GrantedDecided 28 April 2023Limerick County Council

Ballycummin, The IDA Business and Technology Park, Raheen

Planning application 23152
DecisionConditional grant
Decided28 April 2023
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Limerick County Council.
Development consisting of modifications and alterations to previously permitted Biopharmaceutical Manufacturing Campus(Planning Register Reference Number 22/190). The proposed development that consists of the following; (1) The relocation of the previously permitted single storey Maintenance Building, sized approximately 1,200 square metres, to the position on site of the footprint of the previously permitted Freezer Building. The previously permitted 2 storey Freezer Building, sized approximately 1,694 square metres, will not be constructed as part of this amended application. (2) The relocation of the previously permitted Tank Farm from its permitted position at the rear of the Warehouse to a revised location within the yard between the Maintenance and the Central Utilities Plant (CUP) Building including pipe bridges all located to the east of the site. The proposed Tank Farm consists of reconfigured and resized tanks. (3) The relocation of 4no. of the previously permitted Boiler Stacks and the omission of 1 no. previously permitted Boiler Stack. The 4no. relocated Boiler Stacks will be approximately 18 metres high and will be located to the north of the previously permitted Central Utilities Plant (CUP) Building. (4) The installation of 1no. additional Cooling Tower to the roof of the previously permitted Central Utilities Plant (CUP) Building, and the modification of the previously permitted acoustic screen to enclose this additional Cooling Tower and the addition of 1no. Cooling Tower at Ground Level within the Tank Farm area. (5) The construction of 1 no. new recessed Loading Dock to the north elevation of the previously permitted warehouse. (6) The relocation of 2no. previously permitted Bulk Gas Tanks from the front of the Production Facility to the position on site of the footprint of the previously permitted Maintenance Building and the installation of 1no. additional Bulk Gas Tank including local pipe bridges. (7) The proposed development also consists of minor modifications to previously permitted internal roads and footpaths, site lighting, landscaping, underground drainage system infrastructure including a reduction of roofed areas and all associated site works. This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Limerick has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Ballycummin, The IDA Business and Technology Park, Raheen?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →