Bottle Hill, Doon, Co. Limerick
Planning application 227013
DecisionRefused
Decided27 July 2022
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bottle Hill, Doon, Co. Limerick?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 267018Material change of use of ground floor section in the North West corner of former St. Joseph's Secondary School to medical centre use, minor internal alterations, reroofing of lean-to roof section on North elevation with new velux type roof lights and all ancillary site works. Former St. Joseph's Secondary School is on the grounds of the Sisters of Mercy Convent Doon and this is on the NIAH(National Inventory of Architectural Heritage) Schedule, Ref No. 21809006. The Convent building complex and curtilage is a candidate Protected Structure. Original Planning Ref. No. 21/349 / 0.5 km away / 01 April 2026Refused
- 267017Change of use of former farmyard (Buildings A and C) to micro artisan food production unit with ancillary offices, meeting room, storage and toilet facilities. Construction of a glazed link with social dining space to the Eastern courtyard elevation of farmyard building A. Change of use of former Laundry Buildings (Buildings B1 and B2) to an eHub space with computing, social space/conference room, office and toilet facilities. Construction of a single storey flat roofed corner link extension to connect buildings B1 and B2 together. Erection of retractable fabric canopies to the farmyard space varying in height between 3.8 to 4.5 metres. Change of use of farmyard courtyard to be used as a local farmers market space & all associated site works. Doon Social Farm is on the grounds of the Sisters of Mercy Convent Doon and this is on the NIAH(National Inventory of Architectural Heritage) Schedule, Ref No: 21809006. The Convent building complex and curtilage is a candidate Protected Structure. Original Planning Ref. No. 21/216 / 0.6 km away / 01 April 2026Refused
- 20321The construction of a shared vehicular entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works / 1.5 km away / 07 July 2020Refused
- 2530The conversion of a garage into a habitable dwelling and Planning Permission for the alterations of the elevations of the conversion and the construction of a two storey side extension, installation of a wastewater treatment system, site boundary and all associated site works. The proposed structure will accommodate a separate independent residential unit / 4.8 km away / 27 March 2025Refused
- 181178Construction of a two storey dwelling, garage, wastewater treatment system, boundary, access road, site entrance and all associated site works / 4.8 km away / 05 February 2019Refused
- 211565A 10-year permission and 35 year operation for a solar farm on four land parcels as described herein; North Parcel(Gortnakistin townland) approximately 23.78 hectares, Central Parcel(Ballyvalode & Keeloges townlands) approximately 43.49 hectares, South Central Parcel(Gortyvahane and Moanroe townlands) approximately 34.7 hectares, South Parcel(Garryduff, Moanroe, Moanoola and Kilmacogue townland) approximately 39.27 hectares. The Central Parcel, South Central Parcel and South Parcel are collectively referred to as the Main Solar Farm; a route corridor of 0.58 hectares for an underground internal network cable along the R507 and L5040 public roads for approximately 600 metres and within the solar farm lands for approximately 1,260 metres. The total site area for the proposed development is approximately 141.8 hectares. The proposed development on these parcels comprises of 755,000sqm of solar photovoltaic panels on ground mounted steel frames; inverter/transformer stations; underground power and communication cables and ducts; boundary security fencing; new internal access tracks; associated drainage infrastructure; site entrances to the R507 public road(site entrance to main solar farm) and the L5040 public local road(North Parcel); CCTV cameras and all associated site services and works. Works for the internal network cable comprise trenching for an underground medium voltage electrical cable and associated joint bays and infrastructure, for a distance of approximately 560 metres on the R507 Regional Road, approximately 100 metres on the L5040 Local Road and approximately 1,260m within the solar farm lands. As part of a separate Strategic Infrastructure Development(SID) planning application provision of a 110kV electrical substation with electrical control building, associated compound with palisade fence and 2no. overhead line masts, which is to be located within the main solar farm, will be lodged with An Bord Pleanála in due course. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application / 5.7 km away / 14 January 2022Refused
- 22600To re-roof with slates the existing shed at the rear of their existing premises, install dormer & velux roof windows and change of use of this shed to dwelling house, connect to existing services and all associated site works / 6.0 km away / 21 July 2022Refused
- 2360351The construction of a dwelling house and all associated site works on serviced site number 2, previously granted under planning ref P21-725 / 6.2 km away / 11 April 2024Refused