Shanacloon, Cappamore, Co. Limerick.
Planning application 181178
DecisionRefused
Decided05 February 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Shanacloon, Cappamore, Co. Limerick.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20321The construction of a shared vehicular entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works / 3.4 km away / 07 July 2020Refused
- 227013Extension of duration for 16/530 for the construction of 25 no. houses consisting of 5 no. 4 bed detached dwellings, 20 no. 3 bed semi-detached dwellings, a bored well, entrance and roads together with associated site works and services / 4.8 km away / 27 July 2022Refused
- 22600To re-roof with slates the existing shed at the rear of their existing premises, install dormer & velux roof windows and change of use of this shed to dwelling house, connect to existing services and all associated site works / 5.0 km away / 21 July 2022Refused
- 22646The continued operation of the existing Knockastanna Wind Farm; as permitted under Limerick County Council Planning Register References 01/1385 (An Bord Pleanala Reference PL13.130938), 07/758 (An Bord Pleanala Reference PL13.224401), and 08/7007; for a further period of 15 years following the expiry of its current planning permission. The existing windfarm comprises (i) 4 No. wind turbines and associated turbine foundations and crane hardstandings; (ii) 1 No. site entrance and 2 kilometres of site access tracks; (iii) 1 No. electrical control building with a gross floor area of 66 square metres, electrical equipment enclosure and wastewater treatment system; (iv) underground electrical and communications cabling; and (v) all drainage, signage, and all ancillary site infrastructure. The proposed development does not comprise any modifications to the existing windfarm and there will be no increase in the number or dimensions of the permitted wind turbines. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) which includes an assessment of the likely impacts of the proposed development, as a whole and in combination with the relevant off-site or secondary developments which will occur as a direct result of the proposed development. This planning application is also accompanied by a Natura Impact Statement (NIS) / 5.1 km away / 26 January 2023Refused
- 267018Material change of use of ground floor section in the North West corner of former St. Joseph's Secondary School to medical centre use, minor internal alterations, reroofing of lean-to roof section on North elevation with new velux type roof lights and all ancillary site works. Former St. Joseph's Secondary School is on the grounds of the Sisters of Mercy Convent Doon and this is on the NIAH(National Inventory of Architectural Heritage) Schedule, Ref No. 21809006. The Convent building complex and curtilage is a candidate Protected Structure. Original Planning Ref. No. 21/349 / 5.1 km away / 01 April 2026Refused
- 267017Change of use of former farmyard (Buildings A and C) to micro artisan food production unit with ancillary offices, meeting room, storage and toilet facilities. Construction of a glazed link with social dining space to the Eastern courtyard elevation of farmyard building A. Change of use of former Laundry Buildings (Buildings B1 and B2) to an eHub space with computing, social space/conference room, office and toilet facilities. Construction of a single storey flat roofed corner link extension to connect buildings B1 and B2 together. Erection of retractable fabric canopies to the farmyard space varying in height between 3.8 to 4.5 metres. Change of use of farmyard courtyard to be used as a local farmers market space & all associated site works. Doon Social Farm is on the grounds of the Sisters of Mercy Convent Doon and this is on the NIAH(National Inventory of Architectural Heritage) Schedule, Ref No: 21809006. The Convent building complex and curtilage is a candidate Protected Structure. Original Planning Ref. No. 21/216 / 5.2 km away / 01 April 2026Refused
- 2660051Completion of the construction of existing dwellinghouse, currently at blockwork complete stage and associated site works including wastewater treatment system and entrance / 5.5 km away / 19 March 2026Refused
- 2460394A period of 3 years for the extended shop, sheds on western boundary, shed and toilet block on eastern boundary, skip yard, car wash, totem pole all within the revised site boundaries. The unauthorised works that are the subject of Enforcement Notice DC-181-21. Planning Permission for the demolition of the existing service station and for the construction of a new service station which will include: Construction of a new forecourt canopy, A retail shop, A deli, coffee area and kitchen, Stores and freezer rooms, Service room, Manager and accounts offices, Meeting room, Customer and staff toilets, Staff canteen, Electric Vehicle charging points, Air and water service area, Carwash, Vehicle parking signage and all associated works. One Service Station - 2 stories in height - Maximum height - 6.3 meters / 5.5 km away / 21 June 2024Refused