SD13A/0077: Three ground level single storey extensions to the Emergency Department resulting in an increase in gross floor area of approximately 1,053sq.m. along with ancillary site works and associated mechanical and electrical plant including a screened ground level mechanical and electrical plant compound approximately 82sq.m; the existing gross floor area of the Emergency Department is approximately 2,167sq.m.
Emergency Department, Adelaide & Meath Hospital Dublin, Belgard Square North, Tallaght, Dublin 24.
DecisionGrant permission
Decided20 June 2013
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD16A/0180Construction of a new two storey extension on the roof of the existing Emergency Department located on the east side of the campus, to provide new patient accommodation including a new renal dialysis unit incorporating treatment areas, support rooms and offices, two new stair and lift blocks and associated site works including plant rooms, a taxi set-down area, car parking and landscaping works. / 0.0 km away / 20 July 2016Granted
- SD21A/0014Construction of a new two storey extension adjacent to the existing Pharmacy Department located on the east side of the campus to provide a new Aseptic Pharmacy Unit incorporating laboratory areas; support rooms and first floor plantroom; external stairway; new exit door from the Pharmacy corridor to the adjacent service yard; new exit door from the delivery bay area to the hospital delivery yard and associated site and landscaping works. / 0.1 km away / 24 March 2021Granted
- SD03A/0018Medical gas storage enclosures. / 0.1 km away / 05 March 2003Granted
- SD05A/0121Single storey 912m2 hospital extension and a single storey 236m2 extension to the pharmacy. / 0.1 km away / 13 June 2005Granted
- S00A/0851Retention of existing 757m2 single storey 2 pavillion Diabetes Clinic at Tallaght Hospital between existing Geriatric Unit and Psychiatric Unit / 0.1 km away / 28 February 2001Granted
- SD17A/0436Single storey first floor extension to the existing Intensive Care Unit (ICU) consisting of twelve isolation bedrooms, associated ancillary spaces, public waiting and overnight areas and staff areas. The proposed will be located on the roof of the existing ground floor outpatients department (existing roof finishes to be removed), connecting to the existing ICU at two locations, to an existing circulation route in one location and to the existing hospital street at one location. There will be no second floor accommodation with the exception of open air plant, screened plant and associated services with access for maintenance staff. / 0.1 km away / 06 February 2018Granted
- SD08A/01281 no. prefabricated office unit onto the existing flat roof at the first floor located in the Children's Department at the West of the hospital campus. The unit will have a total floor area of 110sqm and be a total height of 3.45m off the existing flat roof level. / 0.1 km away / 22 April 2008Granted
- SD13A/0138Alterations and extensions to the Radiology Department in an internal courtyard at the north west of the hospital comprising a single storey extension to accommodate a second magnetic resonance imaging (MRI) scanner; an extended control room and associated technical equipment room total floor area of proposed extension approx. 61sq.m.; a screened area on the roof of the technical equipment room extending onto part of the MRI room to accommodate mechanical ventilation equipment; a 4.5m high quench pipe; the relocation of the door from a sub-waiting area to the courtyard; construction of a door to the corridor at first floor level to provide access to the roof of the extension and the mechanical plant; provision of an air-conditioning condenser in the courtyard; reconfiguration of the hard and soft landscaping in the remainder of the courtyard. / 0.1 km away / 03 September 2013Granted