Site Number 2, IDA Finisklin Business Park, Finisklin
Planning application 19189
DecisionConditional grant
Decided27 June 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Sligo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Sligo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Site Number 2, IDA Finisklin Business Park, Finisklin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18458Development consisting of the demolition of a cold store extension (217 sqm gross floor area) to the rear of existing mixed use building (1,426 sqm gross floor area) with elevation alterations including a new entrance, reconfigured existing entrance with new canopies over both, new window opes, and new exterior finishes to the mixed use building, site works to include reconfigured surface car park to front and rear of building with proposed total of 42 no. car park spaces and 20 no cycle spaces along with all associated site development and landscaping works. / 0.1 km away / 18 January 2019Granted
- 21386Development consisting of a Sub-division of a part of unit 10 and change of use from light industrial to warehouse with the inclusion of ancillary trade counters (for the sale of building related products principally to trade) the remainder of the building will remain light industrial. Proposed works are as follows: internally the mezzanine level in the rear return will be removed. There would be trade counters inserted along with a proposed new access to the south of the unit. Externally and to the north of the building new bollards on "goods in" entrance; new mechanical plant area; on the south elevation new opening and access doors to service the trade counters and some levelling works along the footpath as well as remarking parking spaces to create a " clear area" and disabled space to the south of the building; block up the entrance on the east elevation. Proposed signage on the south elevation. All other ancillary works to complete the development / 0.1 km away / 16 November 2021Granted
- 2063Development consisting of the construction of a new link road at the IDA Finisklin Business Park, in the townland of Finisklin, Sligo, Co. Sligo. The works will consist of the construction of a new section of road that will link two existing cul de sacs with all ancillary works including footpaths, street lighting, ducting and drainage / 0.1 km away / 16 June 2020Granted
- 2358Development consisting of: 1.The demolition of a portion of the existing industrial units (B & C)(810SQM) to facilitate the construction, in their place, of a new portal frame unit (unit B), similar in height to the main retained unit (A). 2. The re-cladding of the retained industrial unit (A) along with new glazed openings and access doors. The building will be clad with profiled insulated metal cladding. 3. The resurfacing and upgrading of the associated service yard, the access route from Finisklin road and existing car parking to facilitate the new development and the provision of secure and sheltered bicycle parking with additional staff car parking spaces to the rear of the site. 4. All associated site and civil works including rainwater attenuation. / 0.1 km away / 13 July 2023Granted
- 2360205Free standing canopy at the loading bay at the east side of Unit No 1 St Colms Centre / 0.1 km away / 02 October 2023Granted
- 185For development consisting of 1. Construction of new 2 storey office / light Industrial building (floor area - 1297m2) Provision of connection to foul, storm & waterman services 3. Provision of street lighting and signage. 4. Provision of car parking located beside subject building and additional car parking on lands to the southeast of the access road and all associated site works / 0.2 km away / 16 May 2018Granted
- 21406PP - development consisting of the following: 1. Removal of existing small store and construction of a new three-bay extension to the rear of our existing factory for Assembly Area/Storage use (floor area - 487.7m2), 2. Connection to existing foul, storm and watermain services, 3. Provision of additional carparking, landscaping and all associated site works / 0.2 km away / 28 February 2022Granted
- 21186PP - development consisting of redevelopment at this site of our existing school. Part of the site is in the curtilage of the Ursuline Convent, a protected structure (FPS 43). The proposed development will consist of: - Demolition of ca. 1,556m2 of existing additions, extensions and temporary accommodation buildings; - Construction of New 4,357 m2 part 3-, and 2-, secondary school building, connected to existing 2006 2-storey extenion and Sports Hall building which is to be reconfigured, upgraded and its roof replaced; - Demolition of ca. 341m2 of additions and extensions adjoining historic buildings to be retained; - Refurbishment of and alterations to existing 1,506m2 1930 3-storey building with new lift extension and accessibility interventions; - Conservation works to existing 1860's Chapel and its repurposing as a music room; - Holding works for future use to 1860's building elements adjoining the Convent, a protected structure; - Holding works for future use to the 1860's building, which is proposed to return to being a stand-alone building after demolitions of additions and extensions thereto; - Separate staff car-park with vehicular access from existing northern gate to be modified and associated traffic works; - Upgrade to existing student vehicular drop-off, set-down and parking provisions to east; - Associated hard-surface play areas, landscaping, boundary treatments; - Associated surface water attenuation, foul and surface water drainage connections, site works and ancillary services; - Associated phased construction proposals to facilitate continuance of eduation provision during the works / 0.2 km away / 29 April 2022Granted