Regeneron Ballycummin, Raheen Business Park, Raheen Co. Limerick
Planning application 211002
DecisionConditional grant
Decided24 August 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Regeneron Ballycummin, Raheen Business Park, Raheen Co. Limerick?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 24159The development that will comprise of erection of a single storey pitched roof marquee with a foot print of approximately 313sq.m(25 meteeres x 12.5 meters) and a pitch height of approximately 5.020m on an annual part-time basis. The marquee is intended to be used as a meeting room / 0.1 km away / 11 June 2024Granted
- 18109810 year permission for development comprising a three storey administration and laboratory building sized 10,200 square metres gross, 17.5 metres high with associated plant and equipment, a four storey car parking structure sized 18,500 square metres gross and 13.2 metres high, to accommodate 800 car parking spaces including spaces displaced by the administration/laboratory (circa 364 no.) and additional spaces required for administration/laboratory personnel, both structures located to the south of the existing facility. The conversion of three temporary contractor related facilities to permanent use; a two storey induction/training centre sized 480 square metres and 7.0 metres high, a single storey facility workshop sized 80 square metres and 3.1 metres high, and a two storey office facility sized 400 square metres and 7.0 metres high. A new two-storey administration facility sized 144 square metres and 7.0 high. The construction of a contractor’s compound with 200 car parking spaces and 2 number temporary two storey office facilities sized in total 2,000 square metres all to the north of the existing facility with a dedicated vehicular entrance off Roche’s Avenue. The works include the diversion of existing high tension electrical cables on site together with one number new steel mast structure 15 metres high and all general ancillary site works including all associated temporary construction related works, pipe bridges yard works and items of plant and equipment, including photo-voltaic cells, and cell structures on the multi storey carpark roof. New site works include the re-configuration of an existing carpark for 150 cars, landscaping, lighting and ancillary items. The works also include new site fencing, landscaping and gates. This application consists of an activity for which a license under Part IV of the Environmental Protection Agency Act 1992 (as amended) is required and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency. An Environmental Impact Assessment Report and a Natura Impact Assessment accompanies this application / 0.2 km away / 12 March 2019Granted
- 24401An illuminated "Regeneron" external sign, size 13M (L) x 1.5M (H), located at high level on the southwest side of Building 19 / 0.2 km away / 06 December 2024Granted
- 2660084Additions, modifications and alterations to previously permitted Biopharmaceutical Manufacturing Campus (Planning Register Reference Number 22190 and as amended by planning reference 23152 and 2461160) located at the IDA Business and Technology Park, Raheen, County Limerick, V94 2C04. The proposed development will consist of the following: 1. A two-storey biomass boiler house building with internal access mezzanines, sized 1,881 square meters approximately and 17.6 metres high approximately including a boiler stack approximately 21m high all located to the southeast of the existing permitted facility adjacent to Roches Avenue. It is proposed to construct this facility in two phases over five years. 2. It is proposed to relocate a previously permitted generator compound including 2No. generators to the northeast of this proposed biomass boiler house building and to reconfigure and reduce the generator compound. 3. The proposed development also includes the extension of the existing permitted pipe bridge located to the northwest of the biomass boiler house. 4. The proposed development also consists of minor modifications to previously permitted internal roads and footpaths, site lighting, fencing, landscaping and underground drainage system infrastructure. This application will not result in any storm water discharge to the public system. The existing terminal infiltration basin has sufficient capacity to accommodate the additional surface water run off generated by the proposed Biomass Building and associated works. The application relates to a modification to a development which comprises or is for the purposes of an activity requiring an industrial emissions licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required / 0.2 km away / 25 March 2026Granted
- 17117010 year permission for a single storey manufacturing extension sized 12,707 square meters gross and 14.4 meters high. The manufacturing facility is located to the rear of the existing manufacturing building (to the south east) and consists of the following functions: 1. A multipurpose manufacturing area sized 6,705 square meters, 2. A plant room area sized 1,680 square meters, 3. A waste handling facility sized 626 square meters, 4. Miscellaneous mezzanines housing plant and equipment within the buildings sized 3,696 square meters, 5. The proposed development includes a revised dock area, revisions to underground services, external items of plant and equipment, roof mounted plant and equipment, 2 no. boiler stacks 20 meters high, external equipment and modular storage for industrial materials on site, pipebridges and modifications to existing elevations, 6. New site works include a permanent car park for 150 cars located to the south west of the existing car park, landscaping, lighting and ancillary items. This application consists of an activity for which a license under Part IV of the Environmental Protection Agency Act 1992 (as amended) is required and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency. An Environmental Impact Assessment Report accompanies this application / 0.2 km away / 14 February 2018Granted
- 24384A change of use within the current administration area from an open plan office space to a production area / 0.3 km away / 23 January 2025Granted
- 171185The construction of a work shop/store room and all associated site works at the rear of the existing building / 0.3 km away / 07 February 2018Granted
- 19156The construction of a workshop/storeroom and all associated works at the rear of the existing building / 0.3 km away / 16 April 2019Granted