SD24A/0113: Construction of 6 warehouse units with associated offices, associated signage for each unit, boundary treatment, associated drainage and ancillary siteworks.
Block B, Adjacent Lands South of Units G & F, Ballymount Drive, Ballymount Industrial Estate, Dublin 12
DecisionGrant permission
Decided03 April 2025
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD07A/0900Construction of a new unit consisting of: (a) the construction of 4 no. industrial warehouses with associated offices; (b) associated signage for each unit; (c) external site works & associated parking; (d) boundary treatment; (e) associated drainage; (f) ancillary siteworks. / 0.0 km away / 15 January 2008Granted
- S01A/0144Construction of a new commercial building. / 0.0 km away / 10 May 2001Granted
- SD06A/0785Retention & completion of new industrial units C7 & C8 granted permission under Ref: S99A/0603, incorporating four additional windows to south elevation, and associated works. / 0.1 km away / 12 March 2007Granted
- S99A/0603For 2 new industrial units (600 metre sq. total area), parking and associated works to adjoin existing Unit 6C. / 0.1 km away / 17 April 2000Granted
- SD04A/0274Revised elevation, mezzanine floor with offices, and all associated site works. / 0.1 km away / 09 November 2004Granted
- SD03A/0824Retention/completion of alterations to previously permitted development Plan Ref. No. SD02A/0459 and S00A/0746. The development will consist of minor alterations to door & window elements locations on all elevations and floor area changes from previous permitted area of 2394sq.m. - 2401sq.m. (A first floor area increase of 7sq.m.). / 0.1 km away / 23 December 2003Granted
- SD04A/0542Development at the existing Tyremaster building, which is located in the townland of Kilnamanagh. The development will consist of the change of use from tyre replacement centre to dry recyclable materials recovery facility in an existing ca. 0.065 ha. building, and use of a way leave for vehicles delivering and removing dry recyclables to and from the building proposed for change of use. The development will consist of accepting, processing and removing ca. 40,000 tonnes of dry recyclable materials per annum. An Environmental Impact Statement accompanies this planning application. / 0.1 km away / 06 December 2004Granted
- SD07A/0744Construction of a new single storey extension to the side (north) of the existing industrial units, with a total proposed floor area of 217.8sqm and all associated site works. / 0.1 km away / 19 December 2007Granted