SD07A/1047: (a) new site access onto outer ring road; (b) 850m of new internal roadway; (c) provision of office, canteen and toilet facilies (270m2); (d) provision of security hut with associated toilet facility (20m2); (e) provision of 1 no. wheelwash; (f) provision of 3 no. weighbridges; (g) provision of 1 no oil interceptor; (h) provision of septic tank and associated percolation area; (i) provision of 20 no. car parking spaces; (j) public information signage; (k) canopy over docket exit area; (l) site landscaping.
Belgard Quarry, Cheeverstown Townland, Tallaght, Dublin 24
DecisionGrant permission
Decided22 February 2008
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD07A/1047/EP(a) new site access onto outer ring road; (b) 850m of new internal roadway; (c) provision of office, canteen and toilet facilies (270sq.m.); (d) provision of security hut with associated toilet facility (20sq.m.); (e) provision of 1 no. wheelwash; (f) provision of 3 no. weighbridges; (g) provision of 1 no oil interceptor; (h) provision of septic tank and associated percolation area; (i) provision of 20 no. car parking spaces; (j) public information signage; (k) canopy over docket exit area; (l) site landscaping. / 0.0 km away / 26 March 2013Granted
- SD08A/0731Installation of an ESB 38kV Overhead Line Switching Compound at Roadstone Belgard Quarry Lands, in the part of the Quarry Lands which are located in the Townland of Cheeverstown, Barony of Upper Cross, Dublin 24. The location of the proposed Compound will be east of the recently commissioned New Outer Ring Road R136, Cheeverstown N7 to N81 and the east of the existing Screening Bund, which follows the route of the Outer Ring Road, in Belgard Quarry Lands Cheeverstown Townland, and will be adjacent to, and will be accessed from, the new Belgard Quarry entrance Road, off the above mentioned Outer Ring Road. The Compound will contain three no. 38kV 12 Metre Line Termination Masts and two no. Double Wood Portals. LBFM Switchgear will be installed at the top of the Double Wood Portals. The proposed Compund will measure 80 metres X 30 metres and will require the installation of a 2.4 metre High Palisade Fence, with gates for ESB access. The 38kV Overhead Line Switching Compound will be required to facilitate undergrounding of a section of the Grange Castle-Saggart/Tee Cheeverstown 38kV Line, while still maintaining a 38kV switching Facility for ESB Control of the circuit. / 0.2 km away / 15 December 2008Granted
- SD02A/0167Recovery of pre-sorted construction and demolition waste (namely concrete, bricks, tiles and ceramics, asphalt and topsoil) on a 3.9 hectare site within its existing landholding. Construction of an internal access road within Belgard Quarry, hardstanding area for stockpiling and waste recovery and waste inspection area (200m2). Provision is also made for portakabin office (39m2). Operations to be carried out include crushing and stockpiling of material using mobile plant. / 0.2 km away / 14 May 2002Granted
- SD16A/0293Retention of the following: (1) Quarry control office & garage (1835sq.m) & 5 storage portacabins (14sq.m,14sq.m, 14sq.m 12.6sq.m & 8.4sq.m); (2) ESB switching station (58sq.m) & substation (36sq.m); (3) spare parts storage area (c. 2445sq.m); (4) maintenance shed (117.7sq.m); (5) car park (30 spaces & 627.7sq.m); (6) 2 lampost (10.5m high); (7) 'Clause 804' plant (1177.7sq.m); (8) wet sand plant (684.4sq.m); (9) 2 weighbridges (325.4sq.m); (10) general waste storage area (c. 12.5sq.m); (11) quarry fuelling station with two 9m3 fuel tanks (126.8sq.m); (12) metal recycling storage area (c.310sq.m); (13) truck parking area (c. 6632sq.m); (14) 1 security camera post (2.2m high); (15) 1 lamp post (9.2 high); (16) hydrocarbon interceptor; (17) tyre storage bays (c.140sq.m); (18) dry sand pant (2203.4sq.m); (19) 1 lamp post (10.3m high); (20) quarry stores (163sq.m); (21) effluent holding tank; (22) security station (13.9sq.m) and 2 lamp post (6.5m high); (23) wheel wash (236.3sq.m); (24) 'Tricel' effluent treatment system; (25) settlement lagoon system (3208.9sq.m); (26) sand polishing filter; (27) security fence (2.9m high); (28) overburden storage mound (7.3 ha); (29) perimeter screening berm (5m to 8m high by 1.6km long & 6ha); (30) perimeter screening berm (5.2m high by 310m long & 7930sq.m); (31) plant storage area ( 8356sq.m); (32) perimeter screening berm (9.2m high by 147 long & 4770sq.m); (33) screening berm (8.4m high by 340m long & 5257sq.m); (34) perimeter screening berm (6.5m high by 240m long & 5665sq.m); (35) perimeter screening berm (9m high by 320m long & 1ha); (36) screening berm (2.7m high by 245m long &3125sq.m); (37) screening berm (3.5m high by 950m long & 1.1ha); (38) screening berm (3m high by 243m long & 3030sq.m); (39) screening berm (3.3m high by 238m long & 2088sq.m); (40) settlement pond area (6.4ha); (41) screening berm (3.5m high by 379m long & 4793sq.m); (42) screening berm ( 3.1m high by 244m long & 3743sq.m); (43) internal access road (285m long) to Outer Ring Road entrance/exit, gate, pedestrian gates, footpaths, paladin fencing (1.8m high) & 6 lampposts (6m high); (44) screening berm (5.2m high by 215m long & 4040sq.m); (45) relocation of entrance to C&D recovery site permitted under SD02A/0167 & all ancillary site works; internal roads & landscape planting. / 0.2 km away / 29 June 2017Granted
- SD06A/0915The establishment of an asphalt plant and ancillary site facilities at the site stated above. The proposed asphalt plant has a maximum of height of 20 metres, includes a number of different components and has a total area of ca. 311.5sq.m. The proposed ancillary facilities include 4 no. portacabin site offices; a wheelwash facility, a weighbridge facility; a staff car-parking area; a hard-stand area: an ESB station, an internal road and an effluent treatment and disposal system. It is proposed to operate the asphalt plant 24 hours a day, seven days a week. Application is made operate the plant for a 30 year period / 0.3 km away / 01 March 2007Granted
- SD19A/0223Concrete plant (715sq.m) with a maximum height of 18 metres; extension to the extension to the existing Dry Mortar 'Flomix' plant (302sq.m) with a maximum height of 33.3 metres (Ref. SD16A/0410); truck wash out bays (187sq.m); a water storage tank (35sq.m.); ancillary facilities within a 1.50 hectare application area at the existing quarry. / 0.3 km away / 13 November 2019Granted
- S00A/08581,020 sq.m. single storey warehouse unit with associated 1,115 sq.m. 2-storey offices on 0.55 hectare site. Including all associated hard and soft landscaping site services, car parking and yard area. / 0.3 km away / 13 March 2001Granted
- S01A/0849Gazebo Smoking Shelter, external low level illuminated entrance sign and internal illuminated suspended sign in reception area. / 0.3 km away / 13 February 2002Granted