Killala Business Park, Tawnaghmore Lower, Killala Co.Mayo
Planning application 2460295
DecisionConditional grant
Decided08 July 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Killala Business Park, Tawnaghmore Lower, Killala Co.Mayo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460699We, Schutz (Ireland) Ltd., intend to apply for permission for development at this site at Killala Business Park, Tawnaghmore Lower, Killala, Co. Mayo, F26 XY18. The proposed development will consist of the following works: (a) Demolition of part of existing adjoining building to make provision for future extension as part of this application. (b) Demolition of temporary prefabricated buildings. (c) Construction of a fully serviced extension to side of existing building which will create additional production area for the existing facility, external plant mezzanine area and the construction of a two-storey office / admin block to the front of the development. (d) Alterations to elevations of existing building to include new wall cladding and windows. (e) New vehicular entrance off the existing service road to allow for HGV access to the rear of the site. (f) Site works to consist of alterations to existing service road, car parking, EV charging spaces, landscaping, lighting, the provision of a bicycle shelter, smoking shelter, covered outdoor seating area, forklift and gas compound, flag poles, signage and boundary treatments to the site. (g) Connection to existing foul, surface water, watermain and utility services networks. (h) All ancillary and associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning authority in connection with the application. The planning application including the Natura impact statement (NIS) may be inspected at the offices of Mayo County Council during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee (€20.00) within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions pr observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions or may refuse to grant permission. / 0.0 km away / 14 April 2025Granted
- 2360266The Proposed Development will consist of a Hydrogen Plant and an Energy Centre. The Hydrogen Plant, to the south of the site,will consist of a Double Storey Electrolyser Building of up to 24m height; Fin Fan Coolers of up to 10.5m height; Hydrogen Storage Area of 7m height; Hydrogen Gas Tube Filling Station of up to 9m height, Gas Injection Compound and Gas Above Ground Installation Building of 4m height; Electrical Substation up to 15m height and Ancillary Equipment Building of up to 3m height; Fire Water Tank of up to 14m height; Pump House of up to 5m height; Administration/welfare building and control block building of up to 4m height. The Energy Centre, to the north of the site, will consist of 9no. Gas Engines generating up to 106MW of power, housed in a Gas Engine Building of up to 13.6m height with two stacks of up to 25m height, Distillate fuel tank of up to 11.2m height, Firewater tank of up to 10m height, associated pumps, sludge tank of 2.1m height and Pump house of 5m Height, Electrical Building of 4m Height, Gate House of up to 4m Height, Administration/Welfare building of up to 4m Height. The Proposed Development includes the demolition and removal of the existing Asahi Plant buildings, foundations, as well as decommissioning and removal of the existing overhead, above ground drainage system and underground services. The Proposed Development will also include Resurfacing, Repair and Improvement of Existing Site Entrance and new Internal Access Roads which in turn opens onto the existing entrance road to the Ballina/Killala regional road (R314). The provision for 23 no. car parking spaces, footpaths, street lighting, external lighting, CCTV cameras, signage, security fencing, construction compound, and all other associated site development plant and equipment and other works including, utilities connections, potable water, stormwater, sewage, and foul wastewater drainage infrastructure, within a total overall application boundary of 6.88ha. / 0.2 km away / 27 May 2025Granted
- 22562ERECTION OF A ONE-STOREY EXTENSION TO EXISTING CABLE LANDING STATION, PROPOSED ESB SUBSTATION AND ALL ASSOCIATED SITE WORKS / 0.3 km away / 29 August 2022Granted
- 19351A 20m FREE-STANDING STRUCTURE CARRYING TELECOMMUNICATIONS EQUIPMENT TOGETHER WITH ASSOCIATED INFRASTRUCTURE INCLUDING UNDERGROUND CABLING AND ALL ANCILLARY DEVELOPMENT / 0.3 km away / 08 July 2019Granted
- 18362ERECTION OF 3 NO. NEW 18SQM SINGLE STOREY BESPOKE BUILT ELECTRICIAL PLANT ROOM CONTAINERS (eMod) AND THE ERECTION OF 1 NO. 3.6SQM CHILLER UNIT, AND RETENTION PERMISSION FOR 1 NO. 23SQM STEELTECH TOOL STORAGE SHED, AND ASSOCIATED SITE WORKS, ALL TO BE CONNECTED TO THE EXISTING CABLE LANDING STATION / 0.3 km away / 03 September 2018Granted
- 2360134A nominal 50 megawatt electricity generating station, combusting woody biomass chips (domestic and imported) as well as a small proportion of fuel oil for boiler start-up. The total site area is 19.0 ha of which approximately 7 ha will be developed. The elements of the station are: weighbridges (2 no.), scale house, roundwood storage area, log deck, enclosed wood chipper, wood chip truck dump, wood chip receiving hopper, wood chip screen, wood chip hog, wood chip bins (2 no.), wood chip storage building, wood chip reclaimer, wood chip conveyors with associated magnetic separators, fuel oil storage tank and associated pumps, fuel oil generator, boiler house, baghouse, ash silo, induced draft fan room, boiler stack, combustion air and flue gas fans, boiler additive material receiving hoppers (3 no.), boiler additive conveyors with associated magnetic separators, boiler additive silos (3 no.), boiler water treatment tanks and associated pumps, ammonia tank and associated pumps, turbine hall (existing), control room (existing), cooling tower and associated pumps, water treatment building, waste water storage tank, fire water storage tank and associated pumps, compressed air system, high voltage transfer lines (3 no.), low voltage transfer lines (3 no.), GSU transformer, switchyard, switchyard MCC room (existing), storage and maintenance building (existing), garage, car park, HGV parking, flagpoles (3 no.), external lighting, CCTV cameras, internal road system, signage, construction compound, landscaping, foul and storm water disposal systems, storm water attenuation, wheel washes, gatehouses (2 no.), entrance gates, security fencing, and all associated site works and services. (See attached Description of Proposed Development document for more details.) / 0.3 km away / 20 February 2024Granted
- 18358A BATTERY STORAGE FACILITY WITHIN A TOTAL SITE AREA OF UP TO 1.18ha, TO INCLUDE 55 NO. SELF CONTAINED BATTERY CONTAINER UNITS WITH ASSOCIATED HVAC COOLING UNITS, 15 CONVERTER AND 15 SET UP TRANSFORMER CONTAINER UNITS, ASSOCIATED COMPOUND CABLING AND DUCTING, A GRID TRANSFORMER, A SINGLE STOREY SUBSTATION/CONTROL BUILDING WITH WELFARE FACILITIES, A CABLE ROUTE GRID CONNECTION TO THE EXISTING ESB SUBSTATION BUILDING, MAINTENANCE LIGHTING, SECURITY FENCING, A CCTV MONITORING SYSTEM, LANDSCAPING WORKS AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE ON LANDS WITHIN THE TAWNAGHMORE GENERATION STATION. A TEN YEAR PLANNING PERMISSION IS BEING SOUGHT TO CONSTRUCT THE DEVELOPMENT / 0.5 km away / 13 December 2018Granted
- 2560108The development will consist of the following elements: • Battery Energy Storage System facility, consisting of battery containers with integrated HVAC (Heating, Ventilation, Air Conditioning) units, transformers, inverters, underground cabling, associated control rooms, internal access routes, lighting, CCTV, lightning masts, fencing; • Associated Electrical Compound consisting of: Low voltage operations compound including one (1) single storey control and operational building, electrical plant, cabling, lighting, CCTV, lightning masts, diesel generator and diesel tank, operations and maintenance containers and stores; • High voltage electrical yard comprising outdoor electrical plant and associated compound; • Underground high voltage electrical cable to facilitate a connection to the existing adjacent 110kV Tawnaghmore substation; • Associated landscaping, drainage, decommissioning of existing septic tank and all ancillary works necessary to facilitate the development A 10-year permission is sought in respect of the development. Certain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details accompanies the application. The Tawnaghmore Power Station has an Environmental Protection Agency (EPA) issued Industrial Emissions (IE) Licence (Reg, No. P0566-02). / 0.5 km away / 24 April 2025Granted