Dalkinstown, Kilgowan, Co. Kildare.
Planning application 211425
DecisionConditional grant
Decided04 March 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Dalkinstown, Kilgowan, Co. Kildare.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360402Construction of one modular classroom together with all its associated site works. Revised by Significant Further Information which consists of retention permission for the foundations to the proposed modular building and for the partially constructed canopy walkway. Planning Permission is sought to complete the walkway and install the modular classroom / 1.3 km away / 23 February 2024Granted
- 2660365Construction of domestic garage and all associated site and development works / 1.4 km away / 29 June 2026Granted
- 18453(i) establishment of an inert soil waste recovery facility to provide for the importation of approximately 1,200,000 tonnes of natural inert waste materials, principally excess soil, stone and / or broken rock to backfill the pit void to former ground level and improve lands currently in agricultural use. The development will be carried out on a phased basis and will be completed within 8 years; (ii) share use, with the existing Kilsaran concrete manufacturing and waste facilities, of existing site and services infrastructure including site office, staff welfare facilities, weighbridge (with dedicated office), wheelwash, hardstand areas, fuel storage tanks and site access; (iii) use of section of existing concrete block curing shed as a waste inspection and quarantine facility; and (iv) temporary stockpiling of topsoil pending re-use as cover material for final restoration of the site. The proposed development requires a waste licence from the Environmental Protection Agency. An Environmental Impact Statement (now referred to as an Environmental Impact Assessment Report (EIRA)) will be submitted / 1.4 km away / 26 October 2018Granted
- 2560041For (i) the construction of a car wash facility, comprising of one automatic wash bay, associated car wash plant room and payment terminal, (ii) the installation of an above ground self-bunded MGO tank to east of the existing HGV fuel forecourt, (iii) the relocation of existing air/water/vacuum service area, (iv) the provision of new road markings and, (v) all other associated site drainage, site development and landscaping works / 1.4 km away / 06 March 2025Granted
- 2461316For a high-power electric vehicle charging hub and associated infrastructure, consisting of the following: (i) installation of 20no. electric vehicle charging bays and 10no. charging points, (ii) Installation of new canopy with associated illuminated signage (iii) new modular ESB Substation, (iv) associated revisions to existing landscaped area including relocated lighting columns, the provision of new lighting columns, new road markings and pedestrian walk way and, (v) all other associated drainage and site development works / 1.5 km away / 10 February 2025Granted
- 2514For the demolition of existing Garage / Shed, the construction of gable end extensions to the South West & North East with associated fenestrations & roof lights to the South West extension. Reconfiguration of the ground and first floor layouts to accommodate living / kitchen / dining, 6 bedrooms, living room & bathroom and study. New dormer roof with associated fenestrations to the rear North West Elevation comprising of overall gross internal floor area of 358.4 sq.m and all associated SuDS measure, site works & landscaping on a site area of 0.1405ha. Revised by Significant Further Information which consists of a new secondary treatment system and soil polishing filter for wastewater treatment purposes. / 1.5 km away / 21 May 2025Granted
- 2560508For a) subdivision of existing site, b) upgrade of existing entrance to form double combined entrance, c) erection of new boundary to part of site, d) proposed storey and a half dwelling, e) treatment system & percolation area along with all associated site development and facilitating works / 1.6 km away / 02 October 2025Granted
- 191112(a) the subdivision of an existing site and erection of a new boundary, (b) construction of a new storey and a half dwelling, (c) new vehicle entrance, (d) treatment system & percolation area along with all associated site works / 1.6 km away / 08 July 2020Granted