to include structural strengthening, fire separation and sound insulation; (e) Provision of 4 No. ensuite bathrooms to serve the proposed guest bedrooms including related drainage and service works (including new opes in the historic wall for drainage); (f) Removal and replacement of 20th century timber stair; (g) Provision of mechanical and electrical services to serve reconfigured layouts and proposed ensuite bathrooms; (h) External lighting to be fixed to the exterior façade (north-west and south-west elevation) of the building to the underside of the gutter; (i) Wall repointing, repairs and maintenance works to all windows, doors and the existing roof and reversible protective measures within ornamental dairy to safeguard marble fixtures. Development at this site relating to the administration block (former bakehouse building) on a site of c. 0.1172 hectares at Carton House, a protected structure, / 0.1 km away / 06 July 2020Granted
- 22960The development will traverse the administrative areas of both Kildare County Council and Meath County Council. The development within the Meath County Council administrative area will consist of: a) Provision of approximately 1.9km new pipeline (approximately 9.8km total development length within Kildare and Meath) and associated infrastructure (air valves, scour valves, ventilation columns etc.) A Natura Impact Statement accompanies the subject application. Significant further information/revised plans submitted on this application / 0.5 km away / 15 February 2023Granted
- 2460615For a single storey, detached building with a gross floor area of 396sq.m containing a high-performance golf centre consisting of gym, indoor putting, physio, trackman facility, reception/meeting room, changing facility/WC and circulation areas. Also, ancillary development including hard and soft landscaping, footpaths and associated site works. The proposed development is located in the demesne grounds associated with Carton House which is a Protected Structure (RPS No. B06-09 and B06-09i) / 0.5 km away / 19 September 2024Granted
- 2017For additions and minor alterations consisting of a 2 storey extension to the side of the existing 3 storey dwelling including the minor reconfiguration of the ground floor layout including a kitchen and utility room extension and also an ensuite extension to the first floor level bedroom and associated ancillary site works / 0.5 km away / 27 February 2020Granted
- 22797For single storey car port and home gym to front, side of existing house, permission sought for 2 storey extension to front, side and rear of existing house also single storey sun room to rear of house with existing balcony extending over roof space and all associated site works / 0.5 km away / 13 February 2023Granted
- 2560791For (a) single storey extensions to the north-east side and south-west side of the existing dwelling; (b) a new porch over the front door to the south-west; (c) the replacement of an existing velux rooflight with a dormer window on the north-eastern roof slope; (d) minor alternations to existing elevations; (e) all associated site and landscaping works. The proposed development is in the vicinity of Carton House, associated outhouses, stables and yards which are Protected Structures. No works are proposed which directly affect these structures / 0.6 km away / 05 September 2025Granted