Townland of Clonarrow, or Riverlyons, County Offaly
Planning application 2560563
DecisionConditional grant
Decided20 January 2026
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Offaly County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Offaly has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Townland of Clonarrow, or Riverlyons, County Offaly?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560189For the erection of 4 wind turbines. A 10-year planning permission and 35 year operational life from the date of commissioning of the entire wind farm is being sought. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS). See full Development Description in attached document '7048 CWF - Development Description'. / 0.5 km away / 30 January 2026Granted
- 2560115The development of a recreational shared cycle and walkway located on Bord Na Móna lands. The development proposes the following: a) The delivery of a shared cycle and walkway on Bord na Móna lands. This will include the repurposing of 18,958 meters of existing former rail bed and 827 meters along pre-existing machine access routes. b) The proposed shared cycle and walkway will connect into the existing Grand Canal Way within the townlands of Coole and Knockballyboy; the Public Amenity Facilities at Mountlucas Wind Farm within the townlands of Clonarrow or Riverlyons and Drumcaw or Mountlucas; and the Cloncreen Wind Farm Amenity Track within the townland of Clongarret. c) The construction of car and / or bicycle parking facilities at a number of gateway locations along the proposed route and the provision of EV Charging spaces at the Gateway locations. This will include; i. 3 Type 3 Gateways, ii. 2 Type 4 Gateways, iii. 7 Minor Rest Points d) Upgrade works to 2 no. local access road crossings, and 6 no. agricultural crossings. e) Upgrade works to the Croghan Tippler Bridge (BNM Ref 37-109) and the Ballycon Rail Bridge (BNM Ref 37-112). f) The construction of a new pedestrian and cycle bridge extending to 30.5 meters spanning the Grand Canal within the Coole townland, located adjacent to the existing Grand Canal lift bridge (BNM Ref 37-05). g) The erection of wayfinding and interpretative signage at Gateway locations along the route. h) The implementation of Sustainable Drainage Systems (SuDS) nature-based drainage proposals at the Gateway locations to cater for surface water drainage at car park locations. i) Fencing and screening will be erected where required for biodiversity reasons which will include 7,636 meters of ecological screening. j) All other ancillary and associated site work. This Planning Application is accompanied by a Natura Impact Statement (NIS) / 1.1 km away / 29 January 2026Granted
- 2660185The partial demolition of a shed and the construction of a single storey extension to an existing dwelling and the installation of a waste water treatment system and all associated site works / 1.5 km away / 02 June 2026Granted
- 22339THE UPGRADE OF THE EXISTING DAINGEAN WASTEWATER TREATMENT PLANT AND WILL CONSIST OF THE FOLLOWING: THE CONSTRUCTION OF A NEW STORM WATER HOLDING TANK COMPLETE WITH INTERNAL CLEANING SYSTEM, INTERNAL STORM RETURN PUMPS, ACCESS STAIRS AND PLATFORM; CONSTRUCTION OF NEW SLUDGE DRYING REED BEDS COMPLETE WITH SLUDGE FEED PIPEWORK, FILTRATE RETURN PIPEWORK AND A FILTRATE RETURN PUMPING STATION; CONSTRUCTION OF NEW FINAL EFFLUENT WASH WATER PUMPING STATION; INSTALLATION OF A NEW MANUAL BYPASS CHANNEL AND GRIT CLASSIFIER ONTO THE EXISTING INLET SCREEN, INSTALLATION OF A GRP KIOSK TO HOUSE ELECTRICAL CONTROL PANEL; AND ALL ANCILLARY SITE WORKS / 2.1 km away / 14 November 2022Granted
- 21746AMENDMENTS TO THE PERMITTED EXTENSION TO THE MOUNTLUCAS SUBSTATION WHICH INCLUDES AN EXTENSION TO THE EXISTING COMPOUND TO ACCOMMODATE A BUSBAR EXTENSION AND DEDICATED BAY (OFFALY COUNTY COUNCIL REF. 20/218). THE PROPOSED AMENDMENTS INCLUDE A 25.5 SQ.M CONTROL ROOM EXTENSION TO THE EXISTING SUBSTATION CONTROL BUILDING AND ALTERATIONS TO THE LAYOUT OF THE PERMITTED BUSBAR EXTENSION AND DEDICATED BAY. PERMISSION IS ALSO SOUGHT FOR A TEMPORARY CONSTRUCTION COMPOUND ON SITE. PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND SUBMITTED IN RESPECT OF THE PROPOSED DEVELOPMENT / 2.2 km away / 02 February 2022Granted
- 2447A DOMESTIC GARAGE AND ASSOCIATE SITE DEVELOPMENT WORKS / 2.2 km away / 14 June 2024Granted
- 2560329The development will consist of the retention of a single-storey extension to the rear of the existing dwelling, including all associated site works and services / 2.2 km away / 17 September 2025Granted
- 22283(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE, (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM, (D) VEHICULAR ENTRANCE, (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 2.3 km away / 28 July 2022Granted