SHESKIN, BELLACORICK, CO. MAYO
Planning application 19457
DecisionConditional grant
Decided06 November 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near SHESKIN, BELLACORICK, CO. MAYO?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 184476 year permission to erect a guyed wind monitoring mast, with instruments up to 100m in height / 4.9 km away / 10 August 2018Granted
- 23463A 10 year permission for the construction of a synchronous condenser facility comprising of a synchronous condenser and flywheel building, control and storage building, external support infrastructure, underground grid connection cabling, electrical components and associated works. A NIS has been prepared in respect of the planning application / 5.6 km away / 09 October 2023Granted
- 22502SINGLE STOREY PROCESS BUILDING OF 13.3M HEIGHT; 16 NO. FIN FAN COOLERS OF 6.9M HEIGHT; HYDROGEN STORAGE AREA WITH AREA OF 4650M2; GAS INJECTION COMPOUND WITH AREA OF 1000M2; 2 NO. GAS AGI BUILDINGS, EACH OF 3M HEIGHT; ELECTRICAL SUBSTATION WITH AREA OF 2407.6M2; 2 NO SUBSTATION BUILDINGS, EACH OF 4M HEIGHT; RAW WATER AND FIRE WATER STORAGE TANK WITH VOLUME OF 879.6M3; PUMP HOUSE OF 5M HEIGHT; WATER ABSTRACTION CHAMBER WITH VOLUME OF 2.9M3; RESURFACING, REPAIR AND IMPROVEMENT OF EXISTING SITE ENTRANCE; REPLACEMENT BRIDGE; INTERNAL ACCESS ROADS AND ASSOCIATED GRID CONNECTION WORKS WITHIN THE L52925 PUBLIC ROADWAY. THE DEVELOPMENT WILL INCLUDE THE PROVISION OF 12 NO. PARKING SPACES, FOOTPATHS, LANDSCAPING, FENCING AND ALL OTHER ASSOCIATED SITE DEVELOPMENT PLANT AND EQUIPMENT AND OTHER WORKS INCLUDING SURFACE WATER AND FOUL WASTEWATER DRAINAGE INFRASTRUCTURE WITHIN A TOTAL OVERALL APPLICATION BOUNDARY OF 6.51HA / 6.0 km away / 25 May 2023Granted
- 24368Construction of a cattle shed consisting of a underground storage tank together with all associated site works / 6.1 km away / 15 April 2025Granted
- 2360028The development will consist of a 114 Megawatt gas fired peaking power plant (which will be capable of running on a mix of natural gas and hydrogen) comprising the ’electricity generating station’. The electricity generating station will comprise of 2 no. open cycle gas turbine (OCGT) generators each consisting of an air intake filter system, exhaust stack (28 metres high), air vent stack, inter cooler system, turbine control room and transformers. In addition the development will include: • Above Ground Installation (AGI) to facilitate connection to the Gas Network, with compound area of 1,600 m²; • 3 no. Gas AGI buildings; • Admin & welfare block; • Electrical Substation with area of 3,800 m²; • 1 no. Substation building; • Electrical building; • 3 no. Secondary fuel storage tanks with volume of 3,600 m³; • Fire Water Storage Tank & Pumphouse; • Sludge Tank & Pump House; • Resurfacing, Repair and Improvement of Existing Site Entrance; • Replacement Bridge; • Gatehouse; • Internal Access Roads; and • Associated Grid Connection Works within the L52925 Public Roadway. The development will include the provision of 12 no. parking spaces, footpaths, landscaping, fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage infrastructure. The development includes for the demolition and removal of a dwelling (112 m²) and associated farmyard barn and outbuildings (94 m², 15 m², 17 m² and 45 m²), all within a total overall application boundary of 4.35 ha. It should be noted in respect of this planning application that permission is sought for a period of 25 years. / 6.2 km away / 22 December 2023Granted
- 17376NEW EXTENSION, RENOVATIONS AND ALTERATIONS TO THE EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS / 6.3 km away / 03 October 2017Granted
- 221029Five year permission for the development of a temporary access track adjacent to the L52926 local road, required to faciliate the delivery of turbine components to the consented Sheskin Wind Farm (P19/457). Locally sourced gravel will be used to create an access track on private lands adjacent to the L52926 so delivery vehicles can make a right turn from the N59 onto the L52926. The land required for the access track will be reinstated shortly after turbine components have been delivered / 6.3 km away / 24 January 2023Granted
- 221081Construct new dwelling house, construct new domestic garage, construct new effluent treatment system with all associated works, construct new domestic entrance off public road and carry out all required ancillary works on site / 7.0 km away / 11 September 2023Granted