SD02A/0167: Recovery of pre-sorted construction and demolition waste (namely concrete, bricks, tiles and ceramics, asphalt and topsoil) on a 3.9 hectare site within its existing landholding. Construction of an internal access road within Belgard Quarry, hardstanding area for stockpiling and waste recovery and waste inspection area (200m2). Provision is also made for portakabin office (39m2). Operations to be carried out include crushing and stockpiling of material using mobile plant.
Belgard Quarry, Cheeverstown, Co. Dublin.
DecisionGrant permission
Decided14 May 2002
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD07A/1047(a) new site access onto outer ring road; (b) 850m of new internal roadway; (c) provision of office, canteen and toilet facilies (270m2); (d) provision of security hut with associated toilet facility (20m2); (e) provision of 1 no. wheelwash; (f) provision of 3 no. weighbridges; (g) provision of 1 no oil interceptor; (h) provision of septic tank and associated percolation area; (i) provision of 20 no. car parking spaces; (j) public information signage; (k) canopy over docket exit area; (l) site landscaping. / 0.2 km away / 22 February 2008Granted
- SD07A/1047/EP(a) new site access onto outer ring road; (b) 850m of new internal roadway; (c) provision of office, canteen and toilet facilies (270sq.m.); (d) provision of security hut with associated toilet facility (20sq.m.); (e) provision of 1 no. wheelwash; (f) provision of 3 no. weighbridges; (g) provision of 1 no oil interceptor; (h) provision of septic tank and associated percolation area; (i) provision of 20 no. car parking spaces; (j) public information signage; (k) canopy over docket exit area; (l) site landscaping. / 0.2 km away / 26 March 2013Granted
- S99A/0156Warehouse and ancillary offices. / 0.2 km away / 23 June 1999Granted
- SD08A/0731Installation of an ESB 38kV Overhead Line Switching Compound at Roadstone Belgard Quarry Lands, in the part of the Quarry Lands which are located in the Townland of Cheeverstown, Barony of Upper Cross, Dublin 24. The location of the proposed Compound will be east of the recently commissioned New Outer Ring Road R136, Cheeverstown N7 to N81 and the east of the existing Screening Bund, which follows the route of the Outer Ring Road, in Belgard Quarry Lands Cheeverstown Townland, and will be adjacent to, and will be accessed from, the new Belgard Quarry entrance Road, off the above mentioned Outer Ring Road. The Compound will contain three no. 38kV 12 Metre Line Termination Masts and two no. Double Wood Portals. LBFM Switchgear will be installed at the top of the Double Wood Portals. The proposed Compund will measure 80 metres X 30 metres and will require the installation of a 2.4 metre High Palisade Fence, with gates for ESB access. The 38kV Overhead Line Switching Compound will be required to facilitate undergrounding of a section of the Grange Castle-Saggart/Tee Cheeverstown 38kV Line, while still maintaining a 38kV switching Facility for ESB Control of the circuit. / 0.2 km away / 15 December 2008Granted
- SD05A/0015Erection of a 24 metre high monopole telecommunications support structure carrying antennae with associated equipment cabin with an enclosed compound for mobile telecommunications purposes. / 0.2 km away / 18 May 2005Granted
- S01A/0078Revisions to previously approved planning application Reg. ref. no. S99A/0156. Retention of additional 138 square metres first floor office within the warehouse, a window 4 metre by 1 metre on the North West (side) elevation and a roller shutter door on the North East (rear) elevation. / 0.2 km away / 11 April 2001Granted
- SD16A/0126Retention of an existing 24 meter high telecommunications support structure, antennas, equipment container and associated equipment with a fenced compound and access track. The development forms part of Vodafone Ireland Limited's GSM and 3G Broadband telecommunications network. / 0.2 km away / 08 June 2016Granted
- SD10A/0113Existing 24 metre high telecommunications support structure, antennas, equipment container and associated equipment within a fenced compound and access track. The development forms part of Vodafone Ireland Limited's existing GSM and 3G Broadband telecommunications network. / 0.2 km away / 23 June 2010Granted