20336: Permission to construct 1 no poultry house together with all ancillary structures (to include meal storage bin(s) and soiled water tank(s)) and site works (including upgraded site entrance) associated with the above development
Lislongfield, Drum, Co Monaghan
DecisionConditional grant
Decided16 October 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Monaghan has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Lislongfield, Drum, Co Monaghan?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19439Permission for a development consisting of the construction of a new storey and a half rural dwelling house and single storey detached garage, new effluent treatment system and percolation area, and all associated site works. Significant further information relates to the amendment of site line boundary / 0.5 km away / 24 January 2020Granted
- 19242Permission for the installation of a meteorological mast with a maximum height of up to 100 metres supported by guy wires for the purpose of measuring and recording meteorological data and all associated site development and reinstatement works. The existing 80 metre meteorological mast, located on the subject site, was erected as exempted development in accordance with Class 20A, Schedule 2, of the Planning and Development Regulations 2001 (as amended). It is proposed to increase the overall height of this existing mast to up to 100 metres. Existing access arrangements to the proposed development site, using a public right of way, will remain unaltered. The operational lifetime of the proposed development will be up to five years. Significant further information relates to a revised development description. / 0.7 km away / 14 November 2019Granted
- 19486A ten year permission for the development of 8 no. wind turbines, each with a maximum tip height of up to 180 metres; and all associated site development, reinstatement, temporary and ancillary works including turbine foundations, crane hardstands, approximately 5.5 kilometres of site access tracks, permanent upgrade works to the L62012 and L62013 local roads, 11 no. site entrances, underground electricity and communications cabling, site drainage works, a temporary construction compound and a permanent meteorological mast with a maximum height of up to 101 metres. The proposed development will have a 30-year operational life from the date of commissioning of the entire development. The proposed development also includes permanent upgrade works along the R188, R183 and R189 regional roads in the townlands of Rakean, Lismagonway, Aghadrumkeen and Newbliss to accommodate the delivery of wind turbine components. Upgrade works will include the removal of roadside banks and vegetation, re-profiling of a vertical crest, the removal of 1 no. tree and the temporary lowering of a bridge parapet wall, and all associated site development and reinstatement works. This planning application is accompanied by an Environmental Impact Assessment Report which includes an assessment of the likely impacts of the proposed development, as a whole and in combination with the relevant off-site or secondary developments which will occur as a direct result of the proposed development, including connection to the national electricity grid, upgrade works to turbine component delivery routes and the importation and use of construction materials. The planning application is also accompanied by a Natura Impact Statement. Significant further information relates to revised plans. (NOTE 1ST AND 3RD PARTY APPEAL ON THIS FILE) / 0.7 km away / 17 July 2020Granted
- 21446Retain domestic garage and exit onto public road by way of existing entrance. previous planning 97/28 / 0.8 km away / 29 October 2021Granted
- 20215Permission for development consisting of to construct 3 No. poultry houses and 1 No. ancillary general purpose shed/store together with all ancillary structures (to include meal storage bin(s) and soiled water tank(s)) and site works (to include new/relocated site entrance) associated with the above development. This application relates to a development, which is for the purposes of an activity requiring a Licence under part IV of the Environmental Protection Agency (Licensing) Regulations 1994 to 2013. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted with this planning application. / 0.8 km away / 10 August 2020Granted
- 21136Permission to consist of a minor amendment to the development permitted under Monaghan County Council Planning Register Reference 19/486 to revise the alignment of the permitted access track between wind turbines T2 and T3. Significant further information received 30/07/2021. / 0.8 km away / 23 September 2021Granted
- 2360010Permission consisting of the erection of a detached part two-storey part single storey dwelling with attached garage, new site access to the public road with entrance gates and piers, access lane, waste-water treatment plant with percolation area and all associated site works. Significant Further Information relates to amendments to boundary, and amendments to site layout including the access lane / 1.0 km away / 07 July 2023Granted
- 2360285Permission for the installation of a Turbine Service Base Compound consisting of an Office/Canteen unit, 2 no. storage containers, a 2-person toilet block unit with an associated underground alarmed effluent tank, and all ancillary site works on an area adjacent to the existing Drumlins Park Wind farm 110kV Substation and Compound / 1.2 km away / 05 March 2024Granted