Cluddaun, Moygownagh, Ballina
Planning application 24368
DecisionConditional grant
Decided15 April 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Cluddaun, Moygownagh, Ballina?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560104The proposed development consists of: One temporary for a period of three years, 100m high cable stayed triangular steel lattice tower meteorological mast fixed upon a wooden sleeper base of 2.4m x 2.4m; One lightning finial fitted to the higher level of the mast; One anti-climb device fitted to the lower level of the mast; 12 no. buried ground anchors located within three ‘lanes’ at 21m, 42m, 56m and 60m radii from the mast base; Meteorological instrumentation for measuring local climate conditions fixed to the meteorological mast including but not limited to: anemometers, wind vanes, temperature & pressure sensors; Shelter box with data logger and 100W photovoltaic panel fitted to the lower level of the mast; Bird flight deterrents discs fitted to each guy wire at approximately 10m intervals; Obstacle warning light fitted to the higher level of the mast; All associated infrastructure and ancillary works. A Natura Impact Statement has been prepared and will be submitted with the planning application. / 5.1 km away / 22 April 2025Granted
- 2460537A ten year permission for the development of a wind farm project. The development will consist of: - the construction of up to 8 No. wind turbines with a maximum overall tip height of between 176-180m, comprising rotor diameters ranging between 133-150m and hub heights ranging between 105-112m high; - associated wind turbine foundations and hard stand areas at each turbine; - 1 No. 38kV electrical substation building, compound and associated infrastructure works; - 1 No. temporary welfare site compound and associated works; - 20kV underground cables facilitating the connection of turbines to 38kV electrical substation and all associated infrastructure and works; - provision of a new temporary roadway connecting the R315 and the L51723 in the townland of Ballinglen to facilitate the delivery of turbine components and other abnormal loads; - widening and ancillary works to sections of the L51723 in the townlands of Keerglen and Ballykinlettragh; - provision of new permanent site access off the L51723; - upgrading of existing agricultural tracks and drainage infrastructure, and construction of new internal site tracks and all associated works as required; - construction of a clear-span bridge crossing the Keerglen River within the development area; - 1 no. borrow pit; - designated peat storage areas alongside internal side roads; - site drainage; - ancillary forestry felling to facilitate construction and operation of the proposed development; - all associated infrastructure and site development works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application. / 5.4 km away / 10 November 2025Granted
- 19457AMENDMENTS TO EXISTING PLANNING PERMISSION P15/825 FOR 8 TURBINES WITH AN OVERALL MAX HEIGHT OF 150M, AMENDMENTS TO INCLUDE - AN INCREASE IN THE OVERALL MAXIMUM HEIGHT OF THE TURBINES FROM 150M TO 176M (TURBINES 1-3) AND FROM 150M TO 165M (TURBINES 4-8) COMPRISING A TOWER 95-120M HIGH TO WHICH THREE BLADES OF 55-70M LENGTH WILL BE ATTACHED. AN INCREASE IN THE MAXIMUM HEIGHT OF THE PERMANENT MET MAST FROM 100M TO 120M. AN INCREASE IN THE DIAMETER OF THE FOUNDATION BASE FROM 22M TO 26M. AN AMENDMENT TO CONDITION NO 46 TO REVISE THE COMMUNITY BENEFIT PAYMENT TO 2 EURO//MWH TO BE CONSISTENT WITH GOVERNMENT GUIDANCE SET OUT UNDER THE RENEWABLE ELECTRICITY SUPPORT SCHEME. THE RED LINE BOUNDARY AND ALL OTHER ASPECTS OF THE PERMITTED DEVELOPMENT WILL REMAIN UNCHANGED / 6.1 km away / 06 November 2019Granted
- 2246RETAIN THE EXTENSION TO DWELLING HOUSE AS CONSTRUCTED / 7.6 km away / 21 March 2022Granted
- 22741RETAIN THE EXTENSION TO DWELLING HOUSE AS CONSTRUCTED / 7.6 km away / 19 October 2022Granted
- 23463A 10 year permission for the construction of a synchronous condenser facility comprising of a synchronous condenser and flywheel building, control and storage building, external support infrastructure, underground grid connection cabling, electrical components and associated works. A NIS has been prepared in respect of the planning application / 7.7 km away / 09 October 2023Granted
- 2560340The continued use of an existing guyed wind monitoring mast, with instruments, 100m in height on its lands at Shanvodinnaun, Co. Mayo for a further period of one year. The purpose of the mast is to assess the suitability of the company’s adjacent lands for wind farm development. Previous planning application references: 16/1013, 22/244. / 7.8 km away / 21 July 2025Granted
- 22244CONTINUED USE OF AN EXISTING GUYED WIND MONITORING MAST, WITH INSTRUMENTS 100M IN HEIGHT FOR A FURTHER PERIOD OF THREE YEARS. THE PURPOSE OF THE MAST IS TO ASSESS THE SUITABILITY OF THE COMPANY'S ADJACENT LANDS FOR WIND FARM DEVELOPMENT. PREVIOUS PLANNING REFERENCE P16/1013 / 7.8 km away / 17 May 2022Granted