GrantedDecided 09 August 2019Meath County Council

Ashbourne Industrial Estate, Ashbourne, Co. Meath

Planning application AA190803
DecisionConditional grant
Decided09 August 2019
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Meath County Council.
Demolition of existing pumphouse associated with the disused sprinkler system located in the south eastern corner of the site, demolition of existing ESB substation and the erection of a new larger 35 sq.m substation, provision of steel roofed structure to cover the existing bunded area located on the south western boundary, provision of a new HGV reduced level loading bay along gridline H on south eastern elevation, a 30 sq. m compressor room and air handling unit located adjacent to the compresser room at ground floor level on the south eastern elevation between gridlines 3,6/H. Provision of a lean-to pallet storage area between gridlines HL/3 and the location of a waste compactor unit at the end of the lean-to adjacent to L/3. Provision of a new 83 space carpark and associated new entrance roadway and security barriers including wire mesh fencing and gateways on the south eastern corner of the site. Provision of HGV loading door and roller shutter on the eastern elevation along gridline L. Provision of a smoking shelter at the junction of gridlines 6/H. Provision of a bike storage area adjacent gridline 8/2. Demolition of an existing raised roof area between gridlines EF/4, and provision of a raised roof area (3.6m above existing roof level) to accommodate internal craneage between gridlines EF/3.5,5.5, there will be 2 number Air handling units located on top of this raised roof projection. Further provision of a raised roof area to accommodate internal craneage between IL/1,3, there will be one number Air handling unit located on top of this roof. Provision of new external cladding to all areas where cladding exists already, provision of 27 new slit windows 4.5m wide by.8m high to provide high level lighting on the wall elevations of the factory both at high level and on the raised roof projections at high level, all located on main existing factory wall elevations and new roof projections. Replacement of all windows in the current administration block between gridlines AB/2,6 Provision of van loading bays between E, G/6. Provision of two wall mounted signs 33 sq. m in area, provision of water attenuation tanks under the carpark located in the north western corner of the site and also on the northern boundary to connect into existing surface water drain in the north west corner of the site, removal of existing water tanks from the corner of the building adjacent to gridlines 6/B. provision of a new fire escape door and steps along gridline 3.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Meath has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Ashbourne Industrial Estate, Ashbourne, Co. Meath?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →