SD21A/0014: Construction of a new two storey extension adjacent to the existing Pharmacy Department located on the east side of the campus to provide a new Aseptic Pharmacy Unit incorporating laboratory areas; support rooms and first floor plantroom; external stairway; new exit door from the Pharmacy corridor to the adjacent service yard; new exit door from the delivery bay area to the hospital delivery yard and associated site and landscaping works.
Tallaght University Hospital, Belgard Square North, Tallaght, Dublin 24
DecisionGrant permission
Decided24 March 2021
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD16A/0180Construction of a new two storey extension on the roof of the existing Emergency Department located on the east side of the campus, to provide new patient accommodation including a new renal dialysis unit incorporating treatment areas, support rooms and offices, two new stair and lift blocks and associated site works including plant rooms, a taxi set-down area, car parking and landscaping works. / 0.0 km away / 20 July 2016Granted
- SD13A/0077Three ground level single storey extensions to the Emergency Department resulting in an increase in gross floor area of approximately 1,053sq.m. along with ancillary site works and associated mechanical and electrical plant including a screened ground level mechanical and electrical plant compound approximately 82sq.m; the existing gross floor area of the Emergency Department is approximately 2,167sq.m. / 0.1 km away / 20 June 2013Granted
- SD23A/0046Amendments to a previously consented natural gas combined heat and power system and associated infrastructure (Ref. SD21A/0013). / 0.1 km away / 02 May 2023Granted
- SD21A/0013Installation and operation of a natural gas combined heat and power system and the associated infrastructure. / 0.1 km away / 24 March 2021Granted
- S98A/0807Retention of existing single storey temporary accommodation adjoining the catering department, consisting of teaching accommodation for Trinity College and Hospital office accommodation. / 0.1 km away / 28 January 1999Granted
- SD03A/0018Medical gas storage enclosures. / 0.1 km away / 05 March 2003Granted
- SD05A/0121Single storey 912m2 hospital extension and a single storey 236m2 extension to the pharmacy. / 0.1 km away / 13 June 2005Granted
- S00A/0851Retention of existing 757m2 single storey 2 pavillion Diabetes Clinic at Tallaght Hospital between existing Geriatric Unit and Psychiatric Unit / 0.1 km away / 28 February 2001Granted