Old Ashai Plant, Killala Business Park, Killala
Planning application 2360266
DecisionConditional grant
Decided27 May 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Old Ashai Plant, Killala Business Park, Killala?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460699We, Schutz (Ireland) Ltd., intend to apply for permission for development at this site at Killala Business Park, Tawnaghmore Lower, Killala, Co. Mayo, F26 XY18. The proposed development will consist of the following works: (a) Demolition of part of existing adjoining building to make provision for future extension as part of this application. (b) Demolition of temporary prefabricated buildings. (c) Construction of a fully serviced extension to side of existing building which will create additional production area for the existing facility, external plant mezzanine area and the construction of a two-storey office / admin block to the front of the development. (d) Alterations to elevations of existing building to include new wall cladding and windows. (e) New vehicular entrance off the existing service road to allow for HGV access to the rear of the site. (f) Site works to consist of alterations to existing service road, car parking, EV charging spaces, landscaping, lighting, the provision of a bicycle shelter, smoking shelter, covered outdoor seating area, forklift and gas compound, flag poles, signage and boundary treatments to the site. (g) Connection to existing foul, surface water, watermain and utility services networks. (h) All ancillary and associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning authority in connection with the application. The planning application including the Natura impact statement (NIS) may be inspected at the offices of Mayo County Council during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee (€20.00) within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions pr observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions or may refuse to grant permission. / 0.2 km away / 14 April 2025Granted
- 2460295Planning permission sought for (1) Installation of 2 no. proposed bulk storage silos (13.1m high) to the rear of existing building with all associated siteworks, (2) Alterations to site boundaries, (3) Retention of detached temporary prefabrication office ancillary building. (4) Retention of existing temporary smoking shelter and (5) Retention of relocation of previously approved storage container and retention of 1 no. additional storage container at Killala Business Park, Tawnaghmore Lower, Killala Co.Mayo, F26 XY18. / 0.2 km away / 08 July 2024Granted
- 18358A BATTERY STORAGE FACILITY WITHIN A TOTAL SITE AREA OF UP TO 1.18ha, TO INCLUDE 55 NO. SELF CONTAINED BATTERY CONTAINER UNITS WITH ASSOCIATED HVAC COOLING UNITS, 15 CONVERTER AND 15 SET UP TRANSFORMER CONTAINER UNITS, ASSOCIATED COMPOUND CABLING AND DUCTING, A GRID TRANSFORMER, A SINGLE STOREY SUBSTATION/CONTROL BUILDING WITH WELFARE FACILITIES, A CABLE ROUTE GRID CONNECTION TO THE EXISTING ESB SUBSTATION BUILDING, MAINTENANCE LIGHTING, SECURITY FENCING, A CCTV MONITORING SYSTEM, LANDSCAPING WORKS AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE ON LANDS WITHIN THE TAWNAGHMORE GENERATION STATION. A TEN YEAR PLANNING PERMISSION IS BEING SOUGHT TO CONSTRUCT THE DEVELOPMENT / 0.3 km away / 13 December 2018Granted
- 2560108The development will consist of the following elements: • Battery Energy Storage System facility, consisting of battery containers with integrated HVAC (Heating, Ventilation, Air Conditioning) units, transformers, inverters, underground cabling, associated control rooms, internal access routes, lighting, CCTV, lightning masts, fencing; • Associated Electrical Compound consisting of: Low voltage operations compound including one (1) single storey control and operational building, electrical plant, cabling, lighting, CCTV, lightning masts, diesel generator and diesel tank, operations and maintenance containers and stores; • High voltage electrical yard comprising outdoor electrical plant and associated compound; • Underground high voltage electrical cable to facilitate a connection to the existing adjacent 110kV Tawnaghmore substation; • Associated landscaping, drainage, decommissioning of existing septic tank and all ancillary works necessary to facilitate the development A 10-year permission is sought in respect of the development. Certain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details accompanies the application. The Tawnaghmore Power Station has an Environmental Protection Agency (EPA) issued Industrial Emissions (IE) Licence (Reg, No. P0566-02). / 0.3 km away / 24 April 2025Granted
- 2360134A nominal 50 megawatt electricity generating station, combusting woody biomass chips (domestic and imported) as well as a small proportion of fuel oil for boiler start-up. The total site area is 19.0 ha of which approximately 7 ha will be developed. The elements of the station are: weighbridges (2 no.), scale house, roundwood storage area, log deck, enclosed wood chipper, wood chip truck dump, wood chip receiving hopper, wood chip screen, wood chip hog, wood chip bins (2 no.), wood chip storage building, wood chip reclaimer, wood chip conveyors with associated magnetic separators, fuel oil storage tank and associated pumps, fuel oil generator, boiler house, baghouse, ash silo, induced draft fan room, boiler stack, combustion air and flue gas fans, boiler additive material receiving hoppers (3 no.), boiler additive conveyors with associated magnetic separators, boiler additive silos (3 no.), boiler water treatment tanks and associated pumps, ammonia tank and associated pumps, turbine hall (existing), control room (existing), cooling tower and associated pumps, water treatment building, waste water storage tank, fire water storage tank and associated pumps, compressed air system, high voltage transfer lines (3 no.), low voltage transfer lines (3 no.), GSU transformer, switchyard, switchyard MCC room (existing), storage and maintenance building (existing), garage, car park, HGV parking, flagpoles (3 no.), external lighting, CCTV cameras, internal road system, signage, construction compound, landscaping, foul and storm water disposal systems, storm water attenuation, wheel washes, gatehouses (2 no.), entrance gates, security fencing, and all associated site works and services. (See attached Description of Proposed Development document for more details.) / 0.3 km away / 20 February 2024Granted
- 201225 YEAR PERMISSION FOR AN ENERGY STORAGE FACILITY. THE DEVELOPMENT WILL COMPRISE OF A COMPOUND CONTAINING 4 NO. ENERGY STORAGE CONTAINERS WITH A CAPACITY OF UP TO 15MV AND ASSOCIATED TRANSFORMERS, SWITCHGEAR, A PRIMARY METERING CABINET, AN AUXILIARY TRANSFORMER UNIT, ELECTRICAL CABLE DUCTING OF APPROX 112M AND COMMUNICATIONS CABLE DUCTING OF APPROX 124M TO CONNECT TO THE EXISTING 38KV SUBSTATION ON THE KILLALA COMMUNITY WIND FARM SITE AND ALL ANCILLARY DEVELOPMENT / 0.4 km away / 25 June 2020Granted
- 22562ERECTION OF A ONE-STOREY EXTENSION TO EXISTING CABLE LANDING STATION, PROPOSED ESB SUBSTATION AND ALL ASSOCIATED SITE WORKS / 0.5 km away / 29 August 2022Granted
- 19351A 20m FREE-STANDING STRUCTURE CARRYING TELECOMMUNICATIONS EQUIPMENT TOGETHER WITH ASSOCIATED INFRASTRUCTURE INCLUDING UNDERGROUND CABLING AND ALL ANCILLARY DEVELOPMENT / 0.5 km away / 08 July 2019Granted