Unit 10 St. Colm's Centre, Finisklin Business Park, Sligo
Planning application 21386
DecisionConditional grant
Decided16 November 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Sligo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Sligo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit 10 St. Colm's Centre, Finisklin Business Park, Sligo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18458Development consisting of the demolition of a cold store extension (217 sqm gross floor area) to the rear of existing mixed use building (1,426 sqm gross floor area) with elevation alterations including a new entrance, reconfigured existing entrance with new canopies over both, new window opes, and new exterior finishes to the mixed use building, site works to include reconfigured surface car park to front and rear of building with proposed total of 42 no. car park spaces and 20 no cycle spaces along with all associated site development and landscaping works. / 0.0 km away / 18 January 2019Granted
- 2360205Free standing canopy at the loading bay at the east side of Unit No 1 St Colms Centre / 0.1 km away / 02 October 2023Granted
- 2358Development consisting of: 1.The demolition of a portion of the existing industrial units (B & C)(810SQM) to facilitate the construction, in their place, of a new portal frame unit (unit B), similar in height to the main retained unit (A). 2. The re-cladding of the retained industrial unit (A) along with new glazed openings and access doors. The building will be clad with profiled insulated metal cladding. 3. The resurfacing and upgrading of the associated service yard, the access route from Finisklin road and existing car parking to facilitate the new development and the provision of secure and sheltered bicycle parking with additional staff car parking spaces to the rear of the site. 4. All associated site and civil works including rainwater attenuation. / 0.1 km away / 13 July 2023Granted
- 19189For development consisting of (i) The construction of an ESB sub-station, (ii) The construction of an external yard/plant area to the rear of the existing building, (iii) The provision of a bicycle storage shed, (iv) The provision of a smoking hut, (v) Extension to, and completion of access roads to the site, (vi) Demolition of small out-building, (vii) The provision of public lighting on the site, (viii) An underground surface water sewer network including on-site attenuation and petrol/oil interceptor(s) and connections to existing surface water infrastructure, (ix) Corporates signage, (x) 3 no.flagpoles, (xI) 2 no. automated traffic barriers & site fencing/gates, (xii) Elevational changes to existing industrial unit, (xiii) Additional floor space to first floor, (xiv) Porches, and connections to services and all ancillary works / 0.1 km away / 27 June 2019Granted
- 2360189Change of use from a coal yard to a recycling facility. This includes the demolition of an existing storage building (287m2) and the construction of a proposed recycling facility (1124m2). The proposed development also includes: Construction of a maintenance shed (287m2), 3 no. storage containers (3 x 26.5m2), skip storage areas, 15 no. car parking spaces including 1 no. EV charging space and 1 no. accessible parking space, 8 no. truck parking spaces, covered bicycle stand for 5 no. bicycles, 1 no. new weighbridge and associated weighbridge office, security fencing on part of northwestern boundary, connections to all existing services, all ancillary site works. A Natura Impact Statement will be submitted to the planning authority with the planning application / 0.2 km away / 26 January 2024Granted
- 2063Development consisting of the construction of a new link road at the IDA Finisklin Business Park, in the townland of Finisklin, Sligo, Co. Sligo. The works will consist of the construction of a new section of road that will link two existing cul de sacs with all ancillary works including footpaths, street lighting, ducting and drainage / 0.2 km away / 16 June 2020Granted
- 20267Development consisting of the Material Change of Use from Office use to Medical Clinic / 0.2 km away / 28 September 2020Granted
- 2460042(a protected structure RPS no.301 SE), application site area 1.087 ha. The development consists of retention of demolition of existing concrete block wall and partial demolition of stone masonry wall within the curtilage of the protected structure, and will consist of proposed revisions to layout of existing car park and yard areas, including those within the curtilage of the protected structure, to provide a total of 100 no. car parking spaces comprised of an additional 30 no. car parking spaces, comprised of 28 no. car parking spaces within the carpark, and 2 no. car parking spaces accessed from Deepwater Quay; amendments to existing 70 no. car parking spaces to include revised layout to delineate 12 no. Informal car parking spaces, increase the number of accessible car parking spaces, the addition of bollards to delineate car park and yard areas, and new palisade fence to form revised boundary to yard to protected structure; works to stabilise stone masonry wall within the curtilage of the protected structure, and all associated ancillary site works and services. No works are proposed to the protected structure / 0.2 km away / 18 July 2024Granted