Ballyconra, Ballyragget, Co. kilkenny
Planning application 2360427
DecisionConditional grant
Decided17 November 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballyconra, Ballyragget, Co. kilkenny?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1868For (a) Renovate and Extend existing dwellinghouse including raising ridge height and demolition of existing extension to rear of dwellinghouse; (b) construct domestic shed/store; (c) enlarge existing entrance and (d) Retention Permission to retain mobile home for a 5 year period and all associated site works at / 0.1 km away / 21 May 2018Granted
- 2360318For development. The development will consist of the extension of the operational lifespan of a solar farm permitted by Kilkenny County Council under Planning Ref. 17/669 from 25 years as permitted (by reason of Condition No. 4 of permission Ref.17/669) to 40 No. years / 0.6 km away / 06 September 2023Granted
- 17669For proposed works which will include a solar farm on an area of approximately 39.6 hectares, comprising photovoltaic panels on ground mounted frames, 20 no. single storey inverter/transformer stations, 1 no. onsite 38 KV substation, 2 no. steel storage containers, security fencing, CCTV and all associated ancillary development works. Elgin Energy Services Ltd, are applying for the proposed solar farm to have planning permission that is effective for 10 years (and an operational period of 30 years) / 0.6 km away / 06 March 2018Granted
- 2360201A 10 year planning permission for a solar PV development on a ca. 13Ha Site incorporating: • Solar panels on ground-mounted frames over an area of ca. 6.5 ha, string inverters, 1 no. containerised transformer unit, post and wire fencing, CCTV system with 4 no. pole mounted cameras and landscaping; • Underground electrical cables connecting the solar PV development to existing onsite substation. Proposed extension to existing onsite substation of 51.3sqm; • A temporary construction compound; and, • All associated ancillary site development works. The Site is located within the boundary of an Industrial Emissions Licensed facility regulated by the Environmental Protection Agency, Licence number P0359-03. / 0.6 km away / 11 July 2023Granted
- 2360147To construct (i) Slatted tank (ii) Calf shed and all associated site works / 0.7 km away / 19 July 2023Granted
- 18187To construct (i) milking parlour with collecting yard and handling/crush yard (ii) slatted tank (iii) over ground slurry tower (iv) cubicle area (v) meal bin and all associated site works at / 0.7 km away / 29 May 2018Granted
- 2360330For the Proposed installation of a network connection and grid connection, and minor amendments to solar farms previously approved under planning application references 17/669 and 22/126. The proposed development will consist of the installation of a 33kV network connection between the solar farms approved under planning application references 17/669 and 22/126 comprising: c. 921m of overhead line and 9 No. wooden poles; onward connection of said approved solar farms to Ballyragget 38kV Substation by installation of a 38kV cable comprising c. 786m of underground cable and c. 395m of overhead line on 5 No. wooden poles; amendments to solar farm approved under planning reference 17/669 comprising removal of substation and replacement with solar panels; amendments to the layout of the substation approved under planning reference 22/126, and all associated site works / 0.8 km away / 29 February 2024Granted