The IDA Business and Technology Park, Raheen, Co. Limerick
Planning application 2660084
DecisionConditional grant
Decided25 March 2026
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near The IDA Business and Technology Park, Raheen, Co. Limerick?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 211002Construction of a single storey extension and ancillary site works within the existing service yard area of building no. 98. This will be an extension to the existing staff kitchen/canteen facilities for use as catering stores and staff changing facilities / 0.2 km away / 24 August 2021Granted
- 2560800A new vehicle parking area for approved used stock of circ. 0.1395 hectares and accommodating 42. no car parking spaces to the rear (south) of the existing car park and retention permission of 4 no. shed structures with a total floor area of 429 sq. metres accommodating valet, carwash and car turntable facilities and permission for the completion of the vehicle parking area to include site lighting and all ancillary site works / 0.3 km away / 06 October 2025Granted
- 24159The development that will comprise of erection of a single storey pitched roof marquee with a foot print of approximately 313sq.m(25 meteeres x 12.5 meters) and a pitch height of approximately 5.020m on an annual part-time basis. The marquee is intended to be used as a meeting room / 0.3 km away / 11 June 2024Granted
- 2461160A 10-year permission for development at our existing Biopharmaceutical Manufacturing Campus, located at Ballycummin, The IDA Business and Technology Park, Raheen, County Limerick. The proposed development consists of extensions, modifications, alterations and new structures to previously permitted and partly built Biopharmaceutical Manufacturing Campus (Limerick City and County Council Reg. Ref. 22190 and as amended by planning permission Reg. Ref.23152), with a proposed total additional floor area of approximately 67,997 square metres, located on the existing Eli Lilly site, north of Ballycummin Avenue and bounded by Patrickswell Road (R526). The development consists of all site buildings and infrastructure required to support the new campus extension, including the following; (a) A 4-storey Biopharmaceutical Manufacturing Facility sized approximately 52,400 square metres and approximately 34 metres high, with roof-mounted plant and equipment, including solar panels. (b) An extension to the previously permitted single storey Central Utilities Plant (CUP) Building sized approximately 1,050 square metres and approximately 10.6 metres high, with roof-mounted plant and equipment and additional acoustic screening at roof level. (c) An extension to previously permitted single storey pedestrian link with a roof-mounted pipe rack, sized approximately 3,440 square metres and approximately 10.6 metres high. (d) An extension to the north-west side of the previously permitted 2-storey canteen, laboratory and administration building with roof-mounted plant and equipment, acoustic screens and solar panels at roof level, sized approximately 2,200 square metres and approximately 13.5 metres high. (e) An extension to the south-east side of the previously permitted 2-storey canteen, laboratory and administration building with roof-mounted plant and equipment, acoustic screens and solar panels at roof level, sized approximately 2,200 square metres and approximately 13.5 metres high. (f) An additional 2-storey Central Utilities Plant (CUP) Building sized approximately 5,400 square metres and approximately 10.6 metres high, with 4no. Boiler Stacks approximately 17 metres high and roof-mounted plant and equipment and additional acoustic screening at roof level. (g) A single storey Storage Building sized approximately 520 square metres and approximately 6 metres high located to the north of the site. (h) A single storey Firewater pumphouse sized approximately 90 square metres a / 0.3 km away / 16 April 2025Granted
- 25368A) The demolition of i) the existing north west entrance & parking area, ii) the enclosed stairs on the south west side and iii) external plant and enclosures within the south eastern courtyard of the existing facility. B) The construction of i) a one storey extension to the north west of the facility for the reconfiguration of the building entrance. administration and welfare facilities, ii) a one storey utilities extension to the south west. iii) a one storey production circulation extension within the north western courtyard area, iv) a one storey production extension within the south eastern courtyard area, v) an electrical enclosure at roof level and vi) all associated external site works including the partial realignment of the existing internal circulation road and car park / 0.3 km away / 22 April 2026Granted
- 181133The construction of a single storey extension to accommodate utilities and plant, and an ESB substation and all ancillary site works at the rear of the site / 0.3 km away / 24 January 2019Granted
- 2219010-year permission for development of a Biopharmaceutical Manufacturing Campus with an overall floor area of 47,384 sqm. Construction of a 4-storey Biopharmaceutical Manufacturing building approx. 18,534 sqm and 33 metres high with roof-mounted plant/equipment & solar panels. A 2-storey canteen, laboratory and administration building. A 2-storey Warehouse building. A single storey Central Utilities Plant (CUP) building including 5no. Boiler stacks. A 2-storey freezer building. A single storey maintenance building. Single storey pedestrian link with roof-mounted pipe rack. Provision of car parking spaces approx. 199, accessible car parking/motorcycle spaces, EV vehicle charging, dedicated car-pooling spaces/cycle parking. Visitor car park comprising 12no. car parking spaces. Single-storey Security building. Single storey Visitor Centre building. Single storey bicycle/shower facility building. A 38kv Substation compound consisting of single storey substation building. Step-down transformers and single storey Electrical Switchroom building enclosed by security fencing and a new vehicular entrance from Roches Avenue. Firewater and Supply Water pumphouse. Minor off-site underground works include extension of foul sewer to connect to the foul water system. Single storey Waste building. Site infrastructure includes bunded tank farm, pipe-bridges, sprinkler/water tanks, surface water harvest tanks, docks/yard areas, items of plant and equipment, electrical generators, gas-reducing station, underground pumping facilities and internal roads/paths, fencing and site lighting. The development includes use of existing permanent vehicular entrance to the site off existing roundabout on Ballycummin Avenue. Proposed Landscaping, replacement of perimeter security fencing/gates. An extensive ground mounted solar array sized 27,000 sqm located to the rear and east of the site. Signage at ground level and on the building façade. The works include Temporary Contractor Compounds and carparking during construction. All Associated Site Works. Surface water management for the site consists of attenuation swales/ponds, rainwater harvest cisterns to achieve 100% recharging within the site. This application consists of a development for an activity for which a licence under Part IV of the EPA Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. A Natura Impact Statement and an Environmental Impact Assessment Report accompanies this planning application / 0.3 km away / 10 October 2022Granted
- 211637The construction of a of a 550 sq.m. extension to the North West of the existing production facility at our site, relocating the existing canteen facility, kitchen and storage areas and all associated site works. The works will also include a small 72 sq.m extension to an existing corridor within the facility to improve circulation / 0.3 km away / 27 January 2022Granted