Unit 8, Beulah Buildings, Finisklin Road
Planning application 20267
DecisionConditional grant
Decided28 September 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Sligo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Sligo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit 8, Beulah Buildings, Finisklin Road?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 21186PP - development consisting of redevelopment at this site of our existing school. Part of the site is in the curtilage of the Ursuline Convent, a protected structure (FPS 43). The proposed development will consist of: - Demolition of ca. 1,556m2 of existing additions, extensions and temporary accommodation buildings; - Construction of New 4,357 m2 part 3-, and 2-, secondary school building, connected to existing 2006 2-storey extenion and Sports Hall building which is to be reconfigured, upgraded and its roof replaced; - Demolition of ca. 341m2 of additions and extensions adjoining historic buildings to be retained; - Refurbishment of and alterations to existing 1,506m2 1930 3-storey building with new lift extension and accessibility interventions; - Conservation works to existing 1860's Chapel and its repurposing as a music room; - Holding works for future use to 1860's building elements adjoining the Convent, a protected structure; - Holding works for future use to the 1860's building, which is proposed to return to being a stand-alone building after demolitions of additions and extensions thereto; - Separate staff car-park with vehicular access from existing northern gate to be modified and associated traffic works; - Upgrade to existing student vehicular drop-off, set-down and parking provisions to east; - Associated hard-surface play areas, landscaping, boundary treatments; - Associated surface water attenuation, foul and surface water drainage connections, site works and ancillary services; - Associated phased construction proposals to facilitate continuance of eduation provision during the works / 0.1 km away / 29 April 2022Granted
- 2460042(a protected structure RPS no.301 SE), application site area 1.087 ha. The development consists of retention of demolition of existing concrete block wall and partial demolition of stone masonry wall within the curtilage of the protected structure, and will consist of proposed revisions to layout of existing car park and yard areas, including those within the curtilage of the protected structure, to provide a total of 100 no. car parking spaces comprised of an additional 30 no. car parking spaces, comprised of 28 no. car parking spaces within the carpark, and 2 no. car parking spaces accessed from Deepwater Quay; amendments to existing 70 no. car parking spaces to include revised layout to delineate 12 no. Informal car parking spaces, increase the number of accessible car parking spaces, the addition of bollards to delineate car park and yard areas, and new palisade fence to form revised boundary to yard to protected structure; works to stabilise stone masonry wall within the curtilage of the protected structure, and all associated ancillary site works and services. No works are proposed to the protected structure / 0.1 km away / 18 July 2024Granted
- 2360205Free standing canopy at the loading bay at the east side of Unit No 1 St Colms Centre / 0.2 km away / 02 October 2023Granted
- 2360189Change of use from a coal yard to a recycling facility. This includes the demolition of an existing storage building (287m2) and the construction of a proposed recycling facility (1124m2). The proposed development also includes: Construction of a maintenance shed (287m2), 3 no. storage containers (3 x 26.5m2), skip storage areas, 15 no. car parking spaces including 1 no. EV charging space and 1 no. accessible parking space, 8 no. truck parking spaces, covered bicycle stand for 5 no. bicycles, 1 no. new weighbridge and associated weighbridge office, security fencing on part of northwestern boundary, connections to all existing services, all ancillary site works. A Natura Impact Statement will be submitted to the planning authority with the planning application / 0.2 km away / 26 January 2024Granted
- 21521Development consisting of the following (1) to retain 4 no. 5m High Canopy Legs, (2) Retain location of 4 no. forecourt pumps (3no. 4 Hose & 1 no. 6 Hose), (3) remove 2no. Pumps, (4) remove 2no. Shipping containers ancillary to existing car wash, (5) remove two-storey portacabin (2no. x 36m2) in use as temporary seating and offices sited against the south boundary fence, (6) remove 2no. 50,000L overground tanks (Kerosene & Diesel) and 1no. 40,000L overground tank (MGO) and bunding, (7) retain the change of use of the existing building (89.20m2) from light commercial to retail and café, (8) construct first floor (89.20m2) over existing shop to provide ancillary offices and construct 2 storey extension (181.80m2) to provide café and extra seating (9) retail to include off-licence for sale of intoxicating liquor, (10) proposed 4 no. 90,000L underground fuel tanks (2 no. Diesel tanks, 1 no, Kerosene tank and 1 no. Marked Gas Oil Tank), (11) proposed new 24m x 15m canopy at a height of 6m on existing canopy legs, (12) proposed 2no. fuel pumps (1no. 4 hose and 1 no. 6 hose), (13) proposed lighting to canopy and forecourt (14) proposed 6m tall Totem Sign, (15) proposed air, water and vacum service machine, (16) proposed vapour vent pipes on the east boundary, (17) proposed car wash, (18) car parking to facilitate the development, (19) all associated signage to the building and canopy and (20) all ancillary site works / 0.2 km away / 08 April 2022Granted
- 24604991) Retain construction of one & two storey 350 sqm extension to existing retail shop. The extension includes an increase to the retail shop floor area, which includes a hot food Deli counter & off-licence for sale of intoxicating liquor, ancillary Cafe seating, storage and staff office areas, 2) retain 24Hr Fuel Pump, 3) retain change to site boundary on south side of site, 4) erect associated signage to the new building, and 5) complete all ancillary site works / 0.2 km away / 22 May 2025Granted
- 1946For retention of development consisting of one freestanding Totem sign / 0.2 km away / 03 April 2019Granted
- 21386Development consisting of a Sub-division of a part of unit 10 and change of use from light industrial to warehouse with the inclusion of ancillary trade counters (for the sale of building related products principally to trade) the remainder of the building will remain light industrial. Proposed works are as follows: internally the mezzanine level in the rear return will be removed. There would be trade counters inserted along with a proposed new access to the south of the unit. Externally and to the north of the building new bollards on "goods in" entrance; new mechanical plant area; on the south elevation new opening and access doors to service the trade counters and some levelling works along the footpath as well as remarking parking spaces to create a " clear area" and disabled space to the south of the building; block up the entrance on the east elevation. Proposed signage on the south elevation. All other ancillary works to complete the development / 0.2 km away / 16 November 2021Granted