SD03A/0018: Medical gas storage enclosures.
Adelaide and Meath Hospital Dublin, Incorporating The National Children's Hospital, Tallaght, Dublin 24
DecisionGrant permission
Decided05 March 2003
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD05A/0121Single storey 912m2 hospital extension and a single storey 236m2 extension to the pharmacy. / 0.0 km away / 13 June 2005Granted
- S00A/0851Retention of existing 757m2 single storey 2 pavillion Diabetes Clinic at Tallaght Hospital between existing Geriatric Unit and Psychiatric Unit / 0.0 km away / 28 February 2001Granted
- SD17A/0436Single storey first floor extension to the existing Intensive Care Unit (ICU) consisting of twelve isolation bedrooms, associated ancillary spaces, public waiting and overnight areas and staff areas. The proposed will be located on the roof of the existing ground floor outpatients department (existing roof finishes to be removed), connecting to the existing ICU at two locations, to an existing circulation route in one location and to the existing hospital street at one location. There will be no second floor accommodation with the exception of open air plant, screened plant and associated services with access for maintenance staff. / 0.0 km away / 06 February 2018Granted
- SD13A/0138Alterations and extensions to the Radiology Department in an internal courtyard at the north west of the hospital comprising a single storey extension to accommodate a second magnetic resonance imaging (MRI) scanner; an extended control room and associated technical equipment room total floor area of proposed extension approx. 61sq.m.; a screened area on the roof of the technical equipment room extending onto part of the MRI room to accommodate mechanical ventilation equipment; a 4.5m high quench pipe; the relocation of the door from a sub-waiting area to the courtyard; construction of a door to the corridor at first floor level to provide access to the roof of the extension and the mechanical plant; provision of an air-conditioning condenser in the courtyard; reconfiguration of the hard and soft landscaping in the remainder of the courtyard. / 0.0 km away / 03 September 2013Granted
- SD07A/0651Minor alterations to the main entrance and atrium area of the hospital comprising a one bay 38m2 draught lobby extension enclosing part of the existing entrance canopy, associated hard landscaping and minor alterations to an adjacent section of the existing elevation. / 0.1 km away / 01 October 2007Granted
- SD06A/0318Single storey extension to the existing Medical Records Department within internal courtyard "K" of the existing hospital complex, consisting of a 4.5m maximum high, 80sq.m. floor area Medical Records office facility, links to existing building and associated external works. / 0.1 km away / 20 June 2006Granted
- SD13A/0077Three ground level single storey extensions to the Emergency Department resulting in an increase in gross floor area of approximately 1,053sq.m. along with ancillary site works and associated mechanical and electrical plant including a screened ground level mechanical and electrical plant compound approximately 82sq.m; the existing gross floor area of the Emergency Department is approximately 2,167sq.m. / 0.1 km away / 20 June 2013Granted
- SD08A/01281 no. prefabricated office unit onto the existing flat roof at the first floor located in the Children's Department at the West of the hospital campus. The unit will have a total floor area of 110sqm and be a total height of 3.45m off the existing flat roof level. / 0.1 km away / 22 April 2008Granted