Ballycummin, Raheen, Co. Limerick
Planning application 2560800
DecisionConditional grant
Decided06 October 2025
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballycummin, Raheen, Co. Limerick?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 25368A) The demolition of i) the existing north west entrance & parking area, ii) the enclosed stairs on the south west side and iii) external plant and enclosures within the south eastern courtyard of the existing facility. B) The construction of i) a one storey extension to the north west of the facility for the reconfiguration of the building entrance. administration and welfare facilities, ii) a one storey utilities extension to the south west. iii) a one storey production circulation extension within the north western courtyard area, iv) a one storey production extension within the south eastern courtyard area, v) an electrical enclosure at roof level and vi) all associated external site works including the partial realignment of the existing internal circulation road and car park / 0.2 km away / 22 April 2026Granted
- 211637The construction of a of a 550 sq.m. extension to the North West of the existing production facility at our site, relocating the existing canteen facility, kitchen and storage areas and all associated site works. The works will also include a small 72 sq.m extension to an existing corridor within the facility to improve circulation / 0.2 km away / 27 January 2022Granted
- 22808Alterations to the Planning Permission previously granted 21/1637 (for the construction of a 550 Sq.m. extension to the North West of the existing production facility, to relocate the existing canteen facility, kitchen and storage areas and all associated external works. The works will also include a small 72 sq.m extension to an existing corridor within the facility to improve circulation.) The alterations involve the relocation of the canteen facility nine metres to the North East, an additional area of 93 sq.m to the canteen and link areas and alterations to the entrance of the building adjoining and all associated works to the North West of the existing production facility / 0.2 km away / 13 September 2022Granted
- 2660084Additions, modifications and alterations to previously permitted Biopharmaceutical Manufacturing Campus (Planning Register Reference Number 22190 and as amended by planning reference 23152 and 2461160) located at the IDA Business and Technology Park, Raheen, County Limerick, V94 2C04. The proposed development will consist of the following: 1. A two-storey biomass boiler house building with internal access mezzanines, sized 1,881 square meters approximately and 17.6 metres high approximately including a boiler stack approximately 21m high all located to the southeast of the existing permitted facility adjacent to Roches Avenue. It is proposed to construct this facility in two phases over five years. 2. It is proposed to relocate a previously permitted generator compound including 2No. generators to the northeast of this proposed biomass boiler house building and to reconfigure and reduce the generator compound. 3. The proposed development also includes the extension of the existing permitted pipe bridge located to the northwest of the biomass boiler house. 4. The proposed development also consists of minor modifications to previously permitted internal roads and footpaths, site lighting, fencing, landscaping and underground drainage system infrastructure. This application will not result in any storm water discharge to the public system. The existing terminal infiltration basin has sufficient capacity to accommodate the additional surface water run off generated by the proposed Biomass Building and associated works. The application relates to a modification to a development which comprises or is for the purposes of an activity requiring an industrial emissions licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required / 0.3 km away / 25 March 2026Granted
- 181133The construction of a single storey extension to accommodate utilities and plant, and an ESB substation and all ancillary site works at the rear of the site / 0.3 km away / 24 January 2019Granted
- 17493The construction of a 441sqm single-storey office extension to the North-East of the existing production facility and all associated external works. The proposed work also seeks to re-clad the existing North-East brick façade / 0.3 km away / 19 September 2017Granted
- 2660441The construction of a new two storey domestic dwelling and driveway, the installation of a new waste water treatment system and percolation area and ancillary site works / 0.3 km away / 12 June 2026Granted
- 1811771. Provision of extension to the existing hotel building with single storey link building to 4 storey primary care facility of 3,353 sq. metres gross floor area, 2. Associated site works including electricity sub station, new access road from Patrickswell Road (R526) and associated landscape works to include reconfiguration of car parking area and dedication of 120 car parking spaces for Primary Care Use, 3. Change of use of existing ground floor conference center (Part) to new use as Primary Care Centre to include a general medical practice clinic, consultation rooms, admin areas, treatment areas & pharmacy / 0.3 km away / 22 August 2019Granted