Kilnacarrow Ballynakill Cloonkeel Derryaroge Cloonbearla Mount Davys Cloonbony Aghamore, Lanesborough, Co Longford
Planning application 22275
DecisionConditional grant
Decided17 April 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Longford County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Longford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Kilnacarrow Ballynakill Cloonkeel Derryaroge Cloonbearla Mount Davys Cloonbony Aghamore, Lanesborough, Co Longford?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2275Development at the 13.1 Ha site known as 'Lough Ree Power (LRP) Station' located in Lanesborough (Lanesboro), in the townlands of Aghamore and Lanesborough, Eircode N37E180; in County Longford. The development will consist of the demolition of the existing LRP station (as approved under Longford County Council reg.ref 01/115 ' An Board Pleanala Ref. PL14.125540 and all subsequent permissions);and the development and operation of electricity grid services - namely a battery energy storage system (BESS) and a Synchronous Condenser (Sync Con). The proposed development comprises two distinct phases of activity - the initial demolition and site reinstatement (Phase 1); following by construction and operation of the new BESS and Sync Con (phase 2). Phase 1 comprises the demolition of existing site structures (with a total footprint of c. 11.195sq.m. and a total gross floor area of c. 20,000 sq.m) including the former LRP station (boiler house, turbine house, bag filter house and associated 80 m high stack); the intermediate peat storage building and associated fuel management system; and ancillary buildings including, electrical building, tippler building and associated control room and office, the screening building, lorry uploading building, water treatment plant building, offices building, laboratory building, workshop and maintenance buildings, oil pumphouse, electrics rooms, railway/locomotive service building, cooling water pump house and sewage/foul water treatment facility. All buildings and structures (including storage tanks and vessels) will be demolished to ground level, with below ground voids filled. Existing hard standing surfac3es (e.g. building ground floor concrete slabs, tarmacadam surfaces, concrete footpaths and road kerbs) will remain in site; and the site will be reinstated and secured with boundary gates and fences, etc. Associated with the demolition activity there will be on-site crushing of material using mobile machinery for the purposed of disposal and/or material re-use. Phase 2 comprises the proposed development of the BESS, Sync Con; and all associated development (Full description scanned/attached) / 0.0 km away / 08 December 2022Granted
- 2460315Will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of: 1) Up to 896 no. battery energy storage enclosures, organised in approx. 36 no. bays. Each battery enclosure will incorporate battery packs as well as power electronics, battery management systems, cooling units and fire suppression systems. The battery bays will be c. 5m wide x 3m high and vary in length from 33.7m to 36.3m; 2) 10 no. Medium Voltage (MV) Skids (c. 6m x 10.2m x 2.5m); 3) Control Building (c. 378.9 sq.m); 4) Ancillary plant and equipment comprising of: a. an emergency diesel generator plinth (c. 28.7 sq.m); b. two spare parts containers (c. 29.7 sq.m); c. a fire fighting water tank and pump house (c. 15 sq.m); d. an underground oil separator and repurposing of existing settlement basin to provide storm water attenuation; an underground emergency retention basin; e. transformer compound including a bunded main step-up transformer (c. 130 sq.m) and firewalls, and High Voltage (HV) switchgear, linking with an underground cable; and f. 4 no. auxiliary transformers (c. 4m x 4m x 3m); 5) Operation and Maintenance site office including welfare facilities (c. 25.5 sq.m); 6) All services connections including electrical, water and wastewater and connections to existing surface water drains; 7) 1 no. lightning monopole (c. 18m high); 8) Modifications to the permitted HV customer compound currently under construction (under Planning Application Reg. Ref. No. 22/275) to include the upgrade of the 110kV:33kV transformer with associated equipment including Circuit Breaker (CB), modifications to the transformer bund and control building; and 9) All other ancillary site clearance and development works including provision of biodiversity enhancement area; areas of hardstanding; internal access roads; lighting and CCTV; laydown area; fencing and access gates (c. 4m in height); car parking; and connections to site services networks. Note For Information Purposes: This application relates to elements previously consented by Longford County Council under Planning Application Reg. Ref. No. 22/75. It is expected that the already consented demolition of existing structures on site will occur in advance of the commencement of the construction of this proposed development. The demolition works, therefore, do not form part of this application. Planning Permission is being sought fo / 0.1 km away / 07 July 2025Granted
- 19201The development will consist of the redevelopment of the existing Lanesboro 110kV AIS substation with a new 110 kV Gas Insulated Switchgear (GIS) substation. The 110 kV GIS substation redevelopment will comprise of the following elements: (i) A110 kV GIS substation contained within a building with a gross floor area of approximately 1,470m2 (54m x 15m) and a height of 15m. Associated development within the footprint of the GIS substation development will include: 6 no. lightning rods of approximately 3m in height located on the parapet of the GIS Building: a Distribution System Operator (DSO) compound (approximately 30m2); an internal circulation road of approximately 245m in length and 5m in width, 12 no. car parking spaces; underground stormwater attenuation tank; underground foul wastewater pumping station and all associated site development and landscaping works. The substation will be bounded by a palisade fence 2.6m in height and bounded with a property fence 1.4m in height; (ii) The modification of 8 no. existing 110 kV underground circuits which will be re-routed into the new 110 kV GIS substation: Sliabh Bawn-Lanesboro underground circuit, Cloon-Lanesboro underground circuit, Athlone-Lanesboro underground circuit, Richmond 1-Lanesboro underground circuit, Richmond 2-Lanesboro underground circuit, Lough Ree Power T104-Lanesboro underground circuit, T141-Lanesboro underground circuit and Mullingar-Lanesboro underground circuit. Associated development includes the construction of 3 no. underground joint bays; 1 no. gantry tower (footpring of 30.2m2 and a height of 12.5m); 1 no. Line Cable Interface Mast (footprint of 123m2 and the height of 20.7m) and all associated and ancillary transmission infrastructure. (iii) The construction of a Landowner access road of approximately 91m in lenghth and 6m in width / 0.2 km away / 20 May 2020Granted
- 23600561. Construction of a Gas Insulated Switchgear (GIS) compound measuring approximately 92.8m by 90.5m. The proposed GIS compound will be raised to a ground level of 1.2m higher than the existing ground level at the site, and will comprise: (i) GIS building with an approximate gross floor space 1624.1m2 and height of 15m (in addition, 6 no. lightning protection rods, approximately 3m in height, are located on the parapet of the GIS building); (ii) An internal access track measuring approximately 245m in length and 5m in width, 15 no. car parking spaces; underground stormwater attenuation tank; underground foul wastewater pumping station and all associated site development and landscaping works; and (iii) The substation compound will be bounded by a palisade fence 2.6m in height and further enclosed by a property fence measuring 1.4m in height. 2. The proposed development will also consist of the redevelopment of the existing AIS 110 kV substation, comprising the following: (i) Decommissioning of the 110 kV AIS busbar and 110 kV primary plant within the existing 110 kV AIS substation; (ii)The modification of 8 no. existing 110 kV underground circuits which will be re-routed into the new 110 kV GIS substation; and, (iii) Construction of 3no. underground joint bays; 1 no. new gantry tower (approximate footprint of 30.2m2 and a height of 12.5m); 1 no. new Line Cable Interface Mast (approximate footprint of 123m2 and a height of 20.7m); removal of the existing 110 kV OHL tower and section of cable which extends to the proposed Line Cable Interface Mast and all associated and ancillary transmission infrastructure. 3. Construction of a Distribution System Operator (DSO) compound measuring approximately 30m2; 4. Construction of a landowner access road (hardcore surfacing) of approximately 91m in length and 6m in width; and, 5. All ancillary site development works to facilitate the proposed development including geotechnical and geo-environmental ground investigations, site preparation works, site clearance and levelling, site drainage and associated outfall headwall to facilitate discharge to the River Shannon, temporary construction compounds and landscaping / 0.2 km away / 11 August 2023Granted
- 2360124The proposed development will comprise: • the replacement (“restringing”) of the existing overhead line circuit conductor wires with a new higher capacity conductor including installation of a new fibre communication connection; • the replacement of 52no. existing polesets and 4no. towers - any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace, will be along the same alignment as existing; • the replacement of angle mast AM3A with a poleset; • the retention and refurbishment, steel member replacement, painting and foundation strengthening of the one retained end mast EM1; • the replacement of hardware and fittings at all structure locations; • the replacement of stay arrangements at 27no. locations; • the replacement of crossarms at 27no. locations; • the installation of insulators at 13no. locations; • the replacement of vibration dampers at 12no. locations; • the reinstallation of all anti-climbing guards; • the reinstallation of aircraft warning spheres at span 127-128; • all associated works within the existing Lanesboro 110 kV substation to accommodate the uprated 110 kV OHL including uprating of the Mullingar bay in Lanesboro 110 kV substation, routing of fibre optic cable from end mast into substation and alterations to existing hardware; • all associated temporary site development works to gain access to the existing structures including clearance of vegetation, disassembly and reassembly of gate posts / piers and removal and reinstatement of existing fencing; and • other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems and temporary watercourse crossings / 0.2 km away / 17 October 2023Granted
- 2360108The proposed development within Co. Longford will comprise: • the replacement (“restringing”) of the existing overhead line circuit conductor wires with a new higher capacity conductor including installation of a new fibre communication connection; • the retention and refurbishment, steel member replacement, painting and foundation strengthening of the one retained end mast EM1, including the replacement of hardware and fittings, replacement of vibration dampers, and replacement of insulators at EM1; • The cutting of timber / vegetation; • all associated works within the existing Lanesboro 110kV substation to accommodate the uprated 110kV OHL including uprating of the Sliabh Bawn bay in Lanesboro 110kV substation and alterations to existing hardware; and • other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems and temporary watercourse crossings / 0.2 km away / 25 September 2023Granted
- 18139Development at this site - the existing Cloon to Lanesboro 110 kV Overhead Line is approximately 65 kilometres long. Approximately 37km of the existing circuit is located within the functional area of Galway County Council with approximately 27km located in County Roscommon and approximately 120 metres located in County Longford. The refurbishment works within County Longford will be undertaken at structure EM365, located within the Lanesboro Substation in the townland of Aghamore (Rathcline By). The development will consist of the refurbishment of the Cloon - Lanesboro 110 kV Overhead Line which will primarily include: replacement of a large proportion of existing structures, the breaking out and reconstruction of the concrete foundation and shear blocks at the majority of end/angle mast structures, painting of mast structures, replacement of insulators, crossarms, stays and/or fittings on existing structures; and the fitting of bird flight diverters and stay guards. No additional structures are proposed along the existing circuit. Any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace, and will be of a generally similar height and appearance. Associated site development works to gain access to the existing structures include clearance of vegetation, disassembly and reassembly of stone walls and gate posts and removal and reinstatement of existing fencing. The proposed development includes all other associated and ancillary site development works required for the refurbishment of the existing circuit, including the installation of temporary silt traps, silt fences, bog mats and clear span bridges. No additional structures and no alteration to the nature, extent, alignment, character or voltage of the existing electricity infrastructure is proposed. A Natura Impact Statement (NIS) forms part of this application / 0.3 km away / 21 August 2018Granted
- 19158Planning permission for the proposed construction of an astro turf playing pitch together with perimeter fencing, erection of lighting poles with lighting and all ancillary works / 0.3 km away / 31 July 2019Granted