Ballycummin, Raheen, Co. Limerick.
Planning application 19343
DecisionConditional grant
Decided05 July 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballycummin, Raheen, Co. Limerick.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1747The demolition of existing dwelling and to construct a two storey dwelling, waste water treatment system, domestic garage, site boundary, site entrance and all associated site works / 0.0 km away / 21 November 2017Granted
- 17136Retaining an existing two-storey dwelling as constructed and within revised site boundaries / 0.1 km away / 12 September 2017Granted
- 17677The construction of a new nursing home which will include:- A part single storey and a part 2 storey 62 bed nursing home to include:- Bedrooms, kitchens, dining areas, sitting rooms, treatment rooms, other associate rooms, internal secure landscaped garden. Signage. A new entrance, access road, bicycle lane and footpaths, car and bicycle parking, storage shed, garden shed. Construction of a new wastewater treatment shed, holding tank, macerator, pump house and connection of storm and wastewater systems to the existing public services and all other associated site works / 0.3 km away / 08 June 2018Granted
- 2093The construction of a new two storey nursing home building, consisting of 82 No. single ensuite bedrooms, kitchen, dining areas, communal areas, treatment rooms, internal secure landscaped garden an all other associated rooms and entrance signage. The development will also consist of the construction of a Garden & Storage shed, a new entrance and entrance walls, internal access road, car and bicycle parking, foul pump station, stormwater attenuation system, connection to all services together with all other associated site works / 0.3 km away / 31 August 2020Granted
- 2460010Development including a two storey nursing home, single storey service building and a biodiversity area on a site at Baunacloka, Mungret, Co. Limerick (which has an existing planning permission for a 82 bed nursing home, reference P17/677 & P20/93). The proposed nursing home comprises provision of 130 no. bedspaces in 128 no. bedrooms with dining areas, communal areas, production kitchen, staff facilities and first floor terrace, internal secure landscaped courtyard, external roof plant and PV Panels. The proposed Service Building comprises staff facilities, ESB substation & switchroom, laundry facilities, goods store and waste management areas. The development will also consist of a new site entrance, on-site car and bicycle parking, foul pumping station, totem sign, boundary fencing and all associated site works A Natura Impact Statement has been prepared in respect of the proposed development and accompanies the planning application.? / 0.3 km away / 29 February 2024Granted
- 2219010-year permission for development of a Biopharmaceutical Manufacturing Campus with an overall floor area of 47,384 sqm. Construction of a 4-storey Biopharmaceutical Manufacturing building approx. 18,534 sqm and 33 metres high with roof-mounted plant/equipment & solar panels. A 2-storey canteen, laboratory and administration building. A 2-storey Warehouse building. A single storey Central Utilities Plant (CUP) building including 5no. Boiler stacks. A 2-storey freezer building. A single storey maintenance building. Single storey pedestrian link with roof-mounted pipe rack. Provision of car parking spaces approx. 199, accessible car parking/motorcycle spaces, EV vehicle charging, dedicated car-pooling spaces/cycle parking. Visitor car park comprising 12no. car parking spaces. Single-storey Security building. Single storey Visitor Centre building. Single storey bicycle/shower facility building. A 38kv Substation compound consisting of single storey substation building. Step-down transformers and single storey Electrical Switchroom building enclosed by security fencing and a new vehicular entrance from Roches Avenue. Firewater and Supply Water pumphouse. Minor off-site underground works include extension of foul sewer to connect to the foul water system. Single storey Waste building. Site infrastructure includes bunded tank farm, pipe-bridges, sprinkler/water tanks, surface water harvest tanks, docks/yard areas, items of plant and equipment, electrical generators, gas-reducing station, underground pumping facilities and internal roads/paths, fencing and site lighting. The development includes use of existing permanent vehicular entrance to the site off existing roundabout on Ballycummin Avenue. Proposed Landscaping, replacement of perimeter security fencing/gates. An extensive ground mounted solar array sized 27,000 sqm located to the rear and east of the site. Signage at ground level and on the building façade. The works include Temporary Contractor Compounds and carparking during construction. All Associated Site Works. Surface water management for the site consists of attenuation swales/ponds, rainwater harvest cisterns to achieve 100% recharging within the site. This application consists of a development for an activity for which a licence under Part IV of the EPA Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. A Natura Impact Statement and an Environmental Impact Assessment Report accompanies this planning application / 0.4 km away / 10 October 2022Granted
- 2660441The construction of a new two storey domestic dwelling and driveway, the installation of a new waste water treatment system and percolation area and ancillary site works / 0.5 km away / 12 June 2026Granted
- 23152Development consisting of modifications and alterations to previously permitted Biopharmaceutical Manufacturing Campus(Planning Register Reference Number 22/190). The proposed development that consists of the following; (1) The relocation of the previously permitted single storey Maintenance Building, sized approximately 1,200 square metres, to the position on site of the footprint of the previously permitted Freezer Building. The previously permitted 2 storey Freezer Building, sized approximately 1,694 square metres, will not be constructed as part of this amended application. (2) The relocation of the previously permitted Tank Farm from its permitted position at the rear of the Warehouse to a revised location within the yard between the Maintenance and the Central Utilities Plant (CUP) Building including pipe bridges all located to the east of the site. The proposed Tank Farm consists of reconfigured and resized tanks. (3) The relocation of 4no. of the previously permitted Boiler Stacks and the omission of 1 no. previously permitted Boiler Stack. The 4no. relocated Boiler Stacks will be approximately 18 metres high and will be located to the north of the previously permitted Central Utilities Plant (CUP) Building. (4) The installation of 1no. additional Cooling Tower to the roof of the previously permitted Central Utilities Plant (CUP) Building, and the modification of the previously permitted acoustic screen to enclose this additional Cooling Tower and the addition of 1no. Cooling Tower at Ground Level within the Tank Farm area. (5) The construction of 1 no. new recessed Loading Dock to the north elevation of the previously permitted warehouse. (6) The relocation of 2no. previously permitted Bulk Gas Tanks from the front of the Production Facility to the position on site of the footprint of the previously permitted Maintenance Building and the installation of 1no. additional Bulk Gas Tank including local pipe bridges. (7) The proposed development also consists of minor modifications to previously permitted internal roads and footpaths, site lighting, landscaping, underground drainage system infrastructure including a reduction of roofed areas and all associated site works. This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required / 0.5 km away / 28 April 2023Granted