Tirlan, Ballyconra Ballyragget, Kilkenny
Planning application 2360201
DecisionConditional grant
Decided11 July 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Tirlan, Ballyconra Ballyragget, Kilkenny?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360330For the Proposed installation of a network connection and grid connection, and minor amendments to solar farms previously approved under planning application references 17/669 and 22/126. The proposed development will consist of the installation of a 33kV network connection between the solar farms approved under planning application references 17/669 and 22/126 comprising: c. 921m of overhead line and 9 No. wooden poles; onward connection of said approved solar farms to Ballyragget 38kV Substation by installation of a 38kV cable comprising c. 786m of underground cable and c. 395m of overhead line on 5 No. wooden poles; amendments to solar farm approved under planning reference 17/669 comprising removal of substation and replacement with solar panels; amendments to the layout of the substation approved under planning reference 22/126, and all associated site works / 0.5 km away / 29 February 2024Granted
- 2360147To construct (i) Slatted tank (ii) Calf shed and all associated site works / 0.5 km away / 19 July 2023Granted
- 18187To construct (i) milking parlour with collecting yard and handling/crush yard (ii) slatted tank (iii) over ground slurry tower (iv) cubicle area (v) meal bin and all associated site works at / 0.5 km away / 29 May 2018Granted
- 2360427For new foul effluent treatment system and percolation area and all associated site works / 0.6 km away / 17 November 2023Granted
- 2360365For development. The development will consist of an extension to an existing Above Ground Installation comprising additional 2.4 m-high palisade security fencing and 2.4 m-high paladin boundary fencing; a pedestrian access gate; an emergency pedestrian gate; internal concrete road pavement and gravelled areas; site lighting; all ancillary works and services including surface water drainage and landscaping / 0.6 km away / 29 September 2023Granted
- 22126For a 10 year planning permission for a 17.346 Hectare Solar Farm, consisting of solar panels fixed to ground mounted steel frames, electricity control room, power inverter units, underground cable ducts, security fence, solar powered CCTV and lamp standard and all associated works. The solar farm will have an operational life of 40 years. Some of the Development is within the curtilage of Ballyconra House, a protected structure. A Natura Impact Statement will be submitted with the application / 0.7 km away / 12 July 2022Granted
- 2360556For development at their Milk Processing Plant comprising: -Construction of a process building to accommodate two number evaporators, and associated equipment, associated plant and equipment rooms, roof mounted air handling equipment, a transformer enclosure and pipe and service bridges. -A link corridor connection to the existing Whey Factory. - Installation of 2 number water recovery silos affixed to concrete plinths. - Associated site works including earthworks, retaining walls, realignment of the existing internal roads to facilitate vehicle movements, drainage works and all associated site works including landscaping. This facility holds an industrial emissions licence issued by the Environmental Protection Agency / 0.7 km away / 02 February 2024Granted
- 2360318For development. The development will consist of the extension of the operational lifespan of a solar farm permitted by Kilkenny County Council under Planning Ref. 17/669 from 25 years as permitted (by reason of Condition No. 4 of permission Ref.17/669) to 40 No. years / 0.7 km away / 06 September 2023Granted