SD02A/0480: Relocation of existing jet car wash, provision of new automatic car wash, relocation of car parking, remove section of existing palisade fence and erect new section of palisade fence.
Grange Castle Filling Station, Nangor Road, Clondalkin Dublin 22
DecisionGrant permission
Decided14 November 2002
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Grange Castle Filling Station, Nangor Road, Clondalkin Dublin 22?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD13A/0149Retention of existing air conditioning condenser units and associated services with a modified layout affixed to the rear wall. / 0.0 km away / 12 September 2013Granted
- S99A/09596062 sq.m. of small enterprise units for light industrial and industry office use. The development will be sub- divided into either 16 or 25 units or combination thereof to suit occupier's size requirements. / 0.1 km away / 10 May 2000Granted
- SD07A/1059Phase 1 of a services and retail centre and will consist of 3 no. office blocks as follows: (1) Block A comprises a five storey office building of 3,019.6 sq.m. gross floor area which fronts onto the Nangor Road and which will accommodate 18 no. own door office units and 1 no. ESB substation; (2) Block B comprises a five storey office building of 2,905.1 sq.m gross floor area which fronts onto the Nangor Road and is located adjacent to the boundary with Grange Castle Golf Course - this block will accommodate 26 no. own door office units; (3) Block C comprises a four storey office building of 2,684.8 sq. m. gross floor area located adjacent to the boundary with Grange Castle Golf Course which will accommodate 24 no. own door office units. The proposed blocks are arranged in a u-shaped configuration around a central landscaped square. Vehicular access to the site is proposed via a left-turning entry and exit slip lane from the Nangor Road and also via the internal Spine Road permitted under application Reg. Ref. SD06A/0568. The proposed development includes 30 no. surface level car parking spaces and one level of underground car parking which will accommodate 200 no. car spaces. The development also includes all ancillary services, landscaping and site works on a site of 1.3163 hectares. This application is being lodged pursuant to application Reg. Ref: SD06A/0568 under which planning permission was granted for the development of roads and services to facilitate the 'Profile Park' Business Park. / 0.1 km away / 22 February 2008Granted
- S98A/0822Gatehouse, security barriers, gates and flanking walls. / 0.1 km away / 02 February 1999Granted
- SD21A/0186Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant rooms including internal generators, offices, lobbies, ancillary staff areas including break rooms and toilets, stores, stair/lift cores throughout and photovoltaic panels at roof level; the total gross floor area excluding hot air plenums and external staircase is c.9,601sq.m and the overall height of the data centre ranges from c.16m to c.20m to roof parapet level and up to c.24.48m including roof top plant, flues and lift overrun; provision of 5 external generators, 8 fuel tanks and ancillary plant contained within a plant yard to the north of DB8; provision of a water tank plant room, air cooled chillers and ancillary plant contained within a chiller plant yard to the south of DB8; provision of a water sprinkler pump room (c.23sqm), 2 sprinkler tanks (c.12m high each), heat recovery plant room (c.17sqm), ESB substation (c.44sqm), waste/bin stores (c.52sqm); total floor area of ancillary structures and plant (c.303sqm); provision of a delivery yard and loading bays, 64 car parking spaces, 5 motorcycle spaces, bicycle shelter serving 14 spaces, smoke shelter, internal access roads and footpaths, vehicular and pedestrian access to the west from Falcon Avenue and closure of an existing vehicular entrance from Falcon Avenue; all associated site development works, services provision, drainage works including attenuation, landscape and boundary treatment works including berming, hedgerow protection areas and security fencing; no buildings are proposed above the existing ESB wayleave and SDCC watermain wayleave to the west and north of the site; the area to the southwest of the site (temporary meadow) is reserved for a future data centre, subject of a separate application to South Dublin County Council on a site bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue. This application is accompanied by a Natura Impact Statement. / 0.1 km away / 24 March 2022Granted
- SD12A/0150Erection of a 2.4m high perimeter fence along Nangor Road boundary (approximately 250m long) with separate entrance gates for vehicular, bicycle and pedestrian access; construction of a single storey security hut with security barriers. / 0.2 km away / 22 October 2012Granted
- S00A/0625Installation of a non-illuminated sign comprising of individual letters and logo to be mounted to the building facade / 0.2 km away / 02 November 2000Granted
- SD15A/0133Construction of a single storey data centre, with offices (of circa. 1,560sq.m), storage space, computer and associated support areas, electrical component rooms, loading dock area (the building having a total gross floor area of c.7,609sq.m), roof plant and externally a generator compound (635sq.m), evaporative cooling tank, (150m3) & associated pump house (c.75sq.m), ESB sub station (c.68sq.m), drivers toilet (c.5sq.m), smoking shelter and carparking and bicycle facilities for the sole and only use of Microsoft Operations Ireland Ltd. in connection with this installation. For site safety purposes the provision of sprinkler tank of c.737m3 and associated water tank pump room of 75sq.m is proposed. Also included are ancillary site works for connection to existing Grange Castle infrastructural services as well as fencing, signage, perimeter services road around the building, 60 car parking spaces (including 5 universal accessible car parking spaces) and 18 bicycle spaces. The site perimeter will be enclosed with berming and landscaping to the frontage onto Technology Park Road and the New Nangor Road. All of the above for the sole use of Microsoft Operations Ireland Ltd. An EIS (Environomental Impact Statement) has been submitted with this application. / 0.2 km away / 15 October 2015Granted