Clonarrow or Riverlyons, and Killoneen, Co. Offaly.
Planning application 2560189
DecisionConditional grant
Decided30 January 2026
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Offaly County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Offaly has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Clonarrow or Riverlyons, and Killoneen, Co. Offaly.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560563A) The erection of a temporary 100m high lattice type meteorological mast which will be secured to ground anchors by stay wires and will include instruments for measuring local climate conditions, services, and associated equipment; b) A fixed red aviation light will be fitted near the top of the lattice section of the proposed meteorological mast; c) Bird flight deterrent markers fitted to each stay wire at approximately 10m intervals; and d) All associated ancillary works. The temporary meteorological mast development will remain in position for a period of 5 years after which the mast, instruments, services, equipment, and all associated ancillary works will be removed. The purpose of the meteorological mast is to accurately measure the weather conditions at this site / 0.5 km away / 20 January 2026Granted
- 2560115The development of a recreational shared cycle and walkway located on Bord Na Móna lands. The development proposes the following: a) The delivery of a shared cycle and walkway on Bord na Móna lands. This will include the repurposing of 18,958 meters of existing former rail bed and 827 meters along pre-existing machine access routes. b) The proposed shared cycle and walkway will connect into the existing Grand Canal Way within the townlands of Coole and Knockballyboy; the Public Amenity Facilities at Mountlucas Wind Farm within the townlands of Clonarrow or Riverlyons and Drumcaw or Mountlucas; and the Cloncreen Wind Farm Amenity Track within the townland of Clongarret. c) The construction of car and / or bicycle parking facilities at a number of gateway locations along the proposed route and the provision of EV Charging spaces at the Gateway locations. This will include; i. 3 Type 3 Gateways, ii. 2 Type 4 Gateways, iii. 7 Minor Rest Points d) Upgrade works to 2 no. local access road crossings, and 6 no. agricultural crossings. e) Upgrade works to the Croghan Tippler Bridge (BNM Ref 37-109) and the Ballycon Rail Bridge (BNM Ref 37-112). f) The construction of a new pedestrian and cycle bridge extending to 30.5 meters spanning the Grand Canal within the Coole townland, located adjacent to the existing Grand Canal lift bridge (BNM Ref 37-05). g) The erection of wayfinding and interpretative signage at Gateway locations along the route. h) The implementation of Sustainable Drainage Systems (SuDS) nature-based drainage proposals at the Gateway locations to cater for surface water drainage at car park locations. i) Fencing and screening will be erected where required for biodiversity reasons which will include 7,636 meters of ecological screening. j) All other ancillary and associated site work. This Planning Application is accompanied by a Natura Impact Statement (NIS) / 0.6 km away / 29 January 2026Granted
- 22283(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE, (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM, (D) VEHICULAR ENTRANCE, (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 1.9 km away / 28 July 2022Granted
- 18480CHANGE OF PREVIOUS PLANNING PERMISSION REF. 13/226 BY CHANGE OF HOUSE DESIGN TO CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS AND SERVICES / 1.9 km away / 18 October 2019Granted
- 2660185The partial demolition of a shed and the construction of a single storey extension to an existing dwelling and the installation of a waste water treatment system and all associated site works / 2.0 km away / 02 June 2026Granted
- 20331CROGHAN BIOMASS FACILITY, LOCATED WITHIN THE TOWNLANDS OF ESKER BEG AND DRUMCAW OR MOUNTLUCAS, CO. OFFALY AT GRID REFERENCE 651434, 727855 FOR THE STORAGE AND SEASONING OF BIOMASS LOGS FOLLOWED BY CHIPPING OF THE SEASONED LOGS ON A SITE AREA OF 5.6 HA AND FOR THE FOLLOWING WORKS: (1) EXISTING STRUCTURES COMPRISING (A) WEIGHBRIDGE (120 SQ.M) AND (B) WEIGHBRIDGE CONTROL STATION (40 SQ.M); (2) AN ENTRANCE OFF THE R402 WITH A WALL, RAILINGS AND GATES; (3) PAVED AREAS OF THE SITE INCLUDING INTERNAL ROADWAYS (380 M), YARD AREA (1.1 HA) AND HARDSTANDING AREA (1,865 SQ.M); (4) UNPAVED ACCESS TRACKS (1.4KM LONG); (5) A LINEAR LOG STORAGE AREA 1.8KM LONG, C.4M WIDE AND UP TO 4.1M HIGH, EQUATING TO 9,400 TONNES OF WET LOGS. PLANNING PERMSSION IS SOUGHT FOR STORAGE OF BIOMASS MATERIAL (10,000 TONNES PER ANNUM) WITHIN THE FACILITY SUBJECT TO RETENTION AND FOR ALTERATIONS TO IMPROVE THE EXISTING ACCESS OFF THE R402 TO INCLUDE ROAD MARKINGS. THE DEVELOPMENT WILL INCLUDE ALL ANCILLARY WORKS. / 2.2 km away / 22 January 2021Granted
- 22339THE UPGRADE OF THE EXISTING DAINGEAN WASTEWATER TREATMENT PLANT AND WILL CONSIST OF THE FOLLOWING: THE CONSTRUCTION OF A NEW STORM WATER HOLDING TANK COMPLETE WITH INTERNAL CLEANING SYSTEM, INTERNAL STORM RETURN PUMPS, ACCESS STAIRS AND PLATFORM; CONSTRUCTION OF NEW SLUDGE DRYING REED BEDS COMPLETE WITH SLUDGE FEED PIPEWORK, FILTRATE RETURN PIPEWORK AND A FILTRATE RETURN PUMPING STATION; CONSTRUCTION OF NEW FINAL EFFLUENT WASH WATER PUMPING STATION; INSTALLATION OF A NEW MANUAL BYPASS CHANNEL AND GRIT CLASSIFIER ONTO THE EXISTING INLET SCREEN, INSTALLATION OF A GRP KIOSK TO HOUSE ELECTRICAL CONTROL PANEL; AND ALL ANCILLARY SITE WORKS / 2.3 km away / 14 November 2022Granted
- 2447A DOMESTIC GARAGE AND ASSOCIATE SITE DEVELOPMENT WORKS / 2.4 km away / 14 June 2024Granted