S01A/0144: Construction of a new commercial building.
Ballymount Industrial Estate, Walkinstown, Dublin 12.
DecisionGrant permission
Decided10 May 2001
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- S01A/0841Single storey store building / 0.0 km away / 23 May 2002Granted
- SD10A/0029A single storey showroom extension, with eaves heights of 6.50 and 6.10 metres, to the existing warehouse, the external finishes to match those of existing warehouse. / 0.0 km away / 08 April 2010Granted
- SD24A/0113Construction of 6 warehouse units with associated offices, associated signage for each unit, boundary treatment, associated drainage and ancillary siteworks. / 0.0 km away / 03 April 2025Granted
- SD07A/0900Construction of a new unit consisting of: (a) the construction of 4 no. industrial warehouses with associated offices; (b) associated signage for each unit; (c) external site works & associated parking; (d) boundary treatment; (e) associated drainage; (f) ancillary siteworks. / 0.0 km away / 15 January 2008Granted
- SD04A/0542Development at the existing Tyremaster building, which is located in the townland of Kilnamanagh. The development will consist of the change of use from tyre replacement centre to dry recyclable materials recovery facility in an existing ca. 0.065 ha. building, and use of a way leave for vehicles delivering and removing dry recyclables to and from the building proposed for change of use. The development will consist of accepting, processing and removing ca. 40,000 tonnes of dry recyclable materials per annum. An Environmental Impact Statement accompanies this planning application. / 0.1 km away / 06 December 2004Granted
- SD13A/0208Change the use of an industrial building to a waste transfer facility. The waste transfer facility will involve the collection, bailing and distribution of dry waste (only) as follows: tyres, cardboard and plastic. The baled waste will be transferred off-site for recycling. It is also proposed to demolish internal office space and provide a new entrance door in the south elevation to facilitate HGV access. / 0.1 km away / 16 January 2014Granted
- SD11A/0212Change of use from a store room to a depollution area contained within an existing building; the depollution area is used for the safe removal of all liquids/fluids as part of the appropriate treatment of end of life vehicles and as part of the procedures for the operation of an authorised treatment facility for end of life vehicles. / 0.1 km away / 26 October 2011Granted
- SD07A/0744Construction of a new single storey extension to the side (north) of the existing industrial units, with a total proposed floor area of 217.8sqm and all associated site works. / 0.1 km away / 19 December 2007Granted