Our Lady of Lourdes Hospital Windmill Road, Moneymore Drogheda, Co. Louth
Planning application 2460338
DecisionConditional grant
Decided08 August 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Louth County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Louth has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Our Lady of Lourdes Hospital Windmill Road, Moneymore Drogheda, Co. Louth?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2660118Permission for the construction of a single storey extension to existing two storey Oncology Building, together with all associated site works / 0.0 km away / 24 April 2026Granted
- 2560341Permission will consist of the erection of single storey low and medium voltage plantrooms, a steel gantry plant deck structure with screening over these and existing adjacent plantrooms for location of 2no. generators over, mechanical and electrical service routes including cable ladders and flu chimneys fixed to the adjacent existing 5 storey hospital building elevation, a new concrete plinth for location of an oil tank, and all associated site and ancillary works necessary to facilitate the development. / 0.0 km away / 23 July 2025Granted
- 2560030The development will consist of the erection of a roof level photovoltaic array, a new roof level perimeter edge protection railing, and all associated site and ancillary works necessary to facilitate the development. *Significant Further Information Received on 22/04/2025 - additional roof level photovoltaic arrays proposed * / 0.0 km away / 09 May 2025Granted
- 2460385The construction of a single storey extension to create additional bed spaces to area known as “ground floor west wing”, together with all associated site works. / 0.0 km away / 29 August 2024Granted
- 2460372The development will consist of the Construction of a Temporary Modular Ward Building adjoining the Existing Critical Decisions Unit and Accident and Emergency Department and all associated ground works and all ancillary works necessary to facilitate the development. / 0.0 km away / 22 August 2024Granted
- 18362The development will consist of a new single storey 8m2 extension to form new lobby to the pharmacy facility at lower ground floor level. / 0.0 km away / 21 June 2018Granted
- 17577Retention permission for minor modifications to already approved development (planning register reference number 1371) at this site. The modifications consist of extension of glazed by-pass link corridor located on the existing hospital façade (13.7m2 extension to 1st floor and 43.7m2 on 2nd, 3rd and 4th floors). Services alterations to include UPS plant room 110.8m2 at 5th floor. Minor elevational changes to 2no. louvres at 5th floor east elevation and 4no. windows at 4th floor south elevation. Ancillary site works to suit. / 0.0 km away / 15 September 2017Granted
- 20186Permission to retain the continuance of use of existing permitted 2 storey building extension (756sqm) as previously granted for a temporary period of 5 years under Reg. Ref. 14/554. The development consists of the 2 storey unit connected with the main hospital via link at ground and first floor levels and houses the Acute Surgical Assessment Unit with short stay in-patients admission areas / 0.0 km away / 25 June 2020Granted